American Mineral RegistryResearch & data

Copper Supply and Demand Statistics: Production, Recycling and Projected Gaps

Updated

Copper supply and demand statistics describe several different markets: material mined, copper refined, scrap returned to use and the primary supply required under future scenarios. USGS estimates world mine production at 23 million metric tons in 2025, compared with 29 million metric tons of refinery output. The difference does not represent missing copper: refining includes material moving through a different stage and can incorporate secondary feedstock. (USGS, Mineral Commodity Summaries 2026, copper tables; accessed, Nov 2026).

On this page
  1. Key Takeaways
  2. Which countries produce the most copper?
  3. Why do mining and refining rankings differ?
  4. What does the United States produce and consume?
  5. How much does recycling contribute to copper supply?
  6. Is a copper shortage forecast for 2035?
  7. Why do two sources report different values for the same year?
  8. Frequently asked questions
  9. Methodology and Sources

The IEA’s 2026 assessment projects a 25% gap against primary copper supply requirements in 2035 under its stated-policy comparison, down from around 30% in the preceding outlook. That is an assessment of existing and announced mining projects against a modeled requirement, not evidence that a quarter of today’s orders cannot be filled. This reference brings the production tables, US historical inputs, source revisions, recycling boundaries and forecast definitions together. All quantities retain their source years and estimate status. (IEA, Global Critical Minerals Outlook 2026; accessed, Nov 2026).

Key Takeaways

  • 23 million metric tons was estimated world mine output in 2025. (USGS 2026, world table; accessed, Nov 2026).
  • 29 million metric tons was estimated world refinery output in 2025, a different production stage. (USGS 2026, world table; accessed, Nov 2026).
  • Chile mined 5.3 million tons, about 23.04% of the rounded world total by AMR calculation. (USGS 2026; accessed, Nov 2026).
  • China refined 14 million tons while mining 1.8 million tons in the same source year. (USGS 2026; accessed, Nov 2026).
  • US mine output was 1 million tons, compared with 850,000 tons of refinery production in 2025 estimates. (USGS 2026; accessed, Nov 2026).
  • US net import reliance reached an estimated 57% of apparent consumption in 2025. (USGS 2026; accessed, Nov 2026).
  • US 2024 mine output was revised from 1.1 to 1.05 million tons between the two MCS editions. (USGS 2025; accessed, Nov 2026). (USGS 2026; accessed, Nov 2026).
  • 160,000 tons of old scrap and 760,000 tons of new scrap were recovered in the 2025 US estimates. (USGS 2026; accessed, Nov 2026).
  • 60,000 tons of secondary refinery output is a stage measure that overlaps the scrap stream. (USGS 2026; accessed, Nov 2026).
  • 42% of US copper product use was building construction, using the end-use classification cited by USGS. (USGS 2026; accessed, Nov 2026).
  • The projected 2035 gap narrowed by about 5 percentage points, comparing 30% with 25%. (IEA 2026; accessed, Nov 2026).
  • Reserves are a stock, production is a flow. Dividing the two does not establish an exhaustion year. (USGS 2026, reserves and resource notes; accessed, Nov 2026).

Which countries produce the most copper?

Chile is the largest named mine producer in the USGS 2025 estimates. Congo (Kinshasa), Peru and China follow. AMR ranks the named producing countries in the source table and retains “Other countries” in the complete world comparison rather than presenting the list as a census of every country. (USGS 2026, world table; accessed, Nov 2026).

Named copper mine producers compared in 2025 estimates
Figure 1: Mine production is measured in contained copper, not ore mass. Source: USGS 2026. Chart drawn by American Mineral Registry from the source figures, checked 21 Nov 2026.
View chart data

2025 estimates, thousand metric tons of copper; selected named producers.

Where mined copper comes from
CountryMine output (kt)
Chile5300
Congo (Kinshasa)3200
Peru2700
China1800
Russia1300
United States1000

Values and definitions are also readable in HTML. Source precision and scope apply.

