                                             FORM EIA-923                                       OMB No. 1905-0129
                                       POWER PLANT OPERATIONS                          Approval Expires: 07/31/2029
                                         REPORT INSTRUCTIONS                                     Burden: 4.4 Hours



               Form EIA-923 collects information on the operation of electric power plants and combined heat and
               power (CHP) plants in the United States (see Required Respondents below). Data collected on this
               form include electric power generation, fuel consumption, fossil fuel stocks, delivered fossil fuel
               cost, combustion by-products, operational cooling water data, and operational data for NOx, SO2,
PURPOSE
               particulate matter, mercury, and acid gas control equipment. These data are used to monitor the
               status and trends of the electric power industry and appear in U.S. Energy Information
               Administration (EIA) publications and public databases.

               Form EIA-923 is a mandatory report for all electric power plants and CHP plants that meet the
               following criteria:
                         1) Have a total generator nameplate capacity (sum for generators at a single site) of 1
                              megawatt (MW) or greater; and
                         2) Where the generator(s), or the facility in which the generator(s) resides, is
                              connected to the local or regional electric power grid and has the ability to draw
                              power from the grid or deliver power to the grid.
REQUIRED                 3) In addition to power plants, fuel transfer terminals for generating stations, may be
RESPON-                       required to report on Form EIA-923.
DENTS          Monthly Respondents: To lessen the reporting burden, a sample of plants is collected on a
               monthly basis. Monthly respondents report Schedules 1 through 4B, and Schedule 9.
               Annual Respondents: Plants that are not selected to respond monthly must respond to all
               applicable schedules annually for the calendar year.
               Supplemental Respondents: Plants in the monthly sample are required to report Schedules 6 to
               8 annually if the criteria for those schedules are applicable.

               Monthly respondents are required to file Schedules 1 through 4B and Schedule 9 of this form
               with EIA by the last day of the month following the reporting period. For example, if reporting for
RESPONSE DUE   July, survey data are due to EIA on August 31.

               Annual and Supplemental respondents are required to file the form approximately 45 days
               after the online form opens for annual collection.

               Please note that EIA will make every effort to open the annual and supplemental surveys on the
               first business day of January following the reporting year.

               Submit your data electronically using EIA’s secure e-file system. This system uses security
               protocols to protect information against unauthorized access during transmission.

               If you have not registered with the e-file Single Sign-On (SSO) system, send an email message
               requesting assistance to: EIA-923@eia.gov.
METHODS OF
               If you have registered with SSO, log on at: https://signon.eia.gov/ssoserver/login
FILING
RESPONSE       Retain a completed copy of this survey form for your files.



               Please contact the EIA Survey Support Team using the following communication methods:

               By email:        eia4usa@eia.gov
QUESTIONS
               By phone:        1-855-EIA-4USA (1-855-342-4872)
                                [Monday through Friday, 8:00 AM to 6:00 PM E.T.]



                                                Page 1 of 41
                                         FORM EIA-923                                       OMB No. 1905-0129
                                   POWER PLANT OPERATIONS                             Approval Expires: 07/31/2029
                                                                                             Burden: 4.4 Hours
                                     REPORT INSTRUCTIONS




                                      GENERAL INSTRUCTIONS
Revisions to Data Previously Reported through the e-file System
Submit revisions to data previously reported as soon as possible after the error or omission is
discovered. Do not wait to revise data until the next reporting month’s form is due. Revisions or
adjustments to data should be made only to the survey month(s) to which they pertain (i.e., do not adjust
the current month to reflect a revision or adjustment to a prior month submission).
            Log on to the e-file system, re-key revised data, indicate in Schedule 9 the nature and date
             of the revision, and resubmit the data. If the e-file form is locked, contact EIA to request the
             form be opened for revision.
            Remember to save and RESUBMIT (click on the SUBMIT button). Resubmitting will allow
             the validation edits to re-validate the revised data element(s).
            Send an email message to EIA-923@eia.gov indicating the following:
             (1) the reporting month and year for which data are being revised,
             (2) the data that has been revised, and
             (3) the date of the revision.

Alternatively, if the e-file system has been closed for the reporting period, please send an email message
containing your changes to EIA-923@eia.gov, and indicate ‘Revision’ in subject line. Be sure to include
your Plant ID, the specific revision, and the month and year that is being revised.

Revisions to Data Previously Reported by Facsimile or Email Message
If you report via facsimile or email, you may send a corrected copy of the form, but be sure to indicate
the four items, discussed above, in Schedule 9.

Correcting Prepopulated Information
For e-file users, much of the information on the form is prepopulated by EIA. Verify the administrative
information on Schedule 1, and if changes are needed, send revisions via email to EIA-923@eia.gov.
Validation Edits
For e-file users, data that fail the interactive validation edits will be amassed into an edit log. Upon hitting
the “Submit” button, the system will notify you if there are edits in the log. You will be directed to the log
and given the opportunity to either revise the data in question or override the edit flag (thus leaving the
response values that triggered the error as is). When an edit is overridden, the system will ask for a
comment/explanation. Please leave a comment that explains the anomaly, rather than simply stating the
data are correct. Each comment is reviewed by EIA and, if the comment does not sufficiently explain the
anomaly, EIA will contact you for clarification.




                                             Page 2 of 41
                                            FORM EIA-923                                     OMB No. 1905-0129
                                      POWER PLANT OPERATIONS                           Approval Expires: 07/31/2029
                                        REPORT INSTRUCTIONS                                   Burden: 4.4 Hours



                                       SCHEDULE 1. IDENTIFICATION

    Verify preprinted information. Provide revisions to EIA via email at EIA-923@eia.gov.

1. Plant Name, Plant ID, and State: These data are established on the Form EIA-860. Revisions should
   be coordinated with the Form EIA-860 staff.
2. Survey Contact: Enter the person primarily responsible for completing the form.
3. Supervisor of Contact Person for Survey: Enter the supervisor of the primary contact as an alternative
   person in the event the primary contact becomes unavailable. The Survey Contact and Supervisor
   cannot be the same person.
4. Report for (Company and Plant): Enter the name of the operating company and plant. The plant
   identification number is assigned by EIA. Enter the plant state and county, and month or year for which
   data are being reported. State codes are two-character U.S. Postal Service abbreviations.
5. Regulatory Status: Indicate if the plant should be considered either a utility-operated regulated plant
   (plants where costs are recovered through rate regulation) or unregulated plant (independent power
   producers and commercial and industrial sector plants).
6. CHP Checkbox: Indicate whether or not this facility is a combined heat and power plant (CHP). A CHP
   plant produces both electric power and another form of useful thermal output, such as heat and/or steam
   for industrial processes, district heating/cooling, steam for purchase or hot water) from a common
   source.
7. CHP Plant Efficiency: If the CHP checkbox is “YES”, enter the efficiency of the combined heat and
   power plant. Report the annual average total CHP plant efficiency.
    To calculate the total plant efficiency, apply the following formula by dividing the sum of the energy
    outputs in Btu, including gross generation and useful thermal output, by the sum of the energy inputs
    (total fuels consumed converted to Btu).




    If gross generation is not available, use net generation as an approximation. Total Fuel Consumption
    (MMBtu) is found using Schedule 3 fuel quantities multiplied by their average heat content.

                       SCHEDULE 2. COST AND QUALITY OF FUEL PURCHASES

                                              General Instructions

    Required Respondents:
        1. Plants with one or more generating units primarily fueled by coal, natural gas, petroleum coke,
           distillate fuel oil, residual fuel oil, or hydrogen. Primary Fuel for each generator is reported on
           the Form EIA-860.
        2. Plants where the total generator nameplate capacity with a Primary Fuel of coal is 50 megawatts
           or greater; or the total generator nameplate capacity with a Primary Fuel of any combination of
           natural gas, petroleum coke, distillate fuel oil, residual fuel oil, or hydrogen is 200 megawatts or
           greater.
        3. Fuel transfer terminals and storage facilities serving generating plants, if the fuel purchases
           cannot be reported at the plant level.

                                               Page 3 of 41
                                             FORM EIA-923                                      OMB No. 1905-0129
                                       POWER PLANT OPERATIONS                            Approval Expires: 07/31/2029
                                         REPORT INSTRUCTIONS                                    Burden: 4.4 Hours




    Fuel transfer terminals and storage facilities guidelines: Report fuel purchases where quantity, cost,
    and quality data CANNOT be reported by the individual plants served by the fuel terminal. Report
    purchases either on the fuel terminal report OR the plant report, not both. Fuel terminals must list the
    plants served on Schedule 4B. Report transfers out as negative adjustments to stocks on Schedule 4A.

    Report for each fuel purchase: Report for purchases of all coal types, petroleum coke, distillate and
    residual fuel oils natural gas, and hydrogen by type of fuel, supplier, purchase type, contract expiration
    date, average cost per MMBtu, fuel quality, and for coal mine origin. Do not aggregate purchases.
    Report contract and spot market purchases separately, unless specifically instructed below.

    Annual Respondents may aggregate some purchases for the entire year provided the contract type and
    other identifying information, such as mine origin, are identical. For aggregated data, report weighted
    average costs and quality data.

    Coal Purchases: Report data by supplier and mine source. The mine information is reported on
    Schedule 2, Part C.

    Coal or petroleum coke which will be converted to synthesis gas at an Integrated Gasification
    Combined-Cycle (IGCC) plant: Report the fuel as it is received (i.e., as coal or petroleum coke).

    Petroleum Product Purchases: Report data by fuel type, supplier or broker, or refinery and, if
    applicable, port of entry. Report purchases of residual fuel oil, distillate fuel oil, and petroleum coke.

    Do Not Report the Following: Waste oil, kerosene, jet fuel, propane, or other petroleum products.

    Natural Gas and Hydrogen Purchases: Report natural gas and hydrogen purchases by supplier.
    Report each contract purchase (not spot purchases) as separate line items -- never aggregate the
    contracted purchases. Spot market natural gas or hydrogen purchases from various suppliers may be
    aggregated by each respective fuel type where it is impractical to list each individually, such as when
    numerous suppliers are used for many relatively small transactions. However, it is preferable to list
    each supplier separately. If you aggregate your data, report the weighted average cost and quality.

    Do Not Report the Following: Other gases such as manufactured gas (coke oven, refinery, or blast
    furnace gas), propane, landfill gas, or other miscellaneous gaseous fuels, or natural gas injected into
    storage. Report stored gas when it is received at the plant as an Adjustment on Schedule 4A. Do not
    report costs associated with storage.


          SCHEDULE 2. PART A. CONTRACT INFORMATION, PURCHASES, AND COSTS

1. Fuel Supplier Name: Supplier names and fuel codes are preprinted from the previous month’s report.
   Delete unneeded rows. Add supplier/fuel types from the drop-down lists. If the supplier is not on the list,
   contact EIA to have a new supplier added. If you choose “Name Pending” while waiting for a new
   supplier to be added, you MUST report the full supplier name in an override comment in response to the
   edit flag before the data can be submitted.

2. Purchase Type or Tolling Agreement: Use the following codes:
            C – Contract Purchase – Fuel received under a purchase order or contract with a term of one
            year or longer. Contracts with a shorter term are considered spot purchases (See below.)
            NC – New Contract or Renegotiated Contract Purchase – Fuel received under a purchase
            order or contract with a duration of one year or longer, under which deliveries were first made
            during the reporting month
            S – Spot-Market Purchase – Fuel received under a purchase order or contract with a duration
            of less than one year

                                                 Page 4 of 41
                                             FORM EIA-923                                    OMB No. 1905-0129
                                       POWER PLANT OPERATIONS                          Approval Expires: 07/31/2029
                                         REPORT INSTRUCTIONS                                  Burden: 4.4 Hours




            T – Tolling Agreement – Fuel received under a tolling agreement (bartering arrangement of fuel
            for generation)

3. Contract Expiration Date (MMYY): Report for Purchase Types C and NC the month and the year the
   purchase order or contract expires. For example, report “1119” for a November “2019” expiration date.
   This column should be left blank for Purchase Types S and T.
4. Energy Source: Identify fuels using the energy source codes listed in Table 1 for coal, petroleum coke,
   natural gas, distillate fuel oil, residual fuel oil, and hydrogen. A complete detailed list of energy sources
   is included in Table 8.

