American Mineral RegistryResearch & data

By-Product Mineral Statistics: Where Critical Minerals Are Recovered

Updated

Quick Answer

The IEA lists 16 host and by-product recovery routes in two tables in its 2026 mineral outlook. AMR counted 14 at refining, one at mining and one at smelting. The list connects zinc to indium and germanium, copper to tellurium, and aluminium production to gallium. The 87.5% refining share is a count of the routes in this published table. It measures where recovery takes place in the sample of processes. (IEA Global Critical Minerals Outlook 2026, Annex pp. 367–368 (accessed), Nov 2026)

Theoretical tellurium quantity is on an anode-slime basis. IEA reports 20 tonnes of tellurium per 1,000 tonnes of anode slime, equivalent to 20,000 g/t of that residue. This is not a copper-ore grade or a plant recovery rate. Original Annex theoretical feed basis; AMR unit conversion. (IEA Critical Minerals Outlook 2026, p. 367.) Cite this finding.

On this page
  1. Quick Answer
  2. Key Takeaways
  3. Source comparison
  4. Where in the supply chain are by-products recovered?
  5. Why do the theoretical yields have different denominators?
  6. What do the U.S. import data say about recovery and refining?
  7. How to cite a by-product statistic
  8. How much by-product might a given feed contain, and what can actually be recovered?
  9. Are import trends the same for refined metals and downstream products?
  10. Why does tellurium illustrate the link between host metal production and energy technology?
  11. How much of reported by-product processing capacity is represented by annual output?
  12. How should an analyst evaluate whether by-product supply can respond to demand?
  13. Methodology and sources

Key Takeaways

  • Tellurium and selenium can come from the same copper-refining stream. The IEA gives theoretical quantities of 20 tonnes of tellurium and 50 tonnes of selenium per 1,000 tonnes of anode slime. (IEA Annex, p. 367 (accessed), Nov 2026)
  • Three by-product labels appear under two hosts. In the IEA table, silver is paired with copper and lead, cobalt with copper and nickel, and gallium with zinc and aluminium. (IEA Annex, pp. 367–368 (accessed), Nov 2026)
  • The original feed matters. The zinc example for indium uses one million tonnes of concentrate. The zinc example for germanium uses one million tonnes of ore. (IEA Annex, p. 368 (accessed), Nov 2026)
  • A country can recover an intermediate and still import refined material. Two U.S. facilities produced copper telluride in 2025 and sent it abroad for further processing. USGS estimated U.S. net import reliance for tellurium at more than 25% of apparent consumption. (USGS Tellurium, p. 1, Feb 2026)

How much of the selected by-product route evidence concerns refining?

Refining accounted for 87.50% of the 16 selected by-product recovery routes counted from IEA evidence. That is 7.0 times the number at mining and smelting combined. (International Energy Agency, Global Critical Minerals Outlook 2026, by-product routes and feed bases, Nov 2026).

Calculated comparisonResultCalculation
Non-refining routes in the selected comparison2 routesB + C
Refining routes per route at the other two stages7.0 timesA ÷ (B + C)
Share of selected routes at refining87.50%A ÷ (A + B + C) × 100

A route is a host, by-product and recovery pathway. Routes have different feed denominators and can share a host or a by-product. The count treats each distinct route as one observation, with no weighting for tonnes, revenue or actual recovery.

How to use this comparison

For a refinery project, request feed assays, the stream where the element concentrates, the recovery rate and a buyer specification. The route count can point to the right plant stage while physical supply still depends on all four inputs. Related evidence on Molybdenum Supply Statistics: Mine Production, By-products and Trade.

Reproduce the numbers

Each letter in the calculation maps to a source value below. Calculate from the displayed source values and round the result only at the end. The download records the source file, row, field and formula.

InputWhat is measuredSource valueExact source row and field
ARefining routes14Refining · Route count
BMining routes1Mining · Route count
CSmelting routes1Smelting · Route count

Download the calculation and source rows (CSV)

Cite this comparison

Refining accounted for 87.50% of the 16 selected by-product recovery routes counted from IEA evidence. That is 7.0 times the number at mining and smelting combined. American Mineral Registry calculation from International Energy Agency, Global Critical Minerals Outlook 2026, by-product routes and feed bases. 16 selected routes tabulated by AMR from the IEA 2026 evidence. https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#amr-reader-analysis

HTML attribution

<a href="https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#amr-reader-analysis">How much of the selected by-product route evidence concerns refining?</a>

Where in the supply chain are by-products recovered?