USGS 2026 Original primary evidence

Mine ranking 2025
CountryRankMine output estimate (kt)Share of rounded world total (%)Change from 2024 (%)
Chile1530023.0435-3.8113
Congo (Kinshasa)2320013.9137.0234
Peru3270011.7391-1.4599
China418007.8261-2.1739
Russia513005.652227.451
United States610004.3478-4.7619
Zambia79404.08714.2163
Australia87303.1739-4.5752
Indonesia97103.087-29.703
Kazakhstan107103.087-1.9337
Mexico116903.0-3.7657
Canada125002.1739-2.9126
Poland134101.78262.5
India14230.1-14.8148

Primary source · Download matching CSV

What exactly does the ranking measure?

The unit is copper content in mined material, expressed in thousand metric tons in the source. It is not the mass of all rock moved, concentrate shipped or copper ore processed. One thousand source units equals one million metric tons of contained copper. Chile’s source value of 5,300 therefore becomes 5.3 million tons, without implying a mine moved only that much total material.

How are world shares calculated?

AMR divides each named country’s 2025 estimate by the published rounded world total of 23,000 thousand tons. Chile’s calculation is 5,300 / 23,000 × 100 = 23.0435%. The source inputs have limited precision; the calculation’s extra decimal places support reproducibility, not a claim that production is known to four decimal places. The named countries and residual may not reconcile exactly to a rounded world total. Preserve that rounding rather than distribute a manufactured balancing adjustment. (USGS 2026; accessed, Nov 2026).

Can production rank tell us where copper will be available?

Rank identifies origin at the mining stage. It does not establish ownership, the destination of concentrates, processing capacity, contracted supply or which country controls a company. A disruption at a producer can matter to global feedstock even when its domestic refinery output is small. Use the stage comparison below before describing a production leader as a finished-copper supplier.

Why do mining and refining rankings differ?

The world table estimates China’s 2025 refinery output at 14,000 thousand tons and mine output at 1,800 thousand tons. AMR’s arithmetic difference is 12,200 thousand tons, but it is not a net-import estimate. The measures refer to different stages and inputs. (USGS 2026, world table; accessed, Nov 2026).

Mining and refining are different stages
Figure 2: China’s mine and refinery estimates illustrate why stage labels matter. Source: USGS 2026. Chart drawn by American Mineral Registry from the source figures, checked 21 Nov 2026.
View chart data

2025 estimates; mine and refinery output are separate stages, not a trade balance.

Mining and refining tell different stories
CountryMine (kt)Refinery (kt)
China180014000
Chile53001700
United States1000850

Values and definitions are also readable in HTML. Source precision and scope apply.

USGS 2026 Original primary evidence

Refining versus mining
CountryMine 2025 estimate (kt)Refinery 2025 estimate (kt)Refinery minus mine (kt)Interpretation
United States1000850-150Different stages; difference is not net imports
Australia730460-270Different stages; difference is not net imports
Canada500320-180Different stages; difference is not net imports
Chile53001700-3600Different stages; difference is not net imports
China18001400012200Different stages; difference is not net imports
Congo (Kinshasa)32002800-400Different stages; difference is not net imports
Germany0610610Different stages; difference is not net imports
India23620597Different stages; difference is not net imports
Indonesia710400-310Different stages; difference is not net imports
Japan014001400Different stages; difference is not net imports
Kazakhstan710500-210Different stages; difference is not net imports
Korea, Republic of0610610Different stages; difference is not net imports
Mexico690480-210Different stages; difference is not net imports
Peru2700340-2360Different stages; difference is not net imports
Poland410560150Different stages; difference is not net imports
Russia1300950-350Different stages; difference is not net imports
Zambia940270-670Different stages; difference is not net imports
Other countries30002100-900Different stages; difference is not net imports

Primary source · Download matching CSV

Why can a refinery country produce more than it mines?

Refineries can process imported feedstock and secondary material. Annual production also crosses inventory and timing boundaries. A subtraction between refinery and mine output shows the scale difference between stages; it cannot identify the amount of imported concentrate, metal recovered from scrap or stock changes without those separate inputs.