5. Units of Measure:
    Coal and petroleum coke receipts: short tons on an as-received dry basis (if wet, indicate in a comment
    on Schedule 9)
    Petroleum products’ receipts: barrels
    Natural gas and hydrogen: thousands of cubic feet (Mcf)

6. Quantity Purchased: Report the quantity of the fuel purchases for fuel that will ultimately be used for
   the generation of electricity and, at combined heat and power plants, for useful thermal output (process
   steam, district heating/cooling, space heating, or steam delivered to other end users).

    As far as possible, do not include fuel that will be used in boilers with no connection to an electric power
    generator or for use in other equipment. If fuel purchases cannot be separated, provide a comment on
    Schedule 9, Comments.

   Report start-up and flame-stabilization fuels.

   When fuel is purchased by and received at the plant and a portion is resold, report the quantity minus the
   amount resold, but report the original average costs and quality of the purchase.

7. Total Delivered Cost (for coal, petroleum products, petroleum coke, natural gas, and hydrogen):
   Enter the delivered cost of the fuel in cents per million Btu (MMBtu) to the nearest 0.1 cent. Include all
   costs incurred in the purchase and delivery of the fuel to the plant. Do not include adjustments associated
   with prior months’ fuel costs.

    Include any penalties/premiums paid or expected to be paid on the fuel delivered during the month in the
    delivered price for fuel shipped under contract. Make subsequent adjustments only by revising the cost
    in the month it was reported. Report only the current month fuel costs associated with the current month
    fuel deliveries. If a portion of a fuel purchase is resold, report the average cents per MMBtu paid for the
    original purchase. Do not discount the costs by the revenue received for the sale of the fuel.

    For coal, include maintenance and depreciation costs of coal delivered in railcars owned by the plant. Do
    not include unloading costs.

    For natural gas and hydrogen, include the following pipeline charges: fuel losses, transportation
    reservation charges, balancing costs, and distribution system costs outside of the plant. Because these
    types of fees can skew the cost of the fuel per MMBtu, provide an explanation in an edit log override
    comment when the price falls outside the range of expected cost, (e.g., “This price includes a
    reservation fee of x dollars.”).




                                                Page 5 of 41
                                             FORM EIA-923                                     OMB No. 1905-0129
                                       POWER PLANT OPERATIONS                           Approval Expires: 07/31/2029
                                         REPORT INSTRUCTIONS                                   Burden: 4.4 Hours




8. Commodity Cost (for coal, petroleum products, petroleum coke, natural gas, and hydrogen):
   Report the cost (in cents per million Btu rounded to the nearest 0.1 cent) at the point of first loading (free
   on board mine or transportation pipeline (FOB)), including taxes and quality-related charges or credits.
   Do not include loading and unloading charges, dust proofing, freeze conditioning, switching charges,
   diesel fuel surcharges, pipeline charges, transportation charges, or any other charges relating to the
   movement of the fuel to the point of use.


    In the case of natural gas and hydrogen, the commodity cost is typically the price of the gas FOB the
    transmission pipeline. In the case of coal, the commodity cost is FOB mine.

    For purchases associated with a hedging contract, report the actual fuel supply contract, not the hedge
    contract. Report the cost net of gains/losses as a result of the contract.




                                                Page 6 of 41
                                            FORM EIA-923                                    OMB No. 1905-0129
                                      POWER PLANT OPERATIONS                          Approval Expires: 07/31/2029
                                        REPORT INSTRUCTIONS                                  Burden: 4.4 Hours




     SCHEDULE 2. PART B. QUALITY AND TRANSPORTATION OF COAL, PETROLEUM
     PRODUCTS, AND PETROLEUM COKE

1. Fuel Supplier Name, Purchase Type, Quantity Purchased, and Energy Source: Data are
   prepopulated for e-file users based on the data entered on Schedule 2. Part A.

2. Heat Content: For all fuels, report the actual (not contractual) average Btu content for each fuel
   purchase in million (MMBtu) per ton, barrel, or thousand cubic feet. Present data values to the nearest
   0.001 MMBtu. Refer to Table 1, below, for approximate heat content ranges.

3. Sulfur Content: For coal, petroleum coke, and residual fuel oil, reports the sulfur content of the fuel in
   terms of sulfur percentage by weight. Present data values to the nearest 0.01 percent. Refer to Table 1
   for approximate sulfur content ranges.

4. Ash Content: For coal and petroleum coke, enter the ash content of the fuel in terms of ash percentage
   by weight. Present data values to the nearest 0.01 percent. Refer to Table 1 for approximate ash
   content ranges.

5. Moisture Content: For coal only, enter the moisture content of the fuel in terms of moisture percentage
   by weight. Present data values to the nearest 0.01 percent. Refer to Table 1 for approximate moisture
   content ranges.

6. Mercury Content: For coal only, enter the mercury content in parts per million (ppm). Present data
   values to the nearest 0.001 ppm. If lab tests of the coal receipts do not include the mercury content,
   enter the amount specified in the contract with the supplier. Refer to Table 1 for approximate mercury
   content ranges. If the mercury content is not known, mark the checkbox provided for unavailable
   mercury content.

7. Chlorine Content: For coal only, enter the chlorine content in parts per million (ppm). Present data
   values to the nearest 0.001 ppm. If lab tests of the coal do not include the chlorine content, enter the
   amount specified in the contract with the supplier. Refer to Table 1 for approximate chlorine content
   ranges. If the chlorine content is not known, mark the checkbox provided for unavailable chlorine
   content.




                                               Page 7 of 41
                                                  FORM EIA-923                                OMB No. 1905-0129
                                            POWER PLANT OPERATIONS                      Approval Expires: 07/31/2029
                                                                                               Burden: 4.4 Hours
                                              REPORT INSTRUCTIONS


                                                Table 1. Quality of Fuel
                                 Heat           Sulfur       Ash           Moisture       Mercury       Chlorine
Fuel
               Fuel Name        Content        Content      Content        Content        Content       Content
Code
                               (per unit)        (%)         (%)             (%)          (ppm)         (ppm)
 BIT     Bituminous Coal         19 -29        0.4 – 6.0   4.0 – 30.0      2.0 –16.0    0.020 – 0.500   30 -- 3000
 LIG     Lignite Coal           10 - 15        0.4 – 3.0   5.0 – 35.0    30.0 – 60.0    0.020 – 0.500   120 -- 300
SUB      Subbituminous Coal     15 - 20        0.2 – 1.5   3.0 – 15.0    10.0 – 45.0    0.020 – 0.200   40 -- 1200
ANT      Anthracite Coal        22 – 29        0.4 – 6.0   4.0 – 30.0      2.0 – 17.0   0.020 – 0.500   30 -- 3000
 RC      Refined Coal           20 – 29        0.2 – 6.0   3.0 – 30.0      2.0 – 30.0   0.020 – 0.500   30 -- 3000

 WC      Waste Coal             6.5 – 16       0.3 – 6.0   5.0 – 50.0      2.0 – 60.0   0.020 – 1.200   30 -- 3000

 PC      Petroleum Coke         24 – 30        1.0 – 7.0     0.1 – 1.2
RFO      Residual Fuel Oil      5.7 – 6.8      0.2 – 4.5

DFO      Distillate Fuel Oil    5.3 – 6.3

NG       Natural Gas            0.8 – 1.2



8. Fuel Transportation, Primary Mode: Report the method used to transport the fuel over the longest
    distance from point of origin to the consumer (the point of origin is the mine for coal deliveries). If the
    fuel was purchased from a broker or a fuel terminal, and the original mode of transportation is unknown
    to the purchaser, provide a reasonable assumption for the longest distance from the coal mine (e.g.,
    coal moved from western to eastern states is most likely transported primarily by rail). If the shipment
    involves only one mode of transportation, that mode is considered the primary mode. If the shipment
    involves more than one mode of transportation, see the description of secondary mode below.

9. Secondary Mode: If you used more than one mode of transportation in a single shipment, the secondary
    mode of transportation is the second longest distance used to transport the fuel to the consumer. If you
    used more than two transportation modes in a single shipment, report only the primary and secondary
    modes.

      Do Not Report the Following: The transportation modes used entirely within a mine, terminal, or
      power plant or exclusively on private roads between a mine and rail load-out or barge terminal (e.g.,
      trucks used to move coal from a mine pit to the mine load-out; conveyors at a power plant used to move
      coal from the plant storage pile to the plant).

      Mine-Mouth Coal Plants: Report “Conveyor” as the primary mode, if the conveyor feeding coal to the
      plant site originates at the mine. Otherwise, report the primary mode (typically truck or rail) used to
      move the coal to the plant site.

      Transportation Mode Codes:
      RR – Rail: Shipments of fuel moved to consumers by rail (private or public/commercial). Included is
      coal hauled to or away from a railroad siding by truck, if the truck did not use public roads.
      RV – River: Shipments of fuel moved to consumers via river by barge. Not included are shipments to
      Great Lakes coal loading docks, tidewater piers, or coastal ports.




                                                  Page 8 of 41
                                           FORM EIA-923                                   OMB No. 1905-0129
                                     POWER PLANT OPERATIONS                         Approval Expires: 07/31/2029
                                                                                           Burden: 4.4 Hours
                                       REPORT INSTRUCTIONS



   GL – Great Lakes: Shipments of coal moved to consumers via the Great Lakes. These shipments are
   moved via the Great Lakes coal loading docks, which are identified by name and location, as follows:

       Conneaut Coal Storage & Transfer, Conneaut, Ohio
       NS Coal Dock (Ashtabula Coal Dock), Ashtabula, Ohio
       Sandusky Coal Pier, Sandusky, Ohio
       Toledo Docks, Toledo, Ohio
       KCBX Terminals Inc., Chicago, Illinois
       Superior Midwest Energy Terminal, Superior, Wisconsin

   TP – Tidewater Piers and Coastal Ports: Shipments of coal moved to Tidewater Piers and Coastal
   Ports for further shipments to consumers, via coastal water or ocean. The Tidewater Piers and Coastal
   Ports are identified by name and location, as follows:
       Dominion Terminal Associates, Newport News, Virginia
       McDuffie Coal Terminal, Mobile, Alabama
       IC Railmarine Terminal, Convent, Louisiana International
       Marine Terminals, Myrtle Grove, Louisiana Cooper/T. Smith Stevedoring Co. Inc., Darrow,
       Louisiana Seward Terminal Inc., Seward, Alaska
       Los Angeles Export Terminal, Inc., Los Angeles, California
       Levin-Richmond Terminal Corp., Richmond, California
       Baltimore Terminal, Baltimore, Maryland
       Norfolk Southern Lamberts Point P-6, Norfolk, Virginia
       Chesapeake Bay Piers, Baltimore, Maryland
       Pier IX Terminal Company, Newport News, Virginia
       Electro-Coal Transport Corp., Davant, Louisiana

   WT – Water: Shipments of fuel moved to consumers by other waterways.

   TR – Truck: Shipments of fuel moved to consumers by truck. Not included is fuel hauled to or away
   from a railroad siding by truck, on non-public roads.

   TC – Tramway/Conveyor: Shipments of fuel moved to consumers by tramway or conveyor.

   SP – Slurry Pipeline: Shipments of coal moved to consumers by slurry pipeline.

   PL – Pipeline: Shipments of fuel moved to consumers by pipeline.

   OP – On-Site Production: Fuel is produced on site, making fuel shipment unnecessary.


10. Natural Gas Contract Information – Supply and Delivery Service Contract Type Codes:

   F – Firm – Gas transportation service or supply contract provided on a firm basis (i.e., the contract with
   the gas transportation company anticipates no interruption of gas transportation or supply service).
   Firm transportation service takes priority over interruptible service.
   I – Interruptible – Gas transportation service or supply provided under schedules, or contracts, which
   anticipate and permit interruption on short notice, such as in peak-load seasons, by reason of the claim
   of firm service customers and higher priority users.