A by-product is a material recovered alongside the main product in an operation. The host provides the feedstock or residue used to recover the smaller stream. Recovery can therefore depend on host production, the mineral content of that feed, the process used and the availability of equipment for separation. The location of recovery can be a processing facility outside the country where the host ore was mined.

AMR count of IEA recovery routes by stage: mining 1, smelting 1, refining 14, total 16.
Figure 1: The 14 refining entries cover all five hosts in the selected source tables. Source: IEA 2026 Annex, Roots of by-products, pp. 367–368. Chart drawn by American Mineral Registry from the source figures, checked 25 Nov 2026.
View chart data

Counts from two IEA annex pages. Each host by-product pair is one row.

Refining is the recovery point in 14 of 16 routes
IEA recovery stageRoutes
Mining1
Smelting1
Refining14

Values and definitions are also readable in HTML. Source precision and scope apply.

IEA 2026 Annex, Roots of by-products, pp. 367–368 Original primary evidence

Download this figure (SVG)

Recovery route counts
Recovery stageRoute countShare of selected routes (%)
Mining16.25
Smelting16.25
Refining1487.50

IEA Annex, p. 367 · IEA Annex, p. 368 · Download matching CSV

Copper accounts for seven listed routes. Two occur before refining: molybdenum separated during beneficiation at the mine stage and rhenium recovered during roasting at the smelting stage. Copper’s other five entries occur at refining. The other nine entries in the two-page selection are all assigned to refining. Refining here identifies the stage where the producer places the route.

Byproduct recovery routes
Host productBy-productRecovery stageProcess or streamTheoretical tonnesOriginal feed basis
CopperMolybdenumMiningFlotation during beneficiation10–1,0001 million tonnes of ore
CopperRheniumSmeltingRoasting0.1–0.61 million tonnes of ore
CopperGoldRefiningElectrorefining anode residues0.1–11 million tonnes of ore
CopperSilverRefiningElectrorefining anode residues0.1–201 million tonnes of ore
CopperSeleniumRefiningElectrorefining anode residues501 thousand tonnes of anode slime
CopperTelluriumRefiningElectrorefining anode residues201 thousand tonnes of anode slime
CopperCobaltRefiningAcid leach solutions in hydrometallurgy100–5,0001 million tonnes of ore
ZincIndiumRefiningLeach residues and solvent extraction40–2701 million tonnes of concentrate
ZincGermaniumRefiningRoast-leach-electrowinning301 million tonnes of ore
ZincGalliumRefiningLeach residues and solvent extraction10–5001 million tonnes of ore
LeadSilverRefiningHydrometallurgy during lead refining5001 million tonnes of concentrate
LeadBismuthRefiningRoasting dross and reductionAbout 2001 million tonnes of concentrate
LeadAntimonyRefiningRoasting dross and reduction4,0001 million tonnes of concentrate
NickelCobaltRefiningPrecipitation and electrolytic refining1,000–2,0001 million tonnes of ore
NickelPlatinum group metalsRefiningAnode residues (annex specifies copper electrolytic refining)About 9 palladium and 2 platinum1 million tonnes of ore
AluminiumGalliumRefiningSolvent extraction and electrowinning10–1001 million tonnes of ore

IEA Annex, p. 367 · IEA Annex, p. 368 · Download matching CSV

Some by-products can be recovered from more than one host, even within this small published selection. It takes a second source to establish which route dominates actual output. For instance, the IEA lists both zinc and aluminium routes for gallium. USGS describes bauxite processing as the predominant primary route in the world and also identifies zinc ores as a source. A supply discussion can therefore lead with bauxite and still account for the zinc route in a separate row. (USGS Gallium, p. 1, Feb 2026)

Minerals with multiple hosts
By-productHosts shownSource feed basisInterpretation
SilverCopper and leadCopper ore and lead concentrateThe IEA entries use different feed materials
CobaltCopper and nickelCopper ore and nickel oreYield ranges are indicative and ore-specific
GalliumZinc and aluminiumZinc ore and aluminium host oreUSGS says bauxite processing is the dominant global primary route

IEA Annex, p. 367 · IEA Annex, p. 368 · USGS Gallium · Download matching CSV

Why do the theoretical yields have different denominators?

An ore measure uses the mass of mined material in the stated feed. A concentrate is a processed stream, usually upstream of smelting or refining. Anode slime is a residue from electrolytic refining. The IEA gives quantities for those different inputs, so each yield travels with its feedstock description.

