Key Takeaways
- Tellurium and selenium can come from the same copper-refining stream. The IEA gives theoretical quantities of 20 tonnes of tellurium and 50 tonnes of selenium per 1,000 tonnes of anode slime. (IEA Annex, p. 367 (accessed), Nov 2026)
- Three by-product labels appear under two hosts. In the IEA table, silver is paired with copper and lead, cobalt with copper and nickel, and gallium with zinc and aluminium. (IEA Annex, pp. 367–368 (accessed), Nov 2026)
- The original feed matters. The zinc example for indium uses one million tonnes of concentrate. The zinc example for germanium uses one million tonnes of ore. (IEA Annex, p. 368 (accessed), Nov 2026)
- A country can recover an intermediate and still import refined material. Two U.S. facilities produced copper telluride in 2025 and sent it abroad for further processing. USGS estimated U.S. net import reliance for tellurium at more than 25% of apparent consumption. (USGS Tellurium, p. 1, Feb 2026)
How much of the selected by-product route evidence concerns refining?
Refining accounted for 87.50% of the 16 selected by-product recovery routes counted from IEA evidence. That is 7.0 times the number at mining and smelting combined. (International Energy Agency, Global Critical Minerals Outlook 2026, by-product routes and feed bases, Nov 2026).
| Calculated comparison | Result | Calculation |
|---|---|---|
| Non-refining routes in the selected comparison | 2 routes | B + C |
| Refining routes per route at the other two stages | 7.0 times | A ÷ (B + C) |
| Share of selected routes at refining | 87.50% | A ÷ (A + B + C) × 100 |
A route is a host, by-product and recovery pathway. Routes have different feed denominators and can share a host or a by-product. The count treats each distinct route as one observation, with no weighting for tonnes, revenue or actual recovery.
How to use this comparison
For a refinery project, request feed assays, the stream where the element concentrates, the recovery rate and a buyer specification. The route count can point to the right plant stage while physical supply still depends on all four inputs. Related evidence on Molybdenum Supply Statistics: Mine Production, By-products and Trade.
Reproduce the numbers
Each letter in the calculation maps to a source value below. Calculate from the displayed source values and round the result only at the end. The download records the source file, row, field and formula.
| Input | What is measured | Source value | Exact source row and field |
|---|---|---|---|
| A | Refining routes | 14 | Refining · Route count |
| B | Mining routes | 1 | Mining · Route count |
| C | Smelting routes | 1 | Smelting · Route count |
Download the calculation and source rows (CSV)
Cite this comparison
Refining accounted for 87.50% of the 16 selected by-product recovery routes counted from IEA evidence. That is 7.0 times the number at mining and smelting combined. American Mineral Registry calculation from International Energy Agency, Global Critical Minerals Outlook 2026, by-product routes and feed bases. 16 selected routes tabulated by AMR from the IEA 2026 evidence. https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#amr-reader-analysis
HTML attribution
<a href="https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#amr-reader-analysis">How much of the selected by-product route evidence concerns refining?</a>
Where in the supply chain are by-products recovered?
A by-product is a material recovered alongside the main product in an operation. The host provides the feedstock or residue used to recover the smaller stream. Recovery can therefore depend on host production, the mineral content of that feed, the process used and the availability of equipment for separation. The location of recovery can be a processing facility outside the country where the host ore was mined.
View chart data
Counts from two IEA annex pages. Each host by-product pair is one row.
| IEA recovery stage | Routes |
|---|---|
| Mining | 1 |
| Smelting | 1 |
| Refining | 14 |
Values and definitions are also readable in HTML. Source precision and scope apply.