                                              Page 9 of 41
                                              FORM EIA-923                                        OMB No. 1905-0129
                                        POWER PLANT OPERATIONS                              Approval Expires: 07/31/2029
                                                                                                   Burden: 4.4 Hours
                                          REPORT INSTRUCTIONS




                                SCHEDULE 2. PART C. COAL MINE INFORMATION

1. Fuel Supplier Name, Purchase Type, Quantity Purchased, and Energy Source: Data are
   prepopulated for e-file users based on the data entered on Schedule 2. Part A.

2. State or Country of Origin: Choose the two-letter U.S. Postal Service abbreviation or country code from
   the drop-down list of coal producing states. For imported coal, choose the two-letter country code,
   shown below:
        AS – Australia; CN – Canada; CL – Colombia; IS – Indonesia; PL – Poland;
        RS – Russia; VZ – Venezuela; OT – Other (specify the country in Schedule 9).


    The state of origin is mandatory. If purchases originate from a broker, barge site or other third party, you
    must contact the broker, barge site, or other party and find out the state(s) where the coal originated.

    If coal purchased under a purchase order or contract originates in more than one state, determine from the
    supplier the most dominant or probable state(s) of origin for the coal. If the amount of coal from each
    state/mine is known, allocate the purchase among the states accordingly. If the amount of coal from each
    state is not known, report the state from which the majority of the coal originated.

3. Mine Information: Choose the mine from the drop-down list. The list will display only those mines
   located in the chosen state/country of origin. The displayed information includes the mine operating
   company, for informational purposes, to aid in identifying the mine of origin. Upon choosing a mine, the
   MSHA ID, Mine Name, Mine Type and Mine County will automatically be populated. Mine types include
   U (underground), S (surface), U/S (both an underground and surface mine with most coal extracted
   underground), S/U (both an underground and surface mine with most coal extracted from the surface),
   and P (preparation plant – coal is purchased from a preparation plant where it is mechanically cleaned to
   remove soil and rock, crushed, and then screened/sorted into sizes appropriate for different uses.

    If the mine is not on the list, contact EIA if the mine is not on the list, if the mine is unknown, or if the coal
    came from multiple mines.



      SCHEDULE 3. PART A. BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC
                              COMBUSTIBLE-FUELED PLANTS

                                                   General Instructions


Required Respondents: Plants with steam turbines (ST) driven by steam from a boiler fueled by
combustible fuels must report the fuel consumed in each boiler and the electric power output of each
generator.

Do not report for steam turbines where the exclusive energy source is nuclear, geothermal, solar, purchased
steam, or waste heat.

Report a value for EACH MONTH. However, plants with less than 10 MW steam-electric nameplate capacity
may report annual values for the calendar year.



                                                  Page 10 of 41
                                              FORM EIA-923                                          OMB No. 1905-0129
                                        POWER PLANT OPERATIONS                                Approval Expires: 07/31/2029
                                                                                                     Burden: 4.4 Hours
                                          REPORT INSTRUCTIONS



Do not leave fuel quantity and net /gross generation blank. Report zeros when no fuel is consumed or
electric power generated.

1. Prime Mover Code: The prime mover code is prepopulated. The only valid code on Schedule 3A is
   ST. For a complete list of prime mover codes, refer to Table 7.

2. Boiler ID: Boiler IDs are prepopulated from the latest reported Form EIA-860, Annual Electric Generator
   Report. If a Boiler ID needs to be added to Schedule 3A, either choose the ID from the drop-down list or
   contact EIA to have it added to the list. Boiler IDs must match those reported on the Form EIA-860.

3. Boiler Status: Report the status of the boiler during the current reporting period. Enter one of the codes
   listed in Table 2 below:
                                          Table 2. Boiler Status Codes

               Code                                        Boiler Status
                OP     Operating (in commercial service or out of service less than 365 days)
                OS     Out of service (365 days or longer)

                OA     Temporarily out of service (less than 365 days)

                RE     Retired (no longer in service and not expected to be returned to service)

                SB     Standby (or inactive reserve); i.e., not normally used, but available for service

                TS     Construction complete and receiving revenue from the sale of electricity, but not
                       yet in commercial operation

4. Energy Source: Energy source codes used in the previous reporting period are prepopulated for the
   current reporting period. Additional codes are listed in Table 8 and can be chosen via the drop-down list.
   For blended coal products, report an estimated allocation for each coal rank, if this allocation can be
   determined. For energy source codes OTH, OBS, OBG, OBL and OG, specify the fuel in the text box at
   the bottom of the data table.

5. Quantity: For each month, report the amount of fuel consumed in each boiler for electric power
   generation and, at combined heat and power stations, for useful thermal output. Do not leave blank.
   Report zero if the fuel was not used in the current reporting period.

6. Type of Units: Report physical units of fuel consumption as follows: solids in tons; liquids in barrels
   (one barrel equals 42 U.S. gallons); and gases in thousands of cubic feet (Mcf).

7. Average Heat Content: Report for all fuels, the average heat content as burned to the nearest 0.001
   million Btu (MMBtu) per physical unit. Report the value in the following units: solids in million Btu
   (MMBtu) per ton; liquids in MMBtu per barrel; and gases in MMBtu per thousand cubic feet (Mcf). Refer
   to Table 8 for approximate ranges of heat content of specific energy sources.

    Report the heat content of the fuel as the gross or “higher heating value” (rather than the net or lower
    heating value). The higher heating value exceeds the lower heating value by the latent heat of
    vaporization of the water.

    The heating value of fuels that is generally used and reported in a fuel analysis, unless otherwise
    specified, is the higher heating value. If the fuel heat content cannot be reported “as burned,” obtain
    data from the fuel supplier on an “as received” basis.




                                                  Page 11 of 41
                                               FORM EIA-923                                         OMB No. 1905-0129
                                         POWER PLANT OPERATIONS                               Approval Expires: 07/31/2029
                                                                                                     Burden: 4.4 Hours
                                           REPORT INSTRUCTIONS




8. Sulfur Content (petroleum, petroleum coke, and coal): For each month, enter sulfur content to
   nearest 0.01 percent by weight. Report sulfur content for the following energy source codes: ANT, BIT,
    LIG, RC, SUB, WC, PC, RFO, and WO.                      Refer to Table 1 for approximate sulfur content
    ranges.

9. Ash Content (coal and petroleum coke): Report ash content to the nearest 0.1 percent by weight.
   Report ash content for the following fuel codes: ANT, BIT, LIG, SUB, WC, RC, and PC. Refer to Table 1
   for approximate ash content ranges.

10. Generator ID: Generator IDs are prepopulated on the e-file system form. For a Generator ID that is not
    prepopulated, choose the ID from the drop-down list of Generator IDs which were reported for your plant
    on the Form EIA-860. If the Generator ID is not on the selection list, contact EIA to have the ID added to
    your form. Generator IDs must match those reported on the Form EIA-860.

11. Generator Status: Enter one of the codes listed in Table 3 below.


                                         Table 3. Generator Status Codes

         Status
                                                     Status Code Description
         Code
          OP      Operating - in service (commercial operation) and producing some electricity. Includes
                  peaking units that are run on an as-needed (intermittent or seasonal) basis.

          OA      Temporarily out of service – for less than 365 days


          OS      Out of service – was not used for some or all of the reporting period and is NOT expected to
                  be returned to service in the next 365 days

           SB     Standby/Backup - available for service but not normally used (has little or no generation
                  during the year) for this reporting period

           TS     Construction complete and receiving revenue from the sale of electricity, but not yet in
                  commercial operation

           RE     Retired - no longer in service and not expected to be returned to service



12. Gross Generation: Report the total amount of electric energy produced by generating units and
    measured at the generating terminal in megawatthours, rounded to the nearest whole number (no decimals).

13. Net Generation: Enter the net generation (gross generation minus the parasitic station load, i.e., station
    use) in megawatthours. If the monthly station service load exceeded the monthly gross electrical
    generation, report negative net generation with a minus sign, not with parentheses.

If your plant is a combined heat and power plant in the Industrial or Commercial Sector, you may choose to
leave net generation blank in cases where net generation cannot be determined. Please note that net
generation is not defined as electric power sold to the grid (net of direct use), but as gross generation minus
station use. If station use is not separable from direct use at combined heat and power plants, report only
gross generation, and leave net generation blank. Enter a comment on Schedule 9 if net generation is not
reported.



                                                   Page 12 of 41
                                            FORM EIA-923                                     OMB No. 1905-0129
                                      POWER PLANT OPERATIONS                           Approval Expires: 07/31/2029
                                                                                              Burden: 4.4 Hours
                                        REPORT INSTRUCTIONS



           SCHEDULE 3. PART B. FUEL AND GENERATOR INFORMATION FOR SINGLE-
          CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES, HYDROELECTRIC
             PUMPED STORAGE, COMPRESSED AIR STORAGE AND OTHER ENEGY
                STORAGE TECHNOLOGIES THAT DELIVER ELECTRIC POWER
Required Respondents: Plants with single-cycle gas turbines (GT), internal combustion engines (IC), fuel
cells (FC), pumped-storage hydroelectric plants (PS), compressed air units (CE), other energy storage
technologies that deliver electric power such as batteries (BA) and flywheel (FW) electric storage units, or
other miscellaneous prime mover types (OT) must report the fuel consumed in the turbines and engines,
the electrical energy consumed for storage technologies, and the electric power output for each technology
type.

Annual respondents with plants that have one or more fuel cell (FC), pumped storage (PS), compressed air
units (CE), battery electric storage units (BA), or flywheel electric storage units (FW) report operational data
for all prime movers at plant for each month. All other annual respondents report data for the calendar year
(do not break down by month).Group all generators of one type together. Do not report for each individual
generator. For example, report natural gas consumed and megawatthours produced for all single-cycle gas
turbines at the plant as a single value.

Do not report for conventional hydroelectric generators, combined-cycle generators or generators driven by
wind, solar, geothermal, and nuclear. These are collected on Schedules 3C and 3D.

Do not leave fuel quantity and net /gross generation blank. Report zeros when no fuel is consumed or
electric power generated.

1. Prime Mover Code: The prime mover codes are prepopulated on the form. If a code needs to be
   added, choose from the drop-down list. Prime mover descriptions and codes are listed in Table 7.

2. Energy Source: Energy source codes used in the previous reporting period are prepopulated for the
   current reporting period. Additional codes are listed in Table 8 and can be chosen via the drop-down list.
   For energy source codes OTH, OBS, OBG, OBL, and OG, specify the fuel in the text box at the bottom
   of the data table.

3. Quantity Consumed: For each prime mover type, report the amount of fuel consumed for electric power
   generation and, at combined heat and power stations, for useful thermal output. Report the energy
   consumed for pumping water, compressing air, or other energy storage technologies in megawatthours.

4. Type of Physical Units: Report fuel consumption in the following units:
      a. Solids – Tons
      b. Liquids – Barrels (one barrel equals 42 U.S. gallons)
      c. Gases – Thousands of cubic feet (Mcf)
      d. Energy Storage – Megawatthours (MWh)

5. Average Heat Content: Report for all combustible fuels, the average heat content as burned to the
   nearest 0.001 million Btu (MMBtu) per physical unit. Report the value in the following units: solids in
   million Btu (MMBtu) per ton; liquids in MMBtu per barrel; and gases in MMBtu per thousand cubic feet
   (Mcf). Refer to Table 8 for approximate ranges of heat content of specific energy sources. Leave heat
   content blank if fuel consumed is zero and for pumped storage, compressed air or other energy storage
   technologies.
    Report the heat content of the fuel as the gross or “higher heating value” (rather than the net or lower
    heating value). The higher heating value exceeds the lower heating value by the latent heat of
    vaporization of the water. The heating value of fuels that is generally used and reported in a fuel
    analysis, unless otherwise specified, is the higher heating value.
                                               Page 13 of 41
                                             FORM EIA-923                                     OMB No. 1905-0129
                                       POWER PLANT OPERATIONS                           Approval Expires: 07/31/2029
                                                                                               Burden: 4.4 Hours
                                         REPORT INSTRUCTIONS



    If the fuel heat content cannot be reported “as burned,” obtain data from the fuel supplier on an “as
    received” basis.