Which world table should a writer use?

Use mine output for the origin of newly extracted copper. Use refinery output for the production of refined copper. Use import data for trade dependence. The complete USGS table below keeps both production stages and reserves visible so a reader can choose the relevant measure rather than quote the largest number available.

World production reserves
GeographyMine 2024 (kt)Mine 2025 estimate (kt)Refinery 2024 (kt)Refinery 2025 estimate (kt)Reserves (kt)
United States1050100092185047000
Australia765730434460100000
Canada5155003243207000
Chile5510530019401700180000
China18401800124001400041000
Congo (Kinshasa)299032002560280080000
Germany005976100
India27235456202200
Indonesia101071034940021000
Japan00157014000
Kazakhstan72471049850020000
Korea, Republic of006046100
Mexico71769048948053000
Peru2740270038534085000
Poland40041058956033000
Russia1020130089695080000
Zambia82394018927021000
Other countries2850300023102100210000
World total (rounded)23000230002760029000980000

Primary source · Download matching CSV

USGS explicitly defines the dash in this world table as zero. Those cells can therefore be transcribed as zero with that source convention recorded. The Australia reserve cell includes footnote 7 before 100,000; the footnote is not part of the number. AMR retains 100,000 thousand tons, not 7,100,000. These are transcription issues with large consequences for reuse. (USGS 2026, table footnotes; accessed, Nov 2026).

Are reserves the same as resources?

No. The source distinguishes reported reserves from a broader resource assessment, including identified and undiscovered material. A reserve estimate is conditional on knowledge, economics and the source’s classification at the time. It is neither a fixed physical limit nor an immediately deliverable inventory.

What does the United States produce and consume?

USGS estimates 2025 recoverable mine production at 1,000 thousand tons, primary refinery production at 790 thousand tons and secondary refinery production at 60 thousand tons. Primary plus secondary refinery output gives the 850 thousand tons in the world table. (USGS 2026, salient statistics; accessed, Nov 2026).

US copper measures retain separate denominators
Figure 3: The five-year panel uses the same USGS edition throughout. Source: USGS 2026. Chart drawn by American Mineral Registry from the source figures, checked 21 Nov 2026.
View chart data

2025 US estimates, thousand metric tons; apparent and reported consumption differ.

Choose the US copper denominator
MeasureValue
Mine output1,000 kt
Reported refined consumption1,700 kt
Apparent consumption2,200 kt
Net import reliance57% of apparent consumption

Values and definitions are also readable in HTML. Source precision and scope apply.

USGS 2026 Original primary evidence

Us history
Measure20212022202320242025 estimateUnit
Mine, recoverable12301230113010501000thousand metric tons copper
Primary refinery output931917843882790thousand metric tons copper
Secondary refinery output4940393960thousand metric tons copper
Copper from old scrap169152137140160thousand metric tons copper
Refined imports9197327719031700thousand metric tons copper
Refined exports48272972110thousand metric tons copper
Reported refined consumption17501720158015801700thousand metric tons copper
Apparent consumption19701810168018602200thousand metric tons copper
Yearend refined stocks11784128123450thousand metric tons copper
Net import reliance (%)4441424557percent

Primary source · Download matching CSV

Why are there two consumption measures?

Reported refined consumption describes the reporting category in the salient table. Apparent consumption is an accounting measure incorporating primary refined production, old scrap, refined imports, refined exports and stock adjustments. The 2025 values are 1,700 and 2,200 thousand tons respectively. They should not be interchanged as denominators for the same percentage.

What does 57% import reliance mean?

The source defines net import reliance using refined imports minus refined exports, adjusted for refined stocks, as a percentage of apparent consumption. It is not simply imports divided by refinery output. Refined imports are estimated at 1,700 thousand tons and refined exports at 110 thousand tons, but the stock adjustment means their difference alone is not the complete numerator. The 57% figure should remain attributed to USGS rather than reconstructed from incompatible rounded components.