IEA 2026 Annex, Roots of by-products, pp. 367–368 Original primary evidence
| Recovery stage | Route count | Share of selected routes (%) |
|---|---|---|
| Mining | 1 | 6.25 |
| Smelting | 1 | 6.25 |
| Refining | 14 | 87.50 |
IEA Annex, p. 367 · IEA Annex, p. 368 · Download matching CSV
Copper accounts for seven listed routes. Two occur before refining: molybdenum separated during beneficiation at the mine stage and rhenium recovered during roasting at the smelting stage. Copper’s other five entries occur at refining. The other nine entries in the two-page selection are all assigned to refining. Refining here identifies the stage where the producer places the route.
| Host product | By-product | Recovery stage | Process or stream | Theoretical tonnes | Original feed basis |
|---|---|---|---|---|---|
| Copper | Molybdenum | Mining | Flotation during beneficiation | 10–1,000 | 1 million tonnes of ore |
| Copper | Rhenium | Smelting | Roasting | 0.1–0.6 | 1 million tonnes of ore |
| Copper | Gold | Refining | Electrorefining anode residues | 0.1–1 | 1 million tonnes of ore |
| Copper | Silver | Refining | Electrorefining anode residues | 0.1–20 | 1 million tonnes of ore |
| Copper | Selenium | Refining | Electrorefining anode residues | 50 | 1 thousand tonnes of anode slime |
| Copper | Tellurium | Refining | Electrorefining anode residues | 20 | 1 thousand tonnes of anode slime |
| Copper | Cobalt | Refining | Acid leach solutions in hydrometallurgy | 100–5,000 | 1 million tonnes of ore |
| Zinc | Indium | Refining | Leach residues and solvent extraction | 40–270 | 1 million tonnes of concentrate |
| Zinc | Germanium | Refining | Roast-leach-electrowinning | 30 | 1 million tonnes of ore |
| Zinc | Gallium | Refining | Leach residues and solvent extraction | 10–500 | 1 million tonnes of ore |
| Lead | Silver | Refining | Hydrometallurgy during lead refining | 500 | 1 million tonnes of concentrate |
| Lead | Bismuth | Refining | Roasting dross and reduction | About 200 | 1 million tonnes of concentrate |
| Lead | Antimony | Refining | Roasting dross and reduction | 4,000 | 1 million tonnes of concentrate |
| Nickel | Cobalt | Refining | Precipitation and electrolytic refining | 1,000–2,000 | 1 million tonnes of ore |
| Nickel | Platinum group metals | Refining | Anode residues (annex specifies copper electrolytic refining) | About 9 palladium and 2 platinum | 1 million tonnes of ore |
| Aluminium | Gallium | Refining | Solvent extraction and electrowinning | 10–100 | 1 million tonnes of ore |
IEA Annex, p. 367 · IEA Annex, p. 368 · Download matching CSV
Some by-products can be recovered from more than one host, even within this small published selection. It takes a second source to establish which route dominates actual output. For instance, the IEA lists both zinc and aluminium routes for gallium. USGS describes bauxite processing as the predominant primary route in the world and also identifies zinc ores as a source. A supply discussion can therefore lead with bauxite and still account for the zinc route in a separate row. (USGS Gallium, p. 1, Feb 2026)
| By-product | Hosts shown | Source feed basis | Interpretation |
|---|---|---|---|
| Silver | Copper and lead | Copper ore and lead concentrate | The IEA entries use different feed materials |
| Cobalt | Copper and nickel | Copper ore and nickel ore | Yield ranges are indicative and ore-specific |
| Gallium | Zinc and aluminium | Zinc ore and aluminium host ore | USGS says bauxite processing is the dominant global primary route |
IEA Annex, p. 367 · IEA Annex, p. 368 · USGS Gallium · Download matching CSV
Why do the theoretical yields have different denominators?
An ore measure uses the mass of mined material in the stated feed. A concentrate is a processed stream, usually upstream of smelting or refining. Anode slime is a residue from electrolytic refining. The IEA gives quantities for those different inputs, so each yield travels with its feedstock description.
View chart data
Three selected host, recovery stream and by-product relationships.
| Host | Recovery stream | By-product |
|---|---|---|
| Copper | Electrorefining anode residues | Tellurium |
| Zinc | Leach residues | Indium |
| Aluminium | Solvent extraction and electrowinning | Gallium |
Values and definitions are also readable in HTML. Source precision and scope apply.