6. Peaking Unit (Yes/No): Report “Yes” or “No” to indicate if a unit is operated as a peaking unit.
   Peaking units typically run only during hours of high demand (or peak demand) as opposed to base load
   units that run continuously except for maintenance or other outages.

7. Gross Generation: Report the total amount of electric energy produced by generating units for each
   technology (prime mover) type and measured at the generating terminal in megawatthours rounded to the
   nearest whole number

8. Generation: Report the total amount of net electric energy produced by generating units for each
    technology (prime mover) type. Net generation is gross generation minus the parasitic station load (i.e.,
    station use). If the monthly station service load exceeded the monthly gross electrical generation, report
    negative net generation with a minus sign (do not use parentheses).

    Combined heat and power plants in the Industrial or Commercial Sector, may leave net generation blank
    in cases where net generation cannot be determined. Please note that net generation is not defined as
    electric power sold to the grid (net of direct use), but as gross generation minus station use. If station use
    is not separable from direct use at combined heat and power plants, report only gross generation, and
    leave net generation blank.


            SCHEDULE 3. PART C. FUEL AND GENERATION INFORMATION FOR
                              COMBINED-CYCLE UNITS
Required Respondents: Plants with combined-cycle units must report the fuel consumed in each
combustion turbine and fuel consumed for supplementary firing of the heat recovery steam generator and the
electric power output of each generator. Report for single-shaft combustion turbines (CS) combined-cycle
combustion turbines (CT), heat recovery steam generators (HRSGs), and steam turbines (CA). Integrated
Gasification Combined-Cycle (IGCC) plants also are required to report fuel consumed by the gasifier.

Report a value for EACH MONTH. However, plants with less than 10 MW steam-electric nameplate capacity
may report annual values for the calendar year.

Do not leave fuel quantity and net /gross generation blank. Report zeros when no fuel is consumed or
electric power generated.

1. Prime Mover Code: For combustion turbines, the code is CT; for the steam turbine and the HRSG, use
   CA. For single shaft use CS. The prime mover codes are prepopulated. If the prepopulated code is
   incorrect, choose the correct code from the drop-down list. For a complete list of prime mover codes,
   refer to Table 7.

2. Boiler ID: Boiler IDs are prepopulated on the form. If a Boiler ID needs to be added choose the ID from
   the drop-down list. If the Boiler ID is not on the list, contact EIA to have it added. Boiler IDs must match
   those reported on the Form EIA-860.

3. Boiler Status: Enter one of the codes listed in Table 3 above.

4. Energy Source: Energy source codes used in the previous reporting period are prepopulated for the
   current reporting period. Additional codes are listed in Table 8 and can be chosen via the drop-down list.
   For energy source codes OTH, OBS, OBG, OBL and OG, specify the fuel in the text box at the bottom of




                                                Page 14 of 41
                                            FORM EIA-923                                   OMB No. 1905-0129
                                      POWER PLANT OPERATIONS                         Approval Expires: 07/31/2029
                                                                                            Burden: 4.4 Hours
                                        REPORT INSTRUCTIONS


    the data table. Non-supplementary fired steam turbines (CA) should report Waste Heat (WH) as the
    energy source.

5. Quantity Consumed: Report the quantity of fuel consumed in each combustion turbine (CT). Report
   supplementary fuel consumed for the steam turbine (duct firing). IGCC units should report the synthesis
   gas consumed. Non-supplementary fired steam turbines (CA) should leave the quantity blank. IGCC
   units should report the fuel consumed in the gasifier in the auxiliary table below.

6. Type of Physical Units: Fuel consumption must be reported in the following units:
      a. Solids – Tons
      b. Liquids – Barrels (one barrel equals 42 U.S. gallons)
      c. Gases – Thousands of cubic feet (Mcf)

7. Average Heat Content: Report the average heat content as burned to the nearest 0.001 million Btu
   (MMBtu) per physical unit. Report the value in the following units: solids in million Btu (MMBtu) per
   ton; liquids in MMBtu per barrel; and gases in MMBtu per thousand cubic feet (Mcf). Refer to Table 8
   for approximate ranges of heat content of specific energy sources. Leave heat content blank if fuel
   consumed is zero.

    Report the heat content of the fuel as the gross or “higher heating value” (rather than the net or lower
    heating value). The higher heating value exceeds the lower heating value by the latent heat of
    vaporization of the water. The heating value of fuels that is generally used and reported in a fuel
    analysis, unless otherwise specified, is the higher heating value.

    If the fuel heat content cannot be reported “as burned,” obtain data from the fuel supplier on an “as
    received” basis.

8. Generator ID: Generator IDs are prepopulated on the form. For a Generator ID that is not prepopulated,
   choose the ID from the drop-down selection list of Generator IDs that were reported for your plant on the
   Form EIA-860. If the generator ID is not on the selection list, contact EIA to have the ID added to your
   form. Generator IDs must match those reported on the Form EIA-860.

9. Generator Status: Enter one of the codes listed in Table 3 above.

10. Gross Generation: Report the total amount of electric energy produced by generating units and
    measured at the generating terminal. For each month, report the megawatthours (MWh) generated,
    rounded to whole numbers with no decimals.

11. Net Generation: Report the Net Generation (gross generation minus the parasitic station load, i.e. station
    use). If the monthly station service load exceeded the monthly gross electrical generation, report
    negative net generation with a minus sign (do not use parentheses). For each month, enter the net
    generation amount in MWh.

    Combined heat and power plants in the Industrial or Commercial sector may leave net generation blank in
    cases where net generation cannot be determined. Please note that net generation is not defined as
    electric power sold to the grid (net of direct use), but as gross generation minus station use. If station
    use is not separable from direct use at combined heat and power plants, report only gross generation and
    leave net generation blank.

12. IGCC Plants – Supplemental Fuel Data for Gasifier Unit: Report the fuel input to the gasifier unit (coal
    or petroleum coke) along with the average heat, sulfur, and ash contents. See Table 1 in Schedule 2
    instructions for approximate heat, sulfur, and ash contents. Report coal and petroleum coke in tons.




                                               Page 15 of 41
                                            FORM EIA-923                                   OMB No. 1905-0129
                                      POWER PLANT OPERATIONS                         Approval Expires: 07/31/2029
                                                                                            Burden: 4.4 Hours
                                        REPORT INSTRUCTIONS



       SCHEDULE 3. PART D. GENERATION FROM NUCLEAR, NONCOMBUSTIBLE,
                      AND RENEWABLE ENERGY SOURCES
1. Required Respondents: Nuclear plants and plants using renewable energy sources (wind, solar,
   geothermal, and water in conventional hydroelectric) or other plants where the energy source is solely
   purchased steam or waste heat. Fuel consumption data are not required for these types of plants. Report
   generation by energy source for nuclear, wind, solar, geothermal, conventional hydroelectric and
   miscellaneous sources such as purchased steam or waste heat. Report nuclear data by generating unit.
   For all other plant types, ignore the Unit Column. Annual respondents with plants that have one or more
   wind, solar, nuclear, conventional hydroelectric or geothermal energy sources report operational data
   for all prime movers and energy source types for each month. All other annual respondents report data
   for the calendar year (do not break down by month)

2. Prime Mover Code: Prime mover codes are prepopulated on the form. Use the codes HY, HA, HB,
   HK, BT, PV, ST, WT, WS and OT for Schedule 3D. I f the prepopulated code is incorrect, choose the
   correct prime mover code from the drop-down list. Prime mover codes are shown in Table 7.

3. Energy Source: Energy source codes are prepopulated on the form. Add codes from the drop-down list
   as needed. A list of all codes is available in Table 8. Valid entries for Schedule 3D are NUC, WAT,
   WND, GEO, PUR, WH, SUN or OTH.

4. Unit Code: The nuclear unit code is prepopulated for e-file system forms. Contact EIA if the Unit Code is
   incorrect. Ignore this field for all other types of plants.

5. Gross Generation: Enter the total amount of electric energy produced by generating units and
   measured at the generating terminal. For each month, report the Gross Generation amount in
   megawatthours (MWh).

6. Net Generation: Enter the Net Generation (gross generation minus the parasitic station load, i.e. station
   use). If the monthly station service load exceeded the monthly gross electrical generation, report negative
   net generation with a minus sign (do not use parentheses). For each month, report the Net Generation
   amount in MWh.

    Combined heat and power plants in the Industrial or Commercial Sector may leave net generation blank
    i n cases where net generation cannot be determined. Please note that net generation is not defined as
    electric power sold to the grid (net of direct use), but as gross generation minus station use. If station
    use is not separable from direct use at combined heat and power plants, report only gross generation and
    leave net generation blank.




                                               Page 16 of 41
                                             FORM EIA-923                                     OMB No. 1905-0129
                                       POWER PLANT OPERATIONS                           Approval Expires: 07/31/2029
                                                                                               Burden: 4.4 Hours
                                         REPORT INSTRUCTIONS




    SCHEDULE 4. PART A. FOSSIL FUEL STOCKS AT THE END OF THE REPORTING
  PERIOD FOR COAL, PETROLEUM COKE, DISTILLATE FUEL OIL, AND RESIDUAL FUEL
                                     OIL.

1. Required Respondents: Required Respondents: Plants with one or more generating units primarily
   fueled by coal (excluding waste coal), natural gas, petroleum coke, distillate fuel oil, residual fuel oil, or
   hydrogen must report if their total generator nameplate capacity with a primary fuel of coal is 50 or more
   MW, or if their total generator nameplate capacity with a primary fuel of any combination of natural gas,
   petroleum coke, distillate fuel oil, residual fuel oil, or hydrogen is 200 MW or greater, (The primary fuel for
   each generator is reported on the Form EIA-860.) Plants that meet this criteria are required to report
   their stocks at the end of each reporting period. If Schedule 2, Cost and Quality of Fuel Purchases, is not
   required, no adjustment to the stocks is required and the fuel balance is not applicable.

    Do not report stocks for waste coal, natural gas, biomass, or any petroleum product not mentioned
    above.

2. Fuel Terminals: Report stocks held at terminals that will be distributed to the power plants served and
   reported on this schedule. Report shipments out of the terminal as negative adjustments, using a
   negative sign and not parentheses. Provide the plants and quantity of fuels moved to each plant on
   Schedule 4. Part B.


3. Energy Source: Energy source codes are prepopulated. Energy source codes cannot be deleted from
   Schedule 4A. If stocks of a fuel type are no longer held at the plant, report a zero (do not leave blank)
   and contact EIA to remove the energy source code from Schedule 4A.




                                                Page 17 of 41
                                            FORM EIA-923                                     OMB No. 1905-0129
                                      POWER PLANT OPERATIONS                           Approval Expires: 07/31/2029
                                                                                              Burden: 4.4 Hours
                                        REPORT INSTRUCTIONS



        SCHEDULE 4. PART B. FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL
                         TERMINALS TO POWER PLANTS

    Required Respondents: Central fuel distribution terminals that serve to receive and distribute fuel to
    associated generating plants that cannot report individual fuel purchases at the plant level.

    Fuel Terminal–Plant Relationships and Fuel Shipments: Report the plants that received fuel during
    the reporting period and the quantity of the fuel transferred to each plant from the terminal. The Plant ID
    and Name will be prepopulated after the initial report is made.

    Report fuels in transit.

    Report coal and petroleum coke in tons; liquid petroleum in barrels and natural gas in Mcf.

                                                  SCHEDULE 5.

    No longer used. Form EIA-923 Schedules 5A to 5C have been combined with Schedules
    3A to 3D.

             SCHEDULE 6. NONUTILITY ANNUAL SOURCE AND DISPOSITION OF
                                     ELECTRICITY
    Required Respondents: Nonutility power plants defined as plants where costs are not recovered
    through rate-based regulation by a state regulatory body, municipal authority or a rural electric
    cooperative, but generally may market power in open wholesale markets, sell directly to consumers
    and/or power marketers/brokers, or consume self-generated power.

    Report annual calendar year data for the source and disposition of electricity.

    Report in megawatthours (MWh) rounded to a whole number.

                                              Source of Electricity

1. Gross Generation (Annual): Report the Total Gross Generation for the calendar year from all
   generators at the plant. Total Gross Generation should equal the sum of the gross generation reported on
   Schedules 3A, 3B, 3C, and 3D.