What does the US history actually show?

The current source edition gives US mine output of 1,230 thousand tons in 2021 and 1,000 thousand tons in 2025. AMR calculates a decrease of about 18.70% across those endpoints. This is a comparison within one edition. It is different from taking an old estimate for 2024 out of another edition and labeling the difference a one-year production change. Stocks, trade and refinery figures can move independently, so a mine-output change alone cannot explain the full import-reliance outcome.

How much does recycling contribute to copper supply?

USGS reports estimated recovery of 160 thousand tons from old scrap and 760 thousand tons from new scrap in 2025. Their combined 920 thousand tons includes recovery into refined metal, alloys and other forms. It is not equivalent to the 60 thousand tons reported as secondary refinery production. (USGS 2026, recycling paragraph and notes; accessed, Nov 2026).

Copper scrap measures overlap refinery stages
Figure 4: Post-consumer scrap, manufacturing scrap and secondary refining are not three additive supply streams. Source: USGS 2026. Chart drawn by American Mineral Registry from the source figures, checked 21 Nov 2026.
View chart data

2025 US estimates; these categories must not all be added together.

Scrap recovery overlaps processing
MeasureAmount and boundary
Old scrap160 kt, post-consumer
New scrap760 kt, manufacturing
Secondary refinery output60 kt, overlapping stage

Values and definitions are also readable in HTML. Source precision and scope apply.

USGS 2026 Original primary evidence

Us scrap boundaries
Measure2025 estimate (kt)Scope
Old scrap160Post-consumer material, all reported recovery forms
New scrap760Manufacturing scrap
Secondary refinery output60A production stage; overlaps scrap recovery, do not add again

Primary source · Download matching CSV

What is old scrap versus new scrap?

Old scrap is post-consumer material returning after use. New scrap arises during manufacturing and fabrication. Their different timing matters: new scrap can return quickly within production, while old scrap depends on the life of products already in use. A high new-scrap recovery figure does not prove an equivalent rate of end-of-life consumer collection.

Why not add all three numbers?

Secondary refinery output measures a processing stage. Material entering that stage can already be counted in the scrap recovery streams. Adding 160, 760 and 60 would mix feedstock recovery and output stages, creating a double count. The source’s statement that scrap contributes about 30% of US supply uses a broader supply definition, including new scrap, than the apparent-consumption line used for net import reliance. One cannot use the percentage from one definition with the denominator from the other.

Does recycling remove the need for mines?

Recycling returns existing material, while mine supply introduces newly extracted copper. The two are related but distinct. Whether secondary supply meets a particular requirement depends on collection, product lifetimes, process losses, quality and the demand definition. The available source supports the measured scrap quantities and its own approximate supply share; it does not establish a universal percentage of future mining that can be avoided.

Is a copper shortage forecast for 2035?

The IEA’s 2026 Outlook compares expected mine supply from existing and announced projects with primary supply requirements. The stated-policy comparison shows a projected gap around 25% in 2035, narrower than around 30% in the previous assessment. AMR records both as scenario-specific projections, with the prior figure identified as reported retrospectively by the 2026 source. (IEA 2026, outlook and chart notes; accessed, Nov 2026).

The projected copper gap changed between assessments
Figure 5: The same 2035 target year has different scenario estimates across vintages. Source: IEA 2026. Chart drawn by American Mineral Registry from the source figures, checked 21 Nov 2026.
View chart data

2035 primary copper requirement, STEPS; rounded projections described in IEA 2026.

The same forecast year, a revised gap
AssessmentGapImplied coverage
Prior assessmentaround 30%around 70%
2026 assessment25%75%
AMR differenceabout 5 percentage points narrowernot a current shortage

Values and definitions are also readable in HTML. Source precision and scope apply.

IEA 2026 Original primary evidence

Forecast vintages
AssessmentTarget yearScenarioProjected gap (%)Implied supply coverage (%)Evidence
Prior Outlook as reported by IEA 20262035STEPS3070Approximate prior projection, not actual shortage
IEA 2026 Outlook2035STEPS2575Announced-project base case; not an observed shortage

Primary source · Download matching CSV

What is the denominator of the gap?