IEA Annex host and recovery process examples, pp. 367–368 Original primary evidence
For example, the IEA’s 20 tonnes of tellurium per 1,000 tonnes of copper anode slime is a 2% ratio on that residue. Its 30 tonnes of germanium per million tonnes of zinc ore equals 30 grams per metric ton of ore, or 0.003%. The second conversion is useful for interpreting the zinc row. A conversion to the same mass unit still leaves different material streams in the denominator. The feed has already been concentrated by processing in one example. In the other, the denominator starts at ore.
The aluminium route in the IEA table gives an indicative gallium range of 10 to 100 tonnes per million tonnes of ore. The zinc route gives 10 to 500 on its own ore basis. Those published ranges are theoretical and depend on the indicative grades reported by the IEA. To estimate output for a real project, establish throughput at the relevant stage, the by-product grade of that feed, recovery efficiency and when the recovery equipment actually operates. A deposit’s contained metal can be much higher than the metal recovered and sold.
What do the U.S. import data say about recovery and refining?
Four USGS chapters illustrate how domestic processing and import dependence can coexist. U.S. gallium and indium net import reliance were both 100% in the 2025 figures, with different consumption definitions. Germanium was reported at more than 50% and tellurium at more than 25%. USGS publishes these two results as lower bounds. The ordering of the bounds alone does not establish the ordering of actual reliance.
View chart data
Four 2025 USGS figures. Each line preserves the original qualifier and denominator.
| Material | USGS estimate | Consumption basis |
|---|---|---|
| Gallium | 100% | Reported consumption |
| Germanium | >50% | Estimated consumption |
| Indium | 100% | Estimated consumption |
| Tellurium | >25% | Apparent consumption |
Values and definitions are also readable in HTML. Source precision and scope apply.
USGS 2026 Tellurium, p. 1, and related commodity chapters Original primary evidence
| Material | USGS net import reliance in 2025 | Published denominator | Domestic stage distinction |
|---|---|---|---|
| Gallium | 100% | Reported consumption | No U.S. primary recovery. High-purity material recovered and refined from imported feed and new scrap. |
| Germanium | >50% | Estimated consumption | Some germanium-bearing zinc concentrate was produced domestically. No U.S. primary refinery production is reported. |
| Indium | 100% | Estimated consumption | No U.S. recovery from ores in 2025. Products made with imported indium metal. |
| Tellurium | >25% | Apparent consumption | Two U.S. facilities produced copper telluride and exported it for further processing. |
USGS Gallium · USGS Germanium · USGS Indium · USGS Tellurium · Download matching CSV
Gallium. USGS reports no domestic primary recovery since 1987, while a U.S. facility recovered and refined high-purity gallium from imported low-purity material and new scrap. Its 2025 import estimates show 25,000 kilograms of gallium metal, measured as gallium content. The chapter’s gallium arsenide wafer trade series is measured in gross weight, so keep it in a separate product-form comparison. (USGS Gallium, p. 1, Feb 2026)
Germanium. USGS describes germanium-bearing zinc concentrates from Alaska and reports that some went to Canada. Its 2025 U.S. imports include 7,000 kilograms of germanium in metal and 17,000 kilograms of germanium in dioxide. Those categories are separate from the domestic extraction of germanium-bearing material. The chapter reports more than 50% reliance and leaves several underlying quantities unavailable. (USGS Germanium, p. 1, Feb 2026)
Indium. No domestic indium was recovered from ore in 2025 according to USGS. It estimates both refined indium imports and consumption at 220 metric tons, with the consumption estimate based on imports. U.S. companies still made alloys, compounds and other indium products from imported metal. (USGS Indium, p. 1, Feb 2026)
Tellurium. The two U.S. facilities produced copper telluride from anode slimes. USGS identifies Texas and Utah as their locations and reports that both exported the intermediate for further processing. Certain U.S. downstream operations processed imported tellurium. The reported import quantity was 14 metric tons and the reliance figure was more than 25%. The chapter withholds domestic production and apparent consumption to protect company-level information. The published threshold is the relevant citation. (USGS Tellurium, p. 1, Feb 2026)
| Mineral | 2025 import line | USGS estimate | Unit |
|---|---|---|---|
| Gallium | Metal, gallium content | 25,000 | kg |
| Germanium | Metal, germanium content | 7,000 | kg |
| Germanium | Dioxide, germanium content | 17,000 | kg |
| Indium | Refined indium | 220 | metric tonnes |
| Tellurium | Tellurium imports for consumption | 14 | metric tonnes |
USGS Gallium · USGS Germanium · USGS Indium · USGS Tellurium · Download matching CSV
How to cite a by-product statistic
State the host, recovery stage and feed basis together. Describe actual output, theoretical recovery and import reliance as separate measures. If discussing the potential of domestic production, check for facilities that perform the separation, for intermediate exports and for the form bought by final users. A country can appear in a copper or zinc mine ranking without entering the refined by-product table. For broader stage concentration see AMR’s mining and refining comparison.