Three IEA route examples. Copper anode residues yield tellurium. Zinc leach residues are a source of indium. An aluminium route recovers gallium by solvent extraction and electrowinning.
Figure 2: Host throughput and the facility’s recovery stream are separate inputs to supply analysis. Source: IEA Annex host and recovery process examples, pp. 367–368. Chart drawn by American Mineral Registry from the source figures, checked 25 Nov 2026.
View chart data

Three selected host, recovery stream and by-product relationships.

The host and recovered product are separate
HostRecovery streamBy-product
CopperElectrorefining anode residuesTellurium
ZincLeach residuesIndium
AluminiumSolvent extraction and electrowinningGallium

Values and definitions are also readable in HTML. Source precision and scope apply.

IEA Annex host and recovery process examples, pp. 367–368 Original primary evidence

Download this figure (SVG)

For example, the IEA’s 20 tonnes of tellurium per 1,000 tonnes of copper anode slime is a 2% ratio on that residue. Its 30 tonnes of germanium per million tonnes of zinc ore equals 30 grams per metric ton of ore, or 0.003%. The second conversion is useful for interpreting the zinc row. A conversion to the same mass unit still leaves different material streams in the denominator. The feed has already been concentrated by processing in one example. In the other, the denominator starts at ore.

The aluminium route in the IEA table gives an indicative gallium range of 10 to 100 tonnes per million tonnes of ore. The zinc route gives 10 to 500 on its own ore basis. Those published ranges are theoretical and depend on the indicative grades reported by the IEA. To estimate output for a real project, establish throughput at the relevant stage, the by-product grade of that feed, recovery efficiency and when the recovery equipment actually operates. A deposit’s contained metal can be much higher than the metal recovered and sold.

What do the U.S. import data say about recovery and refining?

Four USGS chapters illustrate how domestic processing and import dependence can coexist. U.S. gallium and indium net import reliance were both 100% in the 2025 figures, with different consumption definitions. Germanium was reported at more than 50% and tellurium at more than 25%. USGS publishes these two results as lower bounds. The ordering of the bounds alone does not establish the ordering of actual reliance.

USGS 2025 reliance: gallium 100 percent of reported use, germanium more than 50 percent of estimated use, indium 100 percent of estimated use, tellurium more than 25 percent of apparent use.
Figure 3: Each row keeps the source’s exact threshold or ratio and the corresponding consumption measure. Source: USGS 2026 Tellurium, p. 1, and related commodity chapters. Chart drawn by American Mineral Registry from the source figures, checked 25 Nov 2026.
View chart data

Four 2025 USGS figures. Each line preserves the original qualifier and denominator.

Domestic processing can occur alongside import reliance
MaterialUSGS estimateConsumption basis
Gallium100%Reported consumption
Germanium>50%Estimated consumption
Indium100%Estimated consumption
Tellurium>25%Apparent consumption

Values and definitions are also readable in HTML. Source precision and scope apply.

USGS 2026 Tellurium, p. 1, and related commodity chapters Original primary evidence

Download this figure (SVG)

US import reliance 2025
MaterialUSGS net import reliance in 2025Published denominatorDomestic stage distinction
Gallium100%Reported consumptionNo U.S. primary recovery. High-purity material recovered and refined from imported feed and new scrap.
Germanium>50%Estimated consumptionSome germanium-bearing zinc concentrate was produced domestically. No U.S. primary refinery production is reported.
Indium100%Estimated consumptionNo U.S. recovery from ores in 2025. Products made with imported indium metal.
Tellurium>25%Apparent consumptionTwo U.S. facilities produced copper telluride and exported it for further processing.

USGS Gallium · USGS Germanium · USGS Indium · USGS Tellurium · Download matching CSV

Gallium. USGS reports no domestic primary recovery since 1987, while a U.S. facility recovered and refined high-purity gallium from imported low-purity material and new scrap. Its 2025 import estimates show 25,000 kilograms of gallium metal, measured as gallium content. The chapter’s gallium arsenide wafer trade series is measured in gross weight, so keep it in a separate product-form comparison. (USGS Gallium, p. 1, Feb 2026)

Germanium. USGS describes germanium-bearing zinc concentrates from Alaska and reports that some went to Canada. Its 2025 U.S. imports include 7,000 kilograms of germanium in metal and 17,000 kilograms of germanium in dioxide. Those categories are separate from the domestic extraction of germanium-bearing material. The chapter reports more than 50% reliance and leaves several underlying quantities unavailable. (USGS Germanium, p. 1, Feb 2026)