2. Other Incoming Electricity: Report all incoming electricity to the facility, whether from purchases, tolling
   agreements, transfers, exchanges, or other arrangements.

    List at the bottom of the schedule the descriptions of “Other Incoming Electricity” (e.g., purchased,
    exchanged).

3. Total Sources: The sum of the total gross electricity generated and the total incoming electricity is
   automatically calculated and displayed on the form. Ensure that Total Sources equal the Total
   Disposition (see below).




                                                Page 18 of 41
                                            FORM EIA-923                                    OMB No. 1905-0129
                                      POWER PLANT OPERATIONS                          Approval Expires: 07/31/2029
                                                                                             Burden: 4.4 Hours
                                        REPORT INSTRUCTIONS


                                            Disposition of Electricity

4. Station Use: Report the amount of electricity that is used to operate and maintain the electric power plant
   of the facility (e.g., parasitic loads from auxiliary equipment), regardless of whether the electricity is
   produced at the plant or comes from another source. Do not include electricity used for pumping at
   pumped storage hydroelectric plants. Do not include electricity used for other purposes at industrial and
   commercial facilities (direct use).

5. Direct Use (Industrial and Commercial Sector Plants, both CHP and non-CHP): Report the amount
   of electricity consumed onsite for all operations other than electric power plant station use (see above),
   such as electricity consumed by manufacturing processes, district heating and/or cooling, hospital
   services, and campus services. Electricity consumed for Direct Use can be generated by the plant or
   purchased from an external source.

    For plants for which Station Use and Direct Use cannot be separated, you may enter zero in Station Use,
    and the sum of Station Use and Direct Use in the Direct Use field. In such cases, provide a comment on
    Schedule 9.

6. Total Facility Use: The sum of station use and direct use is calculated on the form.

7. Retail Sales to Ultimate Customers: Report the amount of electricity sold directly to retail (end-use)
   customers (i.e., power that is not re-sold or distributed by another entity). Include unbilled electricity
   provided to affiliated and non-affiliated entities. Exclude power provided as part of a tolling agreement.
   Plants with retail sales are required to report Schedule 7B.

8. Sales for Resale: Report the amount of electricity sold for resale (wholesale sales). Plants with sales
   for resale must complete Schedule 7A.

9. Provided under Tolling Agreements: Report the amount of electricity provided under tolling
   agreements.

10. Other Outgoing Electricity: Report all other outgoing electricity from the facility, such as transfers and
    exchanges. Specify the nature of Other Outgoing Electricity on Schedule 9, Comments.

11. Total Disposition: The sum of station use, direct use, retail sales, sales for resale, and other outgoing
    electricity is automatically calculated on the form. Ensure that Total Disposition equals Total Sources
    (see above).


                     SCHEDULE 7A. ANNUAL REVENUE FROM SALES FOR RESALE

    Required Respondents:        Plants that report Sales for Resale on Schedule 6, Item 8, must report
    Schedule 7A.

    Report revenue from Sales for Resale in thousand dollars, to the nearest whole number. This revenue
    should not include revenue from capacity payments, renewable energy credits, or other ancillary revenue
    streams.




                                               Page 19 of 41
                                             FORM EIA-923                                     OMB No. 1905-0129
                                       POWER PLANT OPERATIONS                           Approval Expires: 07/31/2029
                                                                                               Burden: 4.4 Hours
                                         REPORT INSTRUCTIONS




         SCHEDULE 7B. ANNUAL RETAIL SALES, REVENUES, AND NUMBER OF CUSTOMERS

    Required Respondents:         Plants that report retail sales on Schedule 6, Item 7, must report Schedule 7B.

    Report by state and end-use customer sectors. Use Table 9 as a guide for the classification of your end-
    use customers, paying close attention to how your consumers should be organized into four sectors:
    Residential, Commercial, Industrial, and Transportation.
    Complete an individual Schedule 7, Part B, for each state where customers are located.


1. Retail Sales: Report retail sales in megawatthours, by state and end-use sector.
2. Revenue: Report revenue associated with retail sales, by state and end-use sector.

3. Number of customers: Report the number of customers served, by state and end-use sector.

    Note: Form EIA-861U previously collected the data now requested on Schedule 7B. Form EIA-861U is
    no longer required.


                     SCHEDULE 8. ANNUAL ENVIRONMENTAL INFORMATION
    Required Respondents: Report environmental information on Schedule 8 for steam-electric
    (thermoelectric) power plants, including nuclear and combined-cycle plants, with a total steam turbine
    capacity greater than or equal to 10 megawatts as follows:
         Plants with steam-electric capacity greater than or equal to 100 megawatts, report all parts of Schedule
          8 (Parts A through D).
         Plants with steam-electric capacity less than 100 megawatts but greater than or equal to 10 megawatts
          report only Schedule 8 Part C.


                   SCHEDULE 8. PART A. ANNUAL BY-PRODUCT DISPOSITION
    Required Respondents: Thermoelectric power plants with a total steam turbine capacity of 100
    megawatts or greater that produce combustion by-products.

    Report by-products in thousand tons rounded to whole numbers. If actual data are not available, provide
    estimated values. Report the disposition of all combustion by-products produced during the reporting
    year. For by-products stored, but later sold or otherwise disposed of within the reporting year, report
    under the final disposition. Report by-products produced in previous years that were stored and
    subsequently sold or otherwise disposed of and provide the quantity from storage in a footnote on
    Schedule 9, Comments. Corresponding entries for cost of collection and disposal must be entered on
    Schedule 8, Part B.

1. Combustion By-products: If no combustion by-products were produced in the reporting year, place a
   check in the checkbox labeled, “Select if no combustion by-products were produced.”

2. Disposal: Report the quantity of each type of by-product under the appropriate column (On-Site Landfill,
   On-Site Pond, or Disposal Off-Site).

3. Beneficial Use: Report by-products put to beneficial use on-site or sold. If a by-product was stored in a
   landfill and subsequently put to beneficial use or sold, report the end disposition of the by-product.

                                                 Page 20 of 41
                                            FORM EIA-923                                    OMB No. 1905-0129
                                      POWER PLANT OPERATIONS                          Approval Expires: 07/31/2029
                                                                                             Burden: 4.4 Hours
                                        REPORT INSTRUCTIONS



4. Storage: Report by-products stored on or off site for subsequent disposal or sale.

    Combustion By-product Descriptions:

    Fly ash from standard boiler/primary Particulate Collection Device (PCD) units: Report fly ash from
    units with no Flue Gas Desulfurization (FGD) system or with FGD systems located downstream of the
    PCD.

   Fly ash from units with dry FGD: Report fly ash from units with spray dryer or duct injection systems,
   where fly ash and FGD by-products are collected in the same PCD. Do not include fly ash from
   Fluidized Bed Combustion (FBC) units.

   Fly ash from FBC units: Report fly ash from Fluidized Bed Combustion (FBC) units.

   Bottom ash from standard boiler units: Report bottom ash from standard boiler units and boiler slag
   from slagging combustors. Do not include bottom (bed) ash from FBC units, or slag from coal
   gasification units.

    Bottom (bed) ash from FBC units: Report bottom (bed) ash from fluidized bed combustion (FBC) units.

    FGD gypsum: Report by-products that are greater than 75% gypsum (CaS04●2H20), by weight.

    Other FGD by-products: Report all FGD by-products not reported as “Fly ash from units with dry FGD
    units;” “Fly ash from FBC units;” “Bottom ash from standard boiler units;” “Bottom (bed) ash from FBC
    units;” and “FGD gypsum,” along with additives used to stabilize the FGD by-products.

   Ash from coal gasification (IGCC) units: Report slag or solids extracted from the bottom of the
   gasifier, as well as fly ash removed downstream of the gasifier.

    Other: Enter the amount of other by-products. Specify these “other” by-products on Schedule 9,
    Comments.

    Steam sales: Report steam sales in million Btu (MMBtu).


                         SCHEDULE 8. PART B. FINANCIAL INFORMATION
                           RELATED TO COMBUSTION BY-PRODUCTS
    Required Respondents: Thermoelectric power plants with a total steam turbine capacity of 100
    megawatts or greater that produced combustion by-products during the reporting year.

    If actual data are not available, provide an estimated value. Cost data must be entered for all entries on
    Schedule 8A. If no cost was incurred, report zero.

    Report all entries in thousand dollars, to the nearest whole number.

                         Operation and Maintenance (O&M) Expenditures during Year

   Report costs for both collection and disposal of the indicated by-products. If the collection and disposal
   costs cannot be separated, place the total cost under the “Collection” line item, and provide a comment
   on Schedule 9, indicating that the costs cannot be separated. Exclude depreciation expense and cost of
   electricity consumed. Include all contract and self-service pollution abatement operation and
   maintenance expenditures for each line item.




                                               Page 21 of 41
                                              FORM EIA-923                                     OMB No. 1905-0129
                                        POWER PLANT OPERATIONS                           Approval Expires: 07/31/2029
                                                                                                Burden: 4.4 Hours
                                          REPORT INSTRUCTIONS




1. Fly Ash (1) and Bottom Ash (2): Report all material and labor costs associated with the collection and
   disposal of the fly and bottom ash from all sources, including equipment operation and maintenance
   costs (such as particulate collectors, conveyors, hoppers, etc.).

2. Flue Gas Desulfurization (3): Report all material and labor costs associated with the collection and
   disposal of the sulfur by-product, including equipment O&M costs.

3. Water Pollution Abatement (4): Report all operation and maintenance costs for material and/or
   supplies and labor costs, including equipment operation and maintenance (pumps, pipes, settling ponds,
   monitoring equipment, etc.), chemicals, and contracted disposal costs.

4. Other Pollution Abatement (5): Report operation and maintenance expenditures that are not allocated
   to a particular expenditure (e.g., expenditures to operate an environmental protection office or lab).
   Include expenses for conducting environmental studies for expansion or reduction of operations.
   Exclude all expenses for health, safety, employee comfort (OSHA), environmental aesthetics, research
   and development, taxes, fines, permits, legal fees, Superfund taxes, and contributions. Define other
   pollution abatement(s) in a comment on Schedule 9.

         Capital Expenditures for New Structures and Equipment during Year, Excluding Land and
                                             Interest Expense

    Report all pollution abatement capital expenditures for new structures and/or equipment made during the
    reporting year, regardless of the date these structures and/or equipment became operational. Do not
    leave Columns 7, 8, 9, and 10 blank. Enter zero if the line item is not applicable or if an estimate is not
    available, and enter a comment in Schedule 9. Specify the nature of the expenditures for these items in a
    comment on Schedule 9.

5. Air Pollution Abatement (7): Report new structures and/or equipment purchased to reduce, monitor, or
   eliminate airborne pollutants, including particulate matter (dust, smoke, fly ash, dirt, etc.), sulfur dioxides,
   nitrogen oxides, carbon monoxide, hydrocarbons, odors, mercury, acid gases, and other pollutants.
   Examples of air pollution abatement structures/equipment include flue gas particulate collectors, FGD
   units, continuous emissions monitoring equipment (CEMs), and nitrogen oxide control devices. Specify
   new structures/equipment in a comment on Schedule 9.

6. Water Pollution Abatement (8): Report new structures and/or equipment purchased to reduce, monitor,
   or eliminate waterborne pollutants, including chlorine, phosphates, acids, bases, hydrocarbons, sewage,
   and other pollutants. Examples include structures/equipment used to treat thermal pollution; cooling,
   boiler, and cooling tower blowdown water; coal pile runoff; and fly ash waste water. Do not include
   expenditures for treatment of water prior to use at the plant. Specify new structures/equipment in a
   comment on Schedule 9.

7. Solid/Contained Waste (9): Report new structures/equipment purchased to collect and dispose of
   objectionable solids or contained liquids. Examples include purchases of storage facilities, trucks, etc.,
   to collect, store, and dispose of solid/contained waste. Include equipment used for handling
   solid/contained waste generated as a result of air and water pollution abatement. Specify new
   structures/equipment in a comment on Schedule 9.