How much by-product might a given feed contain, and what can actually be recovered?
A theoretical yield quoted per million tonnes of ore can appear smaller than one quoted per thousand tonnes of process residue simply because the denominator is different. Converting every entry to grams per metric tonne of its own feed basis is the first step in a defensible process comparison. In the IEA annex, the copper anode-slime example gives 20 tonnes of tellurium per thousand tonnes of slime, equivalent to 20,000 grams per tonne of that residue. Its 50-tonne selenium example is equivalent to 50,000 grams per tonne of the same specified feed. These are not grades of the ore originally mined.
Scroll the full table to compare columns and rows. The complete data are also available as a CSV.
| Host | By-product | Stage | Feed material | Source tonnes | Source feed quantity | Lower equivalent g/t feed | Upper equivalent g/t feed | Quantity type |
|---|---|---|---|---|---|---|---|---|
| Copper | Molybdenum | Mining | Ore | 10–1,000 | 1 million tonnes of ore | 10.00 | 1000.00 | Source range |
| Copper | Rhenium | Smelting | Ore | 0.1–0.6 | 1 million tonnes of ore | 0.10 | 0.60 | Source range |
| Copper | Gold | Refining | Ore | 0.1–1 | 1 million tonnes of ore | 0.10 | 1.00 | Source range |
| Copper | Silver | Refining | Ore | 0.1–20 | 1 million tonnes of ore | 0.10 | 20.00 | Source range |
| Copper | Selenium | Refining | Anode slime | 50 | 1 thousand tonnes of anode slime | 50000.00 | 50000.00 | Source point quantity |
| Copper | Tellurium | Refining | Anode slime | 20 | 1 thousand tonnes of anode slime | 20000.00 | 20000.00 | Source point quantity |
| Copper | Cobalt | Refining | Ore | 100–5,000 | 1 million tonnes of ore | 100.00 | 5000.00 | Source range |
| Zinc | Indium | Refining | Concentrate | 40–270 | 1 million tonnes of concentrate | 40.00 | 270.00 | Source range |
| Zinc | Germanium | Refining | Ore | 30 | 1 million tonnes of ore | 30.00 | 30.00 | Source point quantity |
| Zinc | Gallium | Refining | Ore | 10–500 | 1 million tonnes of ore | 10.00 | 500.00 | Source range |
| Lead | Silver | Refining | Concentrate | 500 | 1 million tonnes of concentrate | 500.00 | 500.00 | Source point quantity |
| Lead | Bismuth | Refining | Concentrate | About 200 | 1 million tonnes of concentrate | 200.00 | 200.00 | Approximate source quantity |
| Lead | Antimony | Refining | Concentrate | 4,000 | 1 million tonnes of concentrate | 4000.00 | 4000.00 | Source point quantity |
| Nickel | Cobalt | Refining | Ore | 1,000–2,000 | 1 million tonnes of ore | 1000.00 | 2000.00 | Source range |
| Nickel | Palladium | Refining | Ore | About 9 | 1 million tonnes of ore | 9.00 | 9.00 | Approximate source quantity |
| Nickel | Platinum | Refining | Ore | About 2 | 1 million tonnes of ore | 2.00 | 2.00 | Approximate source quantity |
| Aluminium | Gallium | Refining | Ore | 10–100 | 1 million tonnes of ore | 10.00 | 100.00 | Source range |
IEA Critical Minerals Outlook 2026, p. 367 · IEA Critical Minerals Outlook 2026, p. 368 · Download matching CSV
Original IEA Annex pp. 367–368 feed bases. One tonne per million tonnes equals 1 g/t; one tonne per thousand tonnes equals 1,000 g/t. No common feed mix or realised recovery assumed.