Indium. No domestic indium was recovered from ore in 2025 according to USGS. It estimates both refined indium imports and consumption at 220 metric tons, with the consumption estimate based on imports. U.S. companies still made alloys, compounds and other indium products from imported metal. (USGS Indium, p. 1, Feb 2026)

Tellurium. The two U.S. facilities produced copper telluride from anode slimes. USGS identifies Texas and Utah as their locations and reports that both exported the intermediate for further processing. Certain U.S. downstream operations processed imported tellurium. The reported import quantity was 14 metric tons and the reliance figure was more than 25%. The chapter withholds domestic production and apparent consumption to protect company-level information. The published threshold is the relevant citation. (USGS Tellurium, p. 1, Feb 2026)

Selected US import forms
Mineral2025 import lineUSGS estimateUnit
GalliumMetal, gallium content25,000kg
GermaniumMetal, germanium content7,000kg
GermaniumDioxide, germanium content17,000kg
IndiumRefined indium220metric tonnes
TelluriumTellurium imports for consumption14metric tonnes

USGS Gallium · USGS Germanium · USGS Indium · USGS Tellurium · Download matching CSV

How to cite a by-product statistic

State the host, recovery stage and feed basis together. Describe actual output, theoretical recovery and import reliance as separate measures. If discussing the potential of domestic production, check for facilities that perform the separation, for intermediate exports and for the form bought by final users. A country can appear in a copper or zinc mine ranking without entering the refined by-product table. For broader stage concentration see AMR’s mining and refining comparison.

How much by-product might a given feed contain, and what can actually be recovered?

A theoretical yield quoted per million tonnes of ore can appear smaller than one quoted per thousand tonnes of process residue simply because the denominator is different. Converting every entry to grams per metric tonne of its own feed basis is the first step in a defensible process comparison. In the IEA annex, the copper anode-slime example gives 20 tonnes of tellurium per thousand tonnes of slime, equivalent to 20,000 grams per tonne of that residue. Its 50-tonne selenium example is equivalent to 50,000 grams per tonne of the same specified feed. These are not grades of the ore originally mined.

Scroll the full table to compare columns and rows. The complete data are also available as a CSV.

Normalized feed-specific theoretical content or recovery quantity
HostBy-productStageFeed materialSource tonnesSource feed quantityLower equivalent g/t feedUpper equivalent g/t feedQuantity type
CopperMolybdenumMiningOre10–1,0001 million tonnes of ore10.001000.00Source range
CopperRheniumSmeltingOre0.1–0.61 million tonnes of ore0.100.60Source range
CopperGoldRefiningOre0.1–11 million tonnes of ore0.101.00Source range
CopperSilverRefiningOre0.1–201 million tonnes of ore0.1020.00Source range
CopperSeleniumRefiningAnode slime501 thousand tonnes of anode slime50000.0050000.00Source point quantity
CopperTelluriumRefiningAnode slime201 thousand tonnes of anode slime20000.0020000.00Source point quantity
CopperCobaltRefiningOre100–5,0001 million tonnes of ore100.005000.00Source range
ZincIndiumRefiningConcentrate40–2701 million tonnes of concentrate40.00270.00Source range
ZincGermaniumRefiningOre301 million tonnes of ore30.0030.00Source point quantity
ZincGalliumRefiningOre10–5001 million tonnes of ore10.00500.00Source range
LeadSilverRefiningConcentrate5001 million tonnes of concentrate500.00500.00Source point quantity
LeadBismuthRefiningConcentrateAbout 2001 million tonnes of concentrate200.00200.00Approximate source quantity
LeadAntimonyRefiningConcentrate4,0001 million tonnes of concentrate4000.004000.00Source point quantity
NickelCobaltRefiningOre1,000–2,0001 million tonnes of ore1000.002000.00Source range
NickelPalladiumRefiningOreAbout 91 million tonnes of ore9.009.00Approximate source quantity
NickelPlatinumRefiningOreAbout 21 million tonnes of ore2.002.00Approximate source quantity
AluminiumGalliumRefiningOre10–1001 million tonnes of ore10.00100.00Source range

IEA Critical Minerals Outlook 2026, p. 367 · IEA Critical Minerals Outlook 2026, p. 368 · Download matching CSV

Original IEA Annex pp. 367–368 feed bases. One tonne per million tonnes equals 1 g/t; one tonne per thousand tonnes equals 1,000 g/t. No common feed mix or realised recovery assumed.