8. Other Pollution Abatement (10): Report amortizable expenses and purchases of new structures and or
   equipment when such purchases are not allocated to a particular unit or item. Examples include charges
   for the purchases of facilities to control hazardous waste, radiation, and noise pollution. Exclude all
   equipment purchased for aesthetics purposes. Specify new structures/equipment in a comment on
   Schedule 9.



                                                 Page 22 of 41
                                            FORM EIA-923                                   OMB No. 1905-0129
                                      POWER PLANT OPERATIONS                         Approval Expires: 07/31/2029
                                                                                            Burden: 4.4 Hours
                                        REPORT INSTRUCTIONS




9. By-product Sales Revenue during Year: If there were no by-product sales revenues, report a zero
   value in Column 16 (“Total”). Report the revenue, if any, for each listed by-product. Specify the nature
   of “Other Pollution Abatement” revenue in a comment on Schedule 9. If the revenue for a by-product is
   less than $500, enter a zero and enter a comment on Schedule 9 with the actual dollar amount. Report
   revenue for gypsum on Schedule 8, Part B, Column 14, and note this activity in a comment on Schedule
   9. Report the total revenue for the sale of by-products in Column 16. If the revenue reported was for the
   sale of stockpiled by-products from previous years, enter a comment on Schedule 9.


              SCHEDULE 8. PART C. AIR EMISSIONS CONTROL INFORMATION
    Required Respondents: Thermoelectric or combined-cycle power plants with a total steam turbine capacity
    greater than or equal to 10 megawatts.
                                               General Instructions
    Report the actual rate and removal efficiency for air emissions controlled by each equipment type or control
    strategy identified by unique IDs. The IDs must be consistent with those reported on the Form EIA-860,
    Schedule 6A. Where applicable, base data on Continuous Emissions Monitoring System (CEMS) data.
    Report emission removal efficiencies to the nearest 0.1 percent by weight. Report emission rates as pounds
    per million Btu of fuel burn to the nearest 0.01 lb/MMBtu.
1. Emissions Control Equipment or Technology Type: Report the code for the type of equipment or strategy
   for the control of air emissions. The codes are prepopulated on the form. If a correction is needed, please
   contact EIA referencing what needs to be added or updated from Table 6.
2. Emission Control IDs: Equipment ID is prepopulated from the previous year. If the information is not
   prepopulated or is incorrect, please contact EIA. IDs must be consistent with those reported on Schedule 6
   of the Form EIA-860.

3. Equipment Status: Select from the equipment status codes in Table 4. Equipment status for each
   equipment type is prepopulated for e-file users.

                                            Table 4. Equipment Status Codes

                     Code                                        Status
                      OP       Operating (in commercial service or out of service within 365 days)
                      OS        Out of service (365 days or longer)
                      RE       Retired (no longer in service and not expected to be returned to service)
                      SB       Standby (Reserve)
                      OA       Temporarily out of service (less than 365 days)

4. Hours in Service: Enter the total hours the control was in service during the reporting year (to the
   nearest hour).

5. NOx Emission Rate (Entire Year): For each equipment or strategy type and unique ID, enter the actual
   controlled (or uncontrolled) nitrogen oxides emission rate, in pounds per million Btu, based on data from
   CEMS, where possible. Where CEMS data are not available, report the nitrogen oxides emission rate,
   based on the method used to report emissions data to environmental authorities.



                                               Page 23 of 41
                                            FORM EIA-923                                    OMB No. 1905-0129
                                      POWER PLANT OPERATIONS                          Approval Expires: 07/31/2029
                                                                                             Burden: 4.4 Hours
                                        REPORT INSTRUCTIONS




6. NOx Emission Rate (May to September): For each equipment or strategy type and unique ID, enter the
   actual controlled (or uncontrolled) nitrogen oxides emission rate during the ozone season (May to
   September), in pounds per million Btu, based on data from CEMS, where possible. Where CEMS data
   are not available, report nitrogen oxides rates, based on the method used to report emissions data to
   environmental authorities.

7. Particulate Matter Emissions Removal Rate: For each equipment or strategy type and unique ID,
   enter the average annual emission removal rate for particulate matter.

8. Particulate Matter Removal Efficiency at Annual Operation Factor: For each equipment or strategy
   type and unique ID, enter removal efficiency, based on the annual operating factor. If actual data are
   unavailable, provide estimates, based on equipment design performance specifications.

    Annual operating factor, as given by the formula below, is defined as annual fuel consumption (MMBtu)
    divided by the product of the boiler design firing rate (MMBtu per hour) and hours of operation per year.




9. Particulate Matter Tested Removal Efficiency Rate (at 100% Load): For each equipment or strategy type
   and unique ID, enter the tested efficiency for the removal of particulate matter. If not tested at 100% load,
   provide the load at which the test was conducted in a comment on Schedule 9. If no test was conducted,
   leave the test date and the tested efficiency field blank.

10. Particulate Matter Removal Efficiency Rate Test Date: Enter the date of the latest efficiency test for
    the removal of particulate matter. If no test was conducted, leave the test date and the tested efficiency
    field blank.

11. Sulfur Dioxide Emissions Removal Efficiency at AOF: For each equipment or strategy type and
    unique ID, enter removal efficiency for sulfur dioxide, based on the annual operating factor (see above
    for AOF description). If actual data are unavailable, provide estimates, based on equipment design
    performance specifications.

12. Sulfur Dioxide Tested Removal Efficiency Rate (at 100% Load): For each equipment or strategy type
    and unique ID, enter the tested efficiency for the removal of sulfur dioxide. If not tested at 100% load,
    provide the load at which the test was conducted in a comment on Schedule 9. If no test was conducted,
    leave the test date and the tested efficiency field blank.

13. Sulfur Dioxide Removal Efficiency Rate Test Date: Enter the date of the latest efficiency test for the
    removal of sulfur dioxide. If no test was conducted, leave the test date and the tested efficiency field
    blank.

14. Quantity of Flue Gas Desulfurization Sorbent Used: Enter the quantity of FGD sorbent used by the
    unit during the reporting period (to the nearest 0.1 thousand tons).

15. Electrical Energy Consumption: Enter the Electrical Energy Consumed by the FGD unit during the
    reporting period (in megawatthours).

16. Mercury Removal Efficiency and Mercury Emissions Rate: Enter either the removal efficiency for mercury
    emissions to the nearest 0.1% by weight or if not available, enter the rate of mercury emissions in pounds per
                                               Page 24 of 41
                                           FORM EIA-923                              OMB No. 1905-0129 Approval
                                     POWER PLANT OPERATIONS                                  Expires: 07/31/2029
                                                                                              Burden: 4.4 Hours
                                       REPORT INSTRUCTIONS



   trillion Btu. If both the mercury removal efficiency and mercury emissions rate are readily available, the option
   to provide both is allowed.

   Specifically for the mercury emissions rate, for each equipment or strategy type and unique ID, enter the actual
   controlled (or uncontrolled) mercury emission rate, in pounds per trillion Btu (lbs/TBtu), based on data from
   CEMS, where possible. Where CEMS data are not available, report the mercury emission rate, based on the
   method used to report emissions data to environmental authorities

17. Acid Gases Removal Efficiency: Enter the removal efficiency for acid gas emissions, such as HCl.

          FGD Operation and Maintenance Expenditures during the Year (Excluding Electricity)

   Report the O&M Expenditures for the Flue Gas Desulfurization Units, excluding electricity, in thousand
   dollars for each category. Please report costs in nominal dollars and do not convert into real dollars,
   even if materials were purchased many years ago at reduced prices.


   1. Unit ID: Unit ID must be consistent with the ID provided for the equipment in the above section. If
      not prepopulated, contact EIA.
   2. Feed Materials and Chemicals: The delivered costs of all sorbents and chemicals used in the FGD unit to
      remove SO2 from the flue gases, including any costs of processing the sorbents after receipt.
   3. Labor and Supervision: All labor and supervision costs required to run the FGD throughout the year.
   4. Waste Disposal: All costs associated with disposing of waste materials from the FGD unit throughout the
      year.
   5. Maintenance Materials and All Other Costs: All costs associated with the acquisition of other
      maintenance materials and any other costs not associated with any other cost category.
   6. Total: The total of all of the above costs.




                                              Page 25 of 41
                                              FORM EIA-923                                     OMB No. 1905-0129
                                        POWER PLANT OPERATIONS                           Approval Expires: 07/31/2029
                                                                                                Burden: 4.4 Hours
                                          REPORT INSTRUCTIONS




              SCHEDULE 8. PART D. MONTHLY COOLING SYSTEM OPERATIONS
1. Required Respondents: Thermoelectric power plants (organically fueled, nuclear, and combined-cycle)
   with a total steam capacity of 100 megawatts or greater.

     Report data for each respective reporting month in the reporting year.

     Complete a separate row for each cooling system, unless inseparable, then choose PLANT for the
     cooling system ID.

     If actual data are not available, provide estimated values.

     If the source of cooling water is a well or municipal water system, do not complete the Cooling W ater
     Temperature sections.

     An illustrated appendix is included at the end of the specific instructions for guidance in reporting the
     water use data. Please take note of the required data for the specific type of cooling system.

2. Cooling System ID: Report the Cooling System ID. IDs must be consistent with those reported on
   Form EIA-860. The Cooling System ID is prepopulated for e-file users. If this ID is not prepopulated,
   choose the ID from the drop-down selection list. If the Cooling System ID is not on the selection list,
   contact EIA to have new IDs added. If the data to be reported are for the entire plant (because the data
   cannot be broken down by separate cooling systems), choose “PLANT” from the drop-down list.

3. Cooling System Type: Use codes from the drop-down list to provide the type of cooling system. See
   Table 10 for cooling system type descriptions and codes.

4.   Cooling System Status (C): Select from the equipment status codes in Table 5.




                                                 Page 26 of 41
                                            FORM EIA-923                                    OMB No. 1905-0129
                                      POWER PLANT OPERATIONS                          Approval Expires: 07/31/2029
                                                                                             Burden: 4.4 Hours
                                        REPORT INSTRUCTIONS



                                        Table 5. Cooling System Status Codes


                   Code                             System Status

                            Operating (in commercial service or out of service less
                    OP
                            than 365 days)
                    OS      Out of service (365 days or longer)
                            Retired (no longer in service and not expected to be
                    RE
                            returned to service)
                            Standby (or inactive reserve); i.e., not normally
                    SB
                            used, but available for service)


5. Hours in Service per Month (D): Enter the hours the condenser intake pumps operated for the cooling
   system for each month. Intake is the withdrawal through the condenser (not diversion). For recirculating
   towers, enter the tower make-up water pump hours. For dry cooling systems, report the hours that the towers
   operated.

6. Amount of Chlorine Added to Cooling Water (E): Report the amount of elemental chlorine to the
   nearest 0.001 thousand pounds. If a compound is used, determine the weight of elemental chlorine in
   the compound.

                                      Average Flow Rate of Cooling Water

    Report the rate of flow to nearest gallons per minute (GPM) for water flow for each of the four categories:
    Diversion, Withdrawal, Consumption and Withdrawal, paying close attention to the definition of each
    category.

    Please note that water flow rate data in previous years were reported in cubic feet per second (CFS). To
    convert CFS to GPM use the following conversion: 1 CFS = 448.8 GPM

7. Diversion: The flow for water that is moved from a natural water body without immediate beneficial use
   for purposes such as filling a cooling pond, or adding water to a reservoir from which thermoelectric
   power water withdrawals can occur.

8. Withdrawal: The water that is removed from a water body (including cooling ponds) for cooling i.e.
   water that is used through the condenser. For cooling towers this will be the makeup water.

9. Discharge: The water that is returned to a natural water body or multi-use reservoir (not a cooling
   pond). Cooling tower blowdown that is diverted to treatment or evaporation ponds is not considered
   Discharge. Water that is returned to a water body from evaporative or blowdown treatment ponds is
   discharge. The water body may be a different water body from which the water was withdrawn. For zero
   discharge systems (recirculating systems), report zero in the discharge field. Do not report the water
   discharged back into the cooling pond for recirculation.