In this compilation one metric tonne of product per million metric tonnes of feed equals one gram per tonne. Multiplying the source's quantity by 1,000 converts tonnes per thousand tonnes to the same dimensional unit. A single-source quantity is retained as a point value; a source range is preserved as a lower and upper value rather than collapsed to an average. Palladium and platinum quantities are displayed separately because they are different metals. The original annex’s nickel host heading and copper-electrorefining wording are retained in the earlier route table; the wording does not establish an independently verified nickel-refinery flow. IEA Annex, copper routes and other host routes.
For a mine-level assessment a useful conceptual sequence is ore throughput, grade of the target element, fraction reporting to a recoverable stream, stream collection and refinery yield. Each term needs to represent the same boundary and period. If the data start at an anode-slime refinery feed, the early terms are not available and should not be invented by treating residue mass as mine throughput. No realistic plant can be sized solely from the theoretical entries: plant operating characteristics, ore mineralogy, product grade, environmental constraints, collection and purification losses all influence actual output.
Are import trends the same for refined metals and downstream products?
Trade in gallium metal is not the same series as trade in gallium arsenide wafers. USGS estimates that the United States imported 25,000 kg of gallium metal in 2025, up from 8,890 kg in 2021. For GaAs wafers the source gives 110,000 kg of gross wafer mass in 2025 versus 306,000 kg in 2021. Metal imports rose by approximately 181.21%, while gross wafer imports declined by approximately 64.05%. These contrasting changes demonstrate why using the word “gallium imports” without a product form can produce misleading evidence about consumption or supply risk.
Scroll the full table to compare columns and rows. The complete data are also available as a CSV.
| Mineral | Trade line | Unit | 2021 | 2022 | 2023 | 2024 | 2025 estimate | 2021–25 change (%) |
|---|---|---|---|---|---|---|---|---|
| Gallium | Metal imports | kg gallium | 8890 | 11400 | 11400 | 11000 | 25000 | 181.21 |
| Gallium | GaAs wafer imports | kg gross wafer mass | 306000 | 424000 | 163000 | 152000 | 110000 | -64.05 |
| Germanium | Metal imports | kg germanium content | 13000 | 14000 | 22000 | 21000 | 7000 | -46.15 |
| Germanium | Dioxide imports | kg germanium content | 17000 | 15000 | 14000 | 11000 | 17000 | 0.00 |
| Germanium | Metal exports | kg germanium content | 5500 | 6600 | 6000 | 9000 | 7000 | 27.27 |
| Germanium | Dioxide exports | kg germanium content | 430 | 130 | 110 | 92 | 15 | -96.51 |
| Indium | Imports for consumption | metric tonnes | 158 | 202 | 219 | 220 | 220 | 39.24 |
| Tellurium | Imports for consumption | metric tonnes | 42 | 37 | 8 | 6 | 14 | -66.67 |
| Tellurium | Exports | metric tonnes | 2 | 1 | 15 | 3 | 3 | 50.00 |
USGS 2026 Gallium, p. 1 · USGS 2026 Germanium, p. 1 · USGS 2026 Indium, p. 1 · USGS 2026 Tellurium, p. 1 · Download matching CSV
USGS 2026 Salient Statistics. Separate forms and units; changes use same line endpoints. Do not combine gross wafer mass with gallium content or describe gross imports as net consumption.