In this compilation one metric tonne of product per million metric tonnes of feed equals one gram per tonne. Multiplying the source's quantity by 1,000 converts tonnes per thousand tonnes to the same dimensional unit. A single-source quantity is retained as a point value; a source range is preserved as a lower and upper value rather than collapsed to an average. Palladium and platinum quantities are displayed separately because they are different metals. The original annex’s nickel host heading and copper-electrorefining wording are retained in the earlier route table; the wording does not establish an independently verified nickel-refinery flow. IEA Annex, copper routes and other host routes.

For a mine-level assessment a useful conceptual sequence is ore throughput, grade of the target element, fraction reporting to a recoverable stream, stream collection and refinery yield. Each term needs to represent the same boundary and period. If the data start at an anode-slime refinery feed, the early terms are not available and should not be invented by treating residue mass as mine throughput. No realistic plant can be sized solely from the theoretical entries: plant operating characteristics, ore mineralogy, product grade, environmental constraints, collection and purification losses all influence actual output.

Are import trends the same for refined metals and downstream products?

Trade in gallium metal is not the same series as trade in gallium arsenide wafers. USGS estimates that the United States imported 25,000 kg of gallium metal in 2025, up from 8,890 kg in 2021. For GaAs wafers the source gives 110,000 kg of gross wafer mass in 2025 versus 306,000 kg in 2021. Metal imports rose by approximately 181.21%, while gross wafer imports declined by approximately 64.05%. These contrasting changes demonstrate why using the word “gallium imports” without a product form can produce misleading evidence about consumption or supply risk.

Scroll the full table to compare columns and rows. The complete data are also available as a CSV.

Five years of US trade by distinct product form
MineralTrade lineUnit20212022202320242025 estimate2021–25 change (%)
GalliumMetal importskg gallium889011400114001100025000181.21
GalliumGaAs wafer importskg gross wafer mass306000424000163000152000110000-64.05
GermaniumMetal importskg germanium content130001400022000210007000-46.15
GermaniumDioxide importskg germanium content17000150001400011000170000.00
GermaniumMetal exportskg germanium content5500660060009000700027.27
GermaniumDioxide exportskg germanium content4301301109215-96.51
IndiumImports for consumptionmetric tonnes15820221922022039.24
TelluriumImports for consumptionmetric tonnes42378614-66.67
TelluriumExportsmetric tonnes21153350.00

USGS 2026 Gallium, p. 1 · USGS 2026 Germanium, p. 1 · USGS 2026 Indium, p. 1 · USGS 2026 Tellurium, p. 1 · Download matching CSV

USGS 2026 Salient Statistics. Separate forms and units; changes use same line endpoints. Do not combine gross wafer mass with gallium content or describe gross imports as net consumption.

The Germanium chapter reports metal and dioxide imports and exports in germanium-content units, unlike the gross GaAs wafer line. We preserve the source's kilograms and metric tonnes instead of adding products or treating semiconductors as pure metal. Indium's import line is also the basis of the USGS estimated consumption series; it is not a separate survey of manufacturing use. In the tellurium table 2023 exports of 15 tonnes exceed reported imports of eight tonnes, but domestic production, apparent consumption and producer stocks are withheld. Trade alone cannot reveal how much tellurium the country extracted or recovered in a plant that year. USGS Gallium, Germanium, Indium and Tellurium.

Net import reliance history, with original qualifiers
MaterialUSGS denominator2021 (%)2022 (%)2023 (%)2024 (%)2025 estimate (%)
GalliumReported consumption100100100100100
GermaniumEstimated consumption>50>50>50>50>50
IndiumEstimated consumption100100100100100
TelluriumApparent consumption>95>75E (net exporter)<25>25

USGS 2026 Gallium, p. 1 · USGS 2026 Germanium, p. 1 · USGS 2026 Indium, p. 1 · USGS 2026 Tellurium, p. 1 · Download matching CSV

Original USGS net import reliance rows. E is a source code for net exporter; inequalities are not point values.

A 100% net-import-reliance estimate on reported or estimated consumption can coexist with domestic recycling of manufacturing scrap. The reliance percentage is defined by the USGS denominator and trade/production accounting, not a statement that every kilogram encountered by a manufacturer is newly imported ore. A bound such as greater than 50% should remain a bound in a paper or chart. Assigning it 50% or trying to average it with a precise 100% introduces spurious precision.

Why does tellurium illustrate the link between host metal production and energy technology?