10. Consumption: Water consumed through evaporative losses in cooling towers or cooling ponds. See
    the appendix illustrations for definitions specific to cooling system type.




                                               Page 27 of 41
                                           FORM EIA-923                                      OMB No. 1905-0129
                                     POWER PLANT OPERATIONS                            Approval Expires: 07/31/2029
                                                                                              Burden: 4.4 Hours
                                       REPORT INSTRUCTIONS




11. Method of Measurement: If all data reported under the Average Monthly Rate of Cooling Water
    section have been measured, choose one of the choices for “Measured” from the drop-down
    selection list. If one or more entries have been estimated in a particular section, choose one of the
    estimation methodologies given in the drop-down selection list for that section. If “Other” is chosen,
    provide details of the estimation method on Schedule 9. The choices in the drop-down selection list are
    the following:

         Measured using a streamflow gage or weir
         Measured using a cumulative or continuous flowmeter
         Measured using an instantaneous flowmeter and pump running time
         Estimated based on stated pump capacity and pump running time
         Estimated based on another flow, such as discharge estimated from measured withdrawals
         Consumption calculated as the difference between withdrawal and discharge flows
         Consumption estimated from withdrawal amount and a loss coefficient
         Estimated based on power generation
         Estimated based on plant design characteristics
         Permitted value, not measured
         Other (describe in footnote)

12. Cooling Water Temperatures: Report temperatures in degrees Fahrenheit to the nearest whole
    number. Do not report temperature data if water source is wells, municipal systems, or waste water from
    treatment plants. See appendix for the points where temperature should be measured.

13. Average Temperature at Intake: Report the average monthly cooling water temperature measured at
    the withdrawal point from the natural body of water, or from the cooling pond where the water was
    initially diverted.

14. Maximum Temperature at Intake: Report the maximum cooling water temperature for the month
    measured at the withdrawal point from the natural body of water, or from the cooling pond where the
    water was initially diverted.

15. Average Temperature at Discharge: Report the average monthly discharged cooling water
    temperature measured at the discharge point into the natural body of water.

16. Maximum Temperature at Discharge: Report the maximum discharged cooling water temperature
    during the month, in degrees Fahrenheit, to the nearest whole number, measured at the discharge point
    into the natural body of water.

17. Method of Measurement: If all data reported under the Cooling Water Temperature section have been
    measured, choose one of the choices for “Measured” from the drop-down selection list. If one or more
    entries have been estimated in a particular section, choose one of the estimation methodologies given in the
    drop-down selection list for that section. If “Other” is chosen, provide details of the estimation method on
    Schedule 9. The choices that will be included in the drop-down selection list are the following:
                      Measured continuously with a thermometer
                      Measured at intervals (for example, daily) with a thermometer
                      Discharge temperature calculated based on intake temperature
                      Intake temperature calculated based on discharge temperature
                      Estimated based on plant design characteristics
                      Permitted value, not measured
                      Other (describe in footnote)

                                              Page 28 of 41
                                        FORM EIA-923                                    OMB No. 1905-0129
                                  POWER PLANT OPERATIONS                          Approval Expires: 07/31/2029
                                                                                         Burden: 4.4 Hours
                                    REPORT INSTRUCTIONS




                     Volume of Cooling Water (million gallons per month)

Report the actual volume of water diverted, withdrawn, consumed and discharged for each cooling
system ID, or for the plant, to nearest 0.001 million gallons per month. See descriptions for Diversion,
Withdrawal, Consumption, and Discharge above.




                                    SCHEDULE 9. COMMENTS

This schedule provides space for comments. Identify the schedule, item, and identifying information
(e.g., plant code, boiler ID, generator ID, prime mover) for each comment. If a plant is sold, provide the
purchaser’s name, a telephone number (if available), and the date of the sale.
Report planned retirements of generating units within the next twelve months. Include generator ID and
month/year of expected retirement for each retiring unit.




                                           Page 29 of 41
                        FORM EIA-923                                    OMB No. 1905-0129
                  POWER PLANT OPERATIONS                          Approval Expires: 07/31/2029
                                                                         Burden: 4.4 Hours
                    REPORT INSTRUCTIONS



                  Table 6: Technology Type Codes
                                                                             Unit
Code                              Description                                Type
JB     Jet Bubbling Reactor (Wet)                                            FGD
MA     Mechanically Aided Type (Wet)                                         FGD
PA     Packed Type (Wet)                                                     FGD
SP     Spray Type (Wet)                                                      FGD
TR     Tray Type (Wet)                                                       FGD
VE     Venturi Type (Wet)                                                    FGD
DSI    Dry Sorbent (Powder) Injection Type                                   FGD
ACI    Activated Carbon Injection System                                     FGD
CD     Circulating Dry Scrubber (Dry)                                        FGD
SD     Spray Dryer Type (Dry)                                                FGD
SN     Selective Noncatalytic Reduction                                      NOX
SR     Selective Catalytic Reduction                                         NOX
BS     Baghouse, shake and deflate                                           FGP
BP     Baghouse, pulse                                                       FGP
BR     Baghouse, reverse air                                                 FGP
EC     Electrostatic Precipitator, cold side with Flue Gas Conditioning      FGP
EH     Electrostatic Precipitator, hot side with Flue Gas Conditioning       FGP
       Electrostatic Precipitator, cold side without Flue Gas
EK     Conditioning                                                          FGP
       Electrostatic Precipitator, hot side without Flue Gas
EW     Conditioning                                                          FGP
MC     Multiple Cyclone                                                      FGP
SC     Single Cyclone                                                        FGP
AA     Advanced Overfire Air                                                 NOX
BF     Biased Firing (alternative burners)                                   NOX
CF     Fluidized Bed Combuster                                               NOX
FR     Flue Gas Recirculation                                                NOX
FU     Fuel Reburning                                                        NOX
H2O    Water Injection                                                       NOX
LA     Low Excess Air                                                        NOX
LN     Low NOx Burner                                                        NOX
NH3    Ammonia Injection                                                     NOX
OV     Overfire Air                                                          NOX
STM    Steam Injection                                                       NOX
SC     Slagging                                                              NOX
OT     Other (specify in Schedule 9)                                         NOX




                            Page 30 of 41
                         FORM EIA-923                                  OMB No. 1905-0129
                   POWER PLANT OPERATIONS                        Approval Expires: 07/31/2029
                                                                        Burden: 4.4 Hours
                     REPORT INSTRUCTIONS



                    Table 7: Prime Mover Codes

Prime Mover Code                          Prime Mover Description

      BA           Energy Storage, Battery

                   Turbines Used in a Binary Cycle (including those used for geothermal
      BT
                   applications)

      CA           Combined-Cycle – Steam Part

      CE           Energy Storage, Compressed Air

      CP           Energy Storage, Concentrated Solar Power

                   Combined-Cycle Single-Shaft Combustion turbine and steam turbine
      CS
                   share a single generator

      CT           Combined-Cycle Combustion Turbine Part

      ES           Energy Storage, Other (Specify on Schedule 9, Comments)

      FC           Fuel Cell

      FW           Energy Storage, Flywheel

      GT           Combustion (Gas) Turbine (including jet engine design)

      HA           Hydrokinetic, Axial Flow Turbine

      HB           Hydrokinetic, Wave Buoy

      HK           Hydrokinetic, Other

                   Hydraulic Turbine (including turbines associated with delivery of water
      HY
                   by pipeline)

      IC           Internal Combustion (diesel, piston, reciprocating) Engine

      PS           Energy Storage, Reversible Hydraulic Turbine (Pumped Storage)

      OT           Other – Specify on SCHEDULE 9.
                   Steam Turbine (including nuclear, geothermal and solar steam; does
      ST           not include combined-cycle turbine)
      PV           Photovoltaic

      WT           Wind Turbine, Onshore

      WS           Wind Turbine, Offshore




                          Page 31 of 41
                                       FORM EIA-923                                      OMB No. 1905-0129
                                 POWER PLANT OPERATIONS                            Approval Expires: 07/31/2029
                                                                                          Burden: 4.4 Hours
                                   REPORT INSTRUCTIONS



                          Table 8: Energy Sources and Heating Value Ranges

                                               Heat Content per
                        Energy                   Unit Range
                        Source     Unit
                        Code      Label                                        Energy Source Description
                                              MMBtu         MMBtu
                                              Lower         Upper
                                             Fossil Fuels
                         ANT       tons        22           29      Anthracite Coal
                         BIT       tons        19           29      Bituminous Coal
                         LIG       tons        10           15      Lignite Coal
                         SUB       tons        15           20      Subbituminous Coal

        Coal                                                        Waste/Other Coal (including anthracite culm,
                         WC        tons        6.5          16      bituminous gob, fine coal, lignite waste,
                                                                    waste coal)

                                                                    Refined Coal (A coal product that is created
                                                                    when impurities and/or moisture are
                                                                    removed to improve heat content and reduce
                                                                    emissions. Includes any coal which meets
                         RC        tons        20           29
                                                                    the IRS definition of refined coal [Notice
                                                                    2010-54 or any superseding IRS notices].
                                                                    Does not include coal processed by coal
                                                                    preparation plants.)

                         SGC       Mcf         0.2          0.3     Coal-Derived Synthesis Gas


                                                                    Distillate Fuel Oil (including diesel, No. 1, No.
                         DFO       barrels     5.3          6.3
                                                                    2, and No. 4 fuel oils)
                         JF        barrels     5            6       Jet Fuel
                         KER       barrels     5.6          6.1     Kerosene
 Petroleum Products
                         PC        tons        24           30      Petroleum Coke
                                                                    Residual Fuel Oil (including No. 5 and No. 6
                         RFO       barrels     5.7          6.9
                                                                    fuel oils, and bunker C fuel oil)
                         PG        Mcf         2.5          2.75    Propane, gaseous
                         SGP       Mcf         0.2          1.1     Petroleum Coke Derived Synthesis Gas

                                                                    Waste/Other Oil (including crude oil, liquid
                                                                    butane, liquid propane, naphtha, oil waste,
                         WO        barrels     3            5.8
                                                                    re-refined motor oil, sludge oil, tar oil, or
                                                                    other petroleum-based liquid wastes)


                         BFG       Mcf         0.07         0.12    Blast Furnace Gas

Natural Gas and Other    NG        Mcf         0.8          1.2     Natural Gas
        Gases

                         OG        Mcf         0.32         3.3     Other Gas (Specify the fuel in the text box in
                                                                    the applicable schedule.)



                                          Page 32 of 41
                                       FORM EIA-923                                  OMB No. 1905-0129
                                 POWER PLANT OPERATIONS                        Approval Expires: 07/31/2029
                                                                                      Burden: 4.4 Hours
                                   REPORT INSTRUCTIONS




                           AB      tons        7          18    Agricultural By-products
                           MSW     tons        9          12    Municipal Solid Waste
                                                                Other Biomass Solids (Specify the fuel in the
                           OBS     tons        8          25
                                                                text box in the applicable schedule.)
                                                                Wood/Wood Waste Solids (including paper
                           WDS     tons        7          18    pellets, railroad ties, utility poles, wood chips,
                                                                bark, and wood waste solids)
                                                                Other Biomass Liquids (Specify the fuel in
                           OBL     barrels     3.5        4
                                                                the text box in the applicable schedule.)
                           SLW     tons        10         16    Sludge Waste
                           BLQ     tons        10         14    Black Liquor
Renewable Energy Sources
                                                                Wood Waste Liquids excluding Black Liquor
                           WDL     barrels     8          14    (includes red liquor, sludge wood, spent
                                                                sulfite liquor, and other wood-based liquids)

                           LFG     Mcf         0.3        0.6   Landfill Gas

                                                                Other Biomass Gas (includes digester gas,
                                                                methane, and other biomass gasses)
                           OBG     Mcf         0.36       1.6
                                                                (Specify the fuel in the text box in the
                                                                applicable schedule.)
                           SUN     N/A         0          0     Solar
                           WND     N/A         0          0     Wind
                           GEO     N/A         0          0     Geothermal

                                                                Water at a Conventional Hydroelectric
                                                                Turbine, and water used in Wave Buoy
                           WAT     N/A         0          0     Hydrokinetic Technology, Current
                                                                Hydrokinetic Technology, and Tidal
                                                                Hydrokinetic Technology.