The Germanium chapter reports metal and dioxide imports and exports in germanium-content units, unlike the gross GaAs wafer line. We preserve the source's kilograms and metric tonnes instead of adding products or treating semiconductors as pure metal. Indium's import line is also the basis of the USGS estimated consumption series; it is not a separate survey of manufacturing use. In the tellurium table 2023 exports of 15 tonnes exceed reported imports of eight tonnes, but domestic production, apparent consumption and producer stocks are withheld. Trade alone cannot reveal how much tellurium the country extracted or recovered in a plant that year. USGS Gallium, Germanium, Indium and Tellurium.
| Material | USGS denominator | 2021 (%) | 2022 (%) | 2023 (%) | 2024 (%) | 2025 estimate (%) |
|---|---|---|---|---|---|---|
| Gallium | Reported consumption | 100 | 100 | 100 | 100 | 100 |
| Germanium | Estimated consumption | >50 | >50 | >50 | >50 | >50 |
| Indium | Estimated consumption | 100 | 100 | 100 | 100 | 100 |
| Tellurium | Apparent consumption | >95 | >75 | E (net exporter) | <25 | >25 |
USGS 2026 Gallium, p. 1 · USGS 2026 Germanium, p. 1 · USGS 2026 Indium, p. 1 · USGS 2026 Tellurium, p. 1 · Download matching CSV
Original USGS net import reliance rows. E is a source code for net exporter; inequalities are not point values.
A 100% net-import-reliance estimate on reported or estimated consumption can coexist with domestic recycling of manufacturing scrap. The reliance percentage is defined by the USGS denominator and trade/production accounting, not a statement that every kilogram encountered by a manufacturer is newly imported ore. A bound such as greater than 50% should remain a bound in a paper or chart. Assigning it 50% or trying to average it with a precise 100% introduces spurious precision.
Why does tellurium illustrate the link between host metal production and energy technology?
The USGS estimate for 2025 attributes 70% of worldwide tellurium consumption to solar cells, 15% to thermoelectric devices, 10% to metallurgy and 5% to other uses. It also attributes 80% of global refined tellurium production to China in the same edition. Unlike a host metal with its own large commodity market, a by-product may depend on a specific residue stream becoming available and on facilities being equipped to recover and purify that element. A material demand scenario for thin-film solar cells is therefore not a direct forecast of copper mine output or of the volume of residues collectible by a particular plant. USGS Tellurium, end uses and world refinery production.
View chart data
Percent of estimated global tellurium consumption, not U.S. production.
| Application | Share (%) |
|---|---|
| Solar power cells | 70.0 |
| Thermoelectric devices | 15.0 |
| Metallurgy | 10.0 |
| Other applications | 5.0 |
Figures retain the source units and definitions.
| Application | Share (%) |
|---|---|
| Solar power cells | 70 |
| Thermoelectric devices | 15 |
| Metallurgy | 10 |
| Other applications | 5 |
USGS 2026 Tellurium, p. 1 · Download matching CSV
USGS 2026 estimate of end uses in global consumption; not allocation of United States mine output.
How much of reported by-product processing capacity is represented by annual output?
Worldwide low-purity primary gallium, indium refinery and tellurium refinery production have separate USGS tables. They also give nominal production or refining capacity for many named locations. Dividing each country's output by its reported capacity gives a useful screening ratio with the same source unit and stage. China’s primary low-purity gallium output is estimated at 900,000 kg in 2025, against 1,600,000 kg of reported capacity, or 56.25%. USGS separately estimates China at 99% of global primary low-purity production. The rounded world aggregate is also 900,000 kg, so dividing those rounded headline values would instead produce an apparent 100%; cite the published 99% concentration estimate rather than that artefact.