Primary supply requirements are total demand net of secondary supply, with an allowance for refining losses. They are not total end-user demand without adjustment. Expected supply is mined or raw material output associated with the source’s project pipeline. A gap against primary requirements therefore cannot be quoted as a 25% shortfall of all copper demand without changing the meaning.

How large was the revision?

Moving from about 30% to 25% narrows the gap by about 5 percentage points. Relative to the earlier gap, that is a reduction of about 16.67%, not 5%. The implied coverage of the requirement changes from about 70% to about 75%. Those are arithmetic restatements of rounded source percentages, not separately measured quantities. The absolute tonnage cannot be inferred without the matching scenario requirement.

What could change the result?

Project delivery, output at existing mines, secondary supply, losses and demand assumptions all affect the balance. The chart’s current-policy, stated-policy and high-demand scenarios answer different conditional questions. New projects or revised expectations can change a later assessment even when the target year remains 2035. Preserve scenario, edition and target year in an attribution; a bare claim that “copper will run out” is unsupported by this comparison.

Why do two sources report different values for the same year?

A value can change because an estimated year is revised, not because a different physical year occurred. The 2025 MCS estimated 2024 US mine output at 1,100 thousand tons; MCS 2026 records 1,050 thousand tons for that same year. AMR calculates a revision of minus 50 thousand tons, or about minus 4.55% relative to the earlier estimate. (USGS MCS 2025; accessed, Nov 2026). (USGS MCS 2026; accessed, Nov 2026).

A same-year revision is not an annual change
Figure 6: Compare 2024 across source editions separately from the five-year trend. Source: USGS 2025 and 2026. Chart drawn by American Mineral Registry from the source figures, checked 21 Nov 2026.
View chart data

2024 US mine production, thousand metric tons; source editions differ.

A revision holds the year constant
Source edition2024 estimate
MCS 20251100
MCS 20261050

Values and definitions are also readable in HTML. Source precision and scope apply.

USGS 2025 and 2026 Original primary evidence

Same year revisions
2024 measureMCS 2025 estimateMCS 2026 valueRevisionUnit
Mine, recoverable11001050-50kt
Primary refinery output85088232kt
Secondary refinery output4039-1kt
Copper from old scrap150140-10kt
Refined imports81090393kt
Refined exports607212kt
Reported refined consumption16001580-20kt
Apparent consumption1800186060kt
Yearend refined stocks7012353kt
Net import reliance (%)45450percentage points

Primary source · Primary source · Download matching CSV

How should revisions be handled in a trend?

Choose a consistent edition for a historical trend. If the analytical purpose is to study revisions, hold the year constant and compare editions instead. AMR’s revision table does the latter. It includes stock, trade, production and consumption changes so a reused figure can be traced to its source vintage.

What are the main end uses?

End use
UseShare (%)
Building construction42
Electrical and electronic products23
Transportation equipment18
Consumer and general products10
Industrial machinery and equipment7

Primary source · Download matching CSV

The end-use percentages cited by USGS describe copper and copper-alloy products in the stated categories. Building construction accounts for 42%, electrical and electronic products 23%, transportation equipment 18%, consumer and general products 10%, and industrial machinery and equipment 7%. These sum to 100% within that classification. They do not identify a standalone AI, EV or data-center share. Those technologies can span more than one category, and assigning a new percentage would require additional evidence.

Which figure belongs in a headline?

For a production headline, use the measured stage, year and estimate status. For a demand headline, identify consumption type. For a shortage headline, preserve forecast scenario and target year. For a recycling headline, identify whether the metric is scrap recovery, secondary refinery output or a share of supply. That specificity makes the statistic reusable without turning a valid source number into a different claim.

How should this research be quoted?

Use the date and denominator beside the number. Attribute original measurements to their producers and AMR’s calculations or comparisons to American Mineral Registry. The specific finding controls below preserve those qualifications and link the exact evidence. A source-derived estimate is not a transaction price, a current operational reading or a forecast guarantee.