                                                                Pumping Energy for Reversible (Pumped
                           WAT     MWh         0          0
                                                                Storage) Hydroelectric Turbine
                                                                Energy storage technologies, such as
                           MWH     MWh         0          0
                                                                compressed air, batteries, and fly wheels
                           NUC     N/A         0          0     Nuclear Uranium, Plutonium, Thorium
  Other Energy Sources
                           PUR     N/A         0          0     Purchased Steam

                                                                Waste heat not directly attributed to a fuel
                                                                source (WH should only be reported where
                                                                the fuel source for the waste heat is
                           WH      N/A         0          0
                                                                undetermined, and for combined-cycle steam
                                                                turbines that do not have supplemental
                                                                firing.)

                           TDF     tons        16         32    Tire-derived Fuels
                                                                (Specify the fuel in the text box in the
                           OTH     N/A         0          0
                                                                applicable schedule.)




                                          Page 33 of 41
                                         FORM EIA-923                                   OMB No. 1905-0129
                                   POWER PLANT OPERATIONS                         Approval Expires: 07/31/2029
                                                                                         Burden: 4.4 Hours
                                     REPORT INSTRUCTIONS



                                Table 9: Classification of End-Use Customers




The residential sector includes private               The commercial sector includes non-
households and apartment buildings where              manufacturing* business establishments, e.g.:
energy is consumed primarily for:
                                                               hotels
      space heating                                           motels
      water heating                                           restaurants
      air conditioning                                        wholesale businesses
      lighting                                                retail stores
      refrigeration                                           health, social, and educational
      cooking                                                  institutions
      clothes drying                                          public street and highway lighting
                                                               municipalities
                                                               divisions or agencies of State and
                                                                Federal Governments under special
                                                                contracts or agreements, and other utility
                                                                departments, as defined by the pertinent
                                                                regulatory agency and/or electric utility

                                                      *Sometimes the commercial sector includes
                                                      small manufacturing facilities as well.


The industrial sector includes:                       The transportation sector includes:


      manufacturing                                           railroads and railways (the fuel source of
      construction                                             propulsion must be like a metro system
      mining                                                   which only exists in large cities costing
      agriculture (irrigation, grain drying)                   millions of dollars). Should be counted
      fishing                                                  as 1 customer per transportation system.
      forestry establishments




                                            Page 34 of 41
                                    FORM EIA-923                                     OMB No. 1905-0129
                              POWER PLANT OPERATIONS                           Approval Expires: 07/31/2029
                                                                                      Burden: 4.4 Hours
                                REPORT INSTRUCTIONS




                                                 Table 10.
                                          Cooling System Types

  Cooling
System Type                                          Description
   Code

    DC        Dry (air) cooling System

   HRC        Hybrid: recirculating cooling pond(s) or canal(s) with dry cooling

   HRF        Hybrid: recirculating with forced draft cooling tower(s) with dry cooling

   HRI        Hybrid: recirculating with induced draft cooling tower(s) with dry cooling

    HT        Helper Tower

    OC        Once through with Cooling Ponds

    ON        Once through without cooling pond(s) or canal(s)

    OT        Other - Specify in Footnote

    RC        Recirculating with Cooling Ponds

    RF        Recirculating with Forced Draft Cooling Tower

    RI        Recirculating with Induced Draft Cooling Tower

    RN        Recirculating with Natural Draft Cooling Tower




                                         Page 35 of 41
                                                FORM EIA-923                                   OMB No. 1905-0129
                                          POWER PLANT OPERATIONS                         Approval Expires: 07/31/2029
                                                                                                Burden: 4.4 Hours
                                            REPORT INSTRUCTIONS



                            Instructions for Reporting Water Use Data
                                            Appendix for Schedule 8D




Withdrawal: Report the water that is removed from a water body for cooling, i.e. water used through the condenser.

Discharge: Report the flow of water that is returned to the water body.

Diversion: Diversion is not expected with once-through systems.

Consumption: Evaporative losses are not expected with once-through systems as withdrawal should equal discharge.




Withdrawal: Report the water that is removed from a water body for cooling, i.e. water used through the condenser.

Discharge: Report the flow of water that is ultimately returned to a water body, not the pond or canal.

Diversion: Diversion is not expected with once-through systems.

Consumption: Evaporative losses are not expected with once-through systems as withdrawal should equal discharge.




                                                   Page 36 of 41
                                                FORM EIA-923                                   OMB No. 1905-0129
                                          POWER PLANT OPERATIONS                         Approval Expires: 07/31/2029
                                                                                                Burden: 4.4 Hours
                                            REPORT INSTRUCTIONS




Withdrawal: Report the water that is removed from a water body for cooling, i.e. water used through the condenser.

Discharge: Report the water that is returned to a water body. Do not report water flows from the condenser to
the helper tower(s).

Diversion: Diversion is not expected with once-through systems.

Consumption: Evaporative losses can occur within the helper tower(s). Consumption is the difference between
withdrawal and discharge.




Withdrawal: Report the water that is removed from a water body for cooling, i.e. water used through the condenser.

Discharge: Report the water that is returned to a water body. Regardless of the tower(s) orientation report the
water flows to the water body. Do not report water flows from the condenser to the helper tower(s).

Diversion: Diversion is not expected with once-through systems.

Consumption: Evaporative losses can occur within the helper tower(s). Consumption is the difference between
withdrawal and discharge.




                                                   Page 37 of 41
                                               FORM EIA-923                                   OMB No. 1905-0129
                                         POWER PLANT OPERATIONS                         Approval Expires: 07/31/2029
                                                                                               Burden: 4.4 Hours
                                           REPORT INSTRUCTIONS




Withdrawal: Report the water flow to the condenser from the cooling pond.

Discharge: Report the water that is returned to a water body (not a cooling pond). Do not report the water
discharged back into the cooling pond for recirculation.

Diversion: Report the water that is moved from a watercourse without immediate beneficial use for purposes such
as filling a cooling pond, or adding water to a lake from which thermoelectric power water withdrawals can occur.

Consumption: Report evaporative losses that occur within the cooling pond. Consumption is the difference
between diversion and discharge. Water from other sources than natural water bodies, including wells, water
utilities, and waste water treatment plants, is not Diversion.




Withdrawal: Report the cooling tower makeup water that is removed from a water body.

Discharge: Report the water that is returned to a water body. Cooling tower blowdown that is diverted to
treatment or evaporation ponds is not considered Discharge. Water that is returned to a water body from
evaporative or blowdown treatment ponds is considered Discharge. For zero discharge systems report zero
in the discharge field.

Diversion: Not expected with recirculating tower systems.

Consumption: Report evaporative losses from cooling tower(s). Consumption is the difference between
withdrawal and discharge.



                                                  Page 38 of 41
                                                FORM EIA-923                                   OMB No. 1905-0129
                                          POWER PLANT OPERATIONS                         Approval Expires: 07/31/2029
                                                                                                Burden: 4.4 Hours
                                            REPORT INSTRUCTIONS




Withdrawal: Report the water flow to the condenser.

Discharge: Report the water that is returned to a water body (not a cooling pond). Do not report the water
discharged back into the cooling pond for recirculation. Cooling tower blowdown that is diverted to treatment or
evaporation ponds is not considered Discharge. Water that is returned to a water body from evaporative or
blowdown treatment ponds is considered Discharge. For zero discharge systems, report zero in the discharge
field.

Diversion: Report the water that is moved from a watercourse without immediate beneficial use for purposes
such as filling a cooling pond, or adding water to a lake from which thermoelectric power water withdrawals can
occur.

Consumption: Report evaporative losses from cooling pond and tower(s). Consumption is the difference between
diversion and discharge.




Withdrawal: Report the cooling tower makeup water that is removed from a water body.

Discharge: Report the water that is returned to a water body. Cooling tower blowdown that is diverted to
treatment or evaporation ponds is not considered Discharge. Water that is returned to a water body from
evaporative or blowdown treatment ponds is considered Discharge. For zero discharge systems, report zero
in the discharge field.

Diversion: Not expected with hybrid recirculating tower systems.

Consumption: Report evaporative losses from cooling tower(s). Consumption is the difference between
withdrawal and discharge.


                                                   Page 39 of 41
                                                  FORM EIA-923                                       OMB No. 1905-0129
                                            POWER PLANT OPERATIONS                             Approval Expires: 07/31/2029
                                              REPORT INSTRUCTIONS                                        Burden: 4.4 hours




GLOSSARY     The glossary for this form is available online at the following URL: http://www.eia.gov/glossary/index.html

             The timely submission of Form EIA-923 by those required to report is mandatory under 15 U.S.C. §772(b),
             as amended. Failure to respond may result in a civil penalty of not more than $13,273 each day for each
             violation. The government may bring a civil action to prohibit reporting violations which may result in a
             temporary restraining order or a preliminary or permanent injunction without bond. In such civil action, the
             court may also issue mandatory injunctions commanding any person to comply with these reporting
SANCTIONS
             requirements.




             Public reporting burden for this collection of information is estimated to average 2.0 hours per
             response for monthly respondents, 3.4 hours per response for annual respondents, and 4.4 hours
             per response for annual respondents with boiler level data. Burden hours include the time for
             reviewing instructions, searching existing data sources, gathering and maintaining the data needed,
             and completing and reviewing the collection of information. Send comments regarding this burden
REPORTING
             estimate or any other aspect of this collection of information, including suggestions for reducing this
             burden, to the U.S. Energy Information Administration, Office of Statistical Methods and Research,
BURDEN       EI-21 Forrestal Building, 1000 Independence Avenue SW, Washington, D.C. 20585-0670; and to the
             Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, D.C.
             20503. A person is not required to respond to the collection of information unless the form displays a
             valid OMB number.

             The following information reported on this survey will be protected and not disclosed to the public to
             the extent that it satisfies the criteria for exemption under the Freedom of Information Act (FOIA), 5
             U.S.C. §552, the Department of Energy (DOE) regulations, 10 C.F.R. §1004.11, implementing the
             FOIA, and the Trade Secrets Act, 18 U.S.C. §1905:
                      All information associated with the “Survey Contact” and the “Supervisor” of “Contact Person
                       for Survey” on SCHEDULE 1.
                      The “Total Delivered Cost” of coal, natural gas, and petroleum received at nonutility power
                       plants and “Commodity Cost” information for all plants in SCHEDULE 2.

             The following information reported on this survey will be protected and not disclosed to the public
DISCLOSURE   until 3 months after it was collected to the extent that it satisfies the criteria for exemption under the
             Freedom of Information Act (FOIA), 5 U.S.C §552, the Department of Energy (DOE) regulations, 10
OF INFOR-    C.F.R. §1004.11, implementing the FOIA, and the Trade Secrets Act, 18 U.S.C. §1905:
                      “Previous Month’s Ending Stocks” and “Stocks at End of Reporting Period” information
MATION                 reported on SCHEDULE 4.




                                                      Page 40 of 41
                                                   FORM EIA-923                                    OMB No. 1905-0129
                                             POWER PLANT OPERATIONS                          Approval Expires: 07/31/2029
                                               REPORT INSTRUCTIONS                                     Burden: 4.4 hours



                All other information reported on Form EIA-923 is public information and may be publicly released in
                company identifiable form.

                The Federal Energy Administration Act requires EIA to provide company- specific data to other federal
                agencies when requested for official use. The information reported on this form may also be made
                available, upon request, to another component of the Department of Energy (DOE), to any Committee
                of Congress, the Government Accountability Office, or other federal agencies authorized by law to
                receive such information. A court of competent jurisdiction may obtain this information in response to
                an order. The information may be used for any non-statistical purposes such as administrative,
                regulatory, law enforcement, or adjudicatory purposes.
           Data protection methods are not applied to the aggregate statistical data published from this survey.
           There may be some statistics that are based on data from fewer than three respondents, or that are
DISCLOSURE
           dominated by data from one or two large respondents. In these cases, it may be possible for a
           knowledgeable person to closely estimate the information reported by a specific respondent.
OF INFOR-

MATION




                                                      Page 41 of 41