| Material and reported stage | Named location | Source unit | 2025 production estimate | 2025 capacity | Output / capacity (%) |
|---|---|---|---|---|---|
| Gallium low-purity primary | China | kg | 900000 | 1600000 | 56.25 |
| Gallium low-purity primary | Japan | kg | 3000 | 10000 | 30.00 |
| Gallium low-purity primary | Russia | kg | 6000 | 10000 | 60.00 |
| Indium refinery | Belgium | t | 19 | 50 | 38.00 |
| Indium refinery | Canada | t | 40 | 70 | 57.14 |
| Indium refinery | China | t | 760 | 1100 | 69.09 |
| Indium refinery | France | t | 21 | 70 | 30.00 |
| Indium refinery | Japan | t | 65 | 70 | 92.86 |
| Indium refinery | Republic of Korea | t | 180 | 310 | 58.06 |
| Indium refinery | Russia | t | 5 | 15 | 33.33 |
| Tellurium refinery | Bulgaria | t | 1 | 5 | 20.00 |
| Tellurium refinery | Canada | t | 28 | 30 | 93.33 |
| Tellurium refinery | China | t | 800 | 1000 | 80.00 |
| Tellurium refinery | Japan | t | 61 | 75 | 81.33 |
| Tellurium refinery | Russia | t | 67 | 80 | 83.75 |
| Tellurium refinery | South Africa | t | 5 | 10 | 50.00 |
| Tellurium refinery | Sweden (concentrate) | t | 48 | 50 | 96.00 |
| Tellurium refinery | Uzbekistan | t | 18 | 50 | 36.00 |
USGS 2026 Gallium, p. 2 · USGS 2026 Indium, p. 2 · USGS 2026 Tellurium, p. 2 · Download matching CSV
USGS 2026 world tables; named rows with positive numeric output and capacity. Not plant-level utilisation. Gallium source figures rounded and China share separately reported as 99%. Indium Uzbekistan has 1 t without capacity. Tellurium US data withheld and Other countries unreported; Sweden is concentrate. Germanium lacks quantitative global country table.
The ratio is not measured plant utilisation. Nameplate capacity and actual output can refer to different operating schedules or a changing facility portfolio, and expansion may become available only late in a year. Spare nominal capacity may not be capable of producing the required specification or be available to a particular buyer. Germanium has no comparable complete country table in the USGS chapter, and indium's Uzbekistan row lacks a capacity value. Tellurium US output is withheld and Sweden is specified as concentrate. The comparison therefore only includes named rows with both numeric figures, rather than treating missing values as zero or claiming a complete market utilisation rate. USGS Gallium, Indium and Tellurium.
How should an analyst evaluate whether by-product supply can respond to demand?
Separate the host-metal market from the potential by-product market. Production may respond to host demand or existing capacity while improved collection, additional processing capacity, higher recovery or recycling changes by-product availability. An increase in by-product price is not by itself proof that a host mine will expand; nor does a doubling of host output imply doubled by-product supply when ore composition or plant recovery changes. Conversely, adding recovery to a previously unrecovered process stream may increase supply with little change in mined tonnes.
The correct research sequence is to identify the route, identify the original feed basis, then request compatible measurements of feed tonnage, content and recovery. For an economic analysis also identify by-product revenue credits, treatment charges and ownership of the intermediate stream rather than presuming all product belongs to the original mine operator. For country-risk analysis use refined output and trade in the precise form needed, not only geological resources. The mining and refining concentration study separately quantifies how geographic shares differ at different industrial stages.
Methodology and sources
The expanded comparisons retain original source periods and row-level source references. Formulas, scope and precision are documented immediately beside each table, in the downloadable methods and source-cell ledger. Rounded primary values are not treated as exact unrounded observations.
AMR compiled all rows in the IEA’s Roots of by-products tables on page 367 and page 368. The platinum group metals entry is one row with separate indicative palladium and platinum amounts. Its host heading is nickel and its process description names copper electrolytic refining, as printed in the annex. The share by stage divides each count by 16. The same pairing can describe different ore types or feed qualities in a real plant. The four domestic trade examples use the published 2025 estimate columns and the domestic-use descriptions in the four named USGS 2026 chapters. The downloads retain the source units and reliance thresholds.
Glossary
- Host material: The main ore, product or processing stream associated with recovery of a by-product.
- Beneficiation: Processing that separates or enriches useful minerals before later stages.
- Anode slime: A refinery residue formed during electrolytic production that can contain recoverable minor metals.
- Theoretical yield: An indicative amount on a specified feed basis, before facility-specific recovery is established.
- Net import reliance: A domestic dependence metric defined in each USGS chapter with its stated consumption basis.
- Withheld value: A figure whose quantity is suppressed in the published table, such as telluride production in the 2025 U.S. series.