Frequently asked questions

Does 23 million tons mean all the ore mined?

No. USGS reports contained copper. Total ore and waste-rock mass is a different measure.

Why is refinery output greater than mine output?

Refinery output and mine output measure different stages. Secondary feedstock and inventory or trade timing prevent a simple equality.

Which country mines the most copper?

Chile is the largest named producer in the 2025 USGS estimates at 5.3 million metric tons. (USGS 2026; accessed, Nov 2026).

Is China the largest miner?

China is the largest refinery producer in this table, while Chile is the largest mine producer. The distinction changes the answer.

Are the 2025 figures final?

The source marks the 2025 values as estimates. Preserve that label even when the arithmetic is exact.

Does the 25% gap mean a shortage today?

No. It is a conditional comparison for 2035 under an IEA scenario and project pipeline.

Can reserves divided by production predict depletion?

No. That ratio assumes a fixed reserve estimate and fixed production while ignoring future discovery, economics, reclassification, recycling and demand changes.

Can I download the full comparison?

Yes. The data section includes every table, a source-cell ledger, definitions and a calculation bundle without an account or form.

Methodology and Sources

AMR transcribed the complete USGS world copper table and selected salient US statistics from MCS 2026, retaining its thousand-metric-ton copper-content unit, 2025 estimate status, zero convention and reserve footnotes. The named-country mine ranking excludes the residual “Other countries” bucket and zero mine producers; the complete source comparison remains available. Shares divide by the rounded 23,000 thousand-ton world total. US history uses one source edition; the revision table separately compares 2024 values in MCS 2025 and 2026. Percentage changes use (new / old minus 1) × 100; percentage-point changes subtract percentages directly. The forecast table uses the IEA 2026 description of its current and prior assessments and does not claim an independent extraction of absolute scenario tonnage. These are AMR compilations and calculations from producer evidence, not a survey or proprietary market-price database. (USGS 2026; accessed, Nov 2026). (USGS 2025; accessed, Nov 2026). (IEA 2026; accessed, Nov 2026).

The source-cell ledger identifies the underlying table or paragraph for each input. Calculations retain more decimal places in CSV than the source precision warrants for prose; users should quote rounded values with qualifications. Source revisions can change the historical record. The reproduction bundle contains the published CSV inputs, formulas, a validation program and methods; original producer documents remain linked at their official locations.

Glossary

  • Mine production. Copper content recovered at the mining stage.
  • Refinery production. Output from refining, including primary and secondary production.
  • Old scrap. Post-consumer material recovered after use.
  • New scrap. Manufacturing and fabrication scrap.
  • Apparent consumption. A source-defined accounting measure using production, scrap, trade and stock changes.
  • Net import reliance. Source-defined net imports with stock adjustments relative to apparent consumption.
  • Reserves. A source-classified stock under the conditions of its assessment.
  • Primary requirement. Demand net of secondary supply, with source adjustments for losses.
  • STEPS. The IEA Stated Policies Scenario.
  • Vintage. The particular edition of a source or model assessment.

Sources

Cite a specific finding

Copy the exact comparison with its period, scope and original evidence.

Chile’s share of world mine production

AMR calculates Chile’s 2025 estimated mine output as 23.0435% of the rounded world mine total, using 5,300 / 23,000 thousand metric tons.

A source-derived share from rounded estimates, not an independent measurement.

American Mineral Registry. AMR calculates Chile’s 2025 estimated mine output as 23.0435% of the rounded world mine total, using 5,300 / 23,000 thousand metric tons. A source-derived share from rounded estimates, not an independent measurement. https://americanmineralregistry.com/research/copper-supply-demand-production-statistics#copper-country-share Original evidence: https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-copper.pdf
HTML attribution<a href="https://americanmineralregistry.com/research/copper-supply-demand-production-statistics#copper-country-share">American Mineral Registry</a>. AMR calculates Chile’s 2025 estimated mine output as 23.0435% of the rounded world mine total, using 5,300 / 23,000 thousand metric tons. A source-derived share from rounded estimates, not an independent measurement. Original evidence: <a href="https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-copper.pdf">Primary source</a>.

Supporting table · Permanent finding link · Matching CSV · Original evidence

The projected copper gap changed by 5 percentage points

IEA 2026 describes the projected 2035 STEPS primary copper gap narrowing from around 30% in its prior assessment to 25%; AMR calculates an approximately 5 percentage-point change.

A scenario projection and vintage comparison, not a current shortage.

American Mineral Registry. IEA 2026 describes the projected 2035 STEPS primary copper gap narrowing from around 30% in its prior assessment to 25%; AMR calculates an approximately 5 percentage-point change. A scenario projection and vintage comparison, not a current shortage. https://americanmineralregistry.com/research/copper-supply-demand-production-statistics#copper-supply-gap Original evidence: https://www.iea.org/reports/global-critical-minerals-outlook-2026/outlook
HTML attribution<a href="https://americanmineralregistry.com/research/copper-supply-demand-production-statistics#copper-supply-gap">American Mineral Registry</a>. IEA 2026 describes the projected 2035 STEPS primary copper gap narrowing from around 30% in its prior assessment to 25%; AMR calculates an approximately 5 percentage-point change. A scenario projection and vintage comparison, not a current shortage. Original evidence: <a href="https://www.iea.org/reports/global-critical-minerals-outlook-2026/outlook">Primary source</a>.

Supporting table · Permanent finding link · Matching CSV · Original evidence

The same 2024 mine year was revised

USGS MCS 2025 estimated US 2024 mine output at 1,100 kt; MCS 2026 records 1,050 kt. AMR calculates a downward same-year revision of 50 kt.

Same observation year, different source editions. USGS MCS 2025: https://pubs.usgs.gov/periodicals/mcs2025/mcs2025-copper.pdf

American Mineral Registry. USGS MCS 2025 estimated US 2024 mine output at 1,100 kt; MCS 2026 records 1,050 kt. AMR calculates a downward same-year revision of 50 kt. Same observation year, different source editions. USGS MCS 2025: https://pubs.usgs.gov/periodicals/mcs2025/mcs2025-copper.pdf https://americanmineralregistry.com/research/copper-supply-demand-production-statistics#copper-source-revision Original evidence: https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-copper.pdf
HTML attribution<a href="https://americanmineralregistry.com/research/copper-supply-demand-production-statistics#copper-source-revision">American Mineral Registry</a>. USGS MCS 2025 estimated US 2024 mine output at 1,100 kt; MCS 2026 records 1,050 kt. AMR calculates a downward same-year revision of 50 kt. Same observation year, different source editions. USGS MCS 2025: https://pubs.usgs.gov/periodicals/mcs2025/mcs2025-copper.pdf Original evidence: <a href="https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-copper.pdf">Primary source</a>.

Supporting table · Permanent finding link · Matching CSV · Original evidence

Data and downloads

No account or form is required. CSV tables preserve the article’s units, evidence periods and source estimates.

Complete research bundle (ZIP) · Source-cell ledger (CSV) · Methods and reproduction instructions · Calculation and validation program · Data dictionary

End use (CSV)

Forecast vintages (CSV)

Mine ranking 2025 (CSV)

Refining versus mining (CSV)

Same year revisions (CSV)

Us history (CSV)

Us scrap boundaries (CSV)

World production reserves (CSV)

Cite this page

Credit the original producer and preserve the evidence period, units and denominator. AMR calculations and compilations are identified explicitly.

American Mineral Registry. "Copper Supply and Demand Statistics: Production, Recycling and Projected Gaps." American Mineral Registry, November 2026. https://americanmineralregistry.com/research/copper-supply-demand-production-statistics/
<a href="https://americanmineralregistry.com/research/copper-supply-demand-production-statistics/">Copper Supply and Demand Statistics</a> (American Mineral Registry, November 2026)