The USGS estimate for 2025 attributes 70% of worldwide tellurium consumption to solar cells, 15% to thermoelectric devices, 10% to metallurgy and 5% to other uses. It also attributes 80% of global refined tellurium production to China in the same edition. Unlike a host metal with its own large commodity market, a by-product may depend on a specific residue stream becoming available and on facilities being equipped to recover and purify that element. A material demand scenario for thin-film solar cells is therefore not a direct forecast of copper mine output or of the volume of residues collectible by a particular plant. USGS Tellurium, end uses and world refinery production.

Tellurium end uses in 2025. Percent of estimated global tellurium consumption, not U.S. production.
Figure 4: Percent of estimated global tellurium consumption, not U.S. production. Sources: USGS 2026 Tellurium, p. 1. See the full supporting table below.
View chart data

Percent of estimated global tellurium consumption, not U.S. production.

Tellurium end uses in 2025
ApplicationShare (%)
Solar power cells70.0
Thermoelectric devices15.0
Metallurgy10.0
Other applications5.0

Figures retain the source units and definitions.

USGS 2026 Tellurium, p. 1

Download chart data · Download chart SVG

2025 estimated worldwide tellurium consumption by use
ApplicationShare (%)
Solar power cells70
Thermoelectric devices15
Metallurgy10
Other applications5

USGS 2026 Tellurium, p. 1 · Download matching CSV

USGS 2026 estimate of end uses in global consumption; not allocation of United States mine output.

How much of reported by-product processing capacity is represented by annual output?

Worldwide low-purity primary gallium, indium refinery and tellurium refinery production have separate USGS tables. They also give nominal production or refining capacity for many named locations. Dividing each country's output by its reported capacity gives a useful screening ratio with the same source unit and stage. China’s primary low-purity gallium output is estimated at 900,000 kg in 2025, against 1,600,000 kg of reported capacity, or 56.25%. USGS separately estimates China at 99% of global primary low-purity production. The rounded world aggregate is also 900,000 kg, so dividing those rounded headline values would instead produce an apparent 100%; cite the published 99% concentration estimate rather than that artefact.

2025 named producer output and reported capacity
Material and reported stageNamed locationSource unit2025 production estimate2025 capacityOutput / capacity (%)
Gallium low-purity primaryChinakg900000160000056.25
Gallium low-purity primaryJapankg30001000030.00
Gallium low-purity primaryRussiakg60001000060.00
Indium refineryBelgiumt195038.00
Indium refineryCanadat407057.14
Indium refineryChinat760110069.09
Indium refineryFrancet217030.00
Indium refineryJapant657092.86
Indium refineryRepublic of Koreat18031058.06
Indium refineryRussiat51533.33
Tellurium refineryBulgariat1520.00
Tellurium refineryCanadat283093.33
Tellurium refineryChinat800100080.00
Tellurium refineryJapant617581.33
Tellurium refineryRussiat678083.75
Tellurium refinerySouth Africat51050.00
Tellurium refinerySweden (concentrate)t485096.00
Tellurium refineryUzbekistant185036.00

USGS 2026 Gallium, p. 2 · USGS 2026 Indium, p. 2 · USGS 2026 Tellurium, p. 2 · Download matching CSV

USGS 2026 world tables; named rows with positive numeric output and capacity. Not plant-level utilisation. Gallium source figures rounded and China share separately reported as 99%. Indium Uzbekistan has 1 t without capacity. Tellurium US data withheld and Other countries unreported; Sweden is concentrate. Germanium lacks quantitative global country table.

The ratio is not measured plant utilisation. Nameplate capacity and actual output can refer to different operating schedules or a changing facility portfolio, and expansion may become available only late in a year. Spare nominal capacity may not be capable of producing the required specification or be available to a particular buyer. Germanium has no comparable complete country table in the USGS chapter, and indium's Uzbekistan row lacks a capacity value. Tellurium US output is withheld and Sweden is specified as concentrate. The comparison therefore only includes named rows with both numeric figures, rather than treating missing values as zero or claiming a complete market utilisation rate. USGS Gallium, Indium and Tellurium.

How should an analyst evaluate whether by-product supply can respond to demand?

Separate the host-metal market from the potential by-product market. Production may respond to host demand or existing capacity while improved collection, additional processing capacity, higher recovery or recycling changes by-product availability. An increase in by-product price is not by itself proof that a host mine will expand; nor does a doubling of host output imply doubled by-product supply when ore composition or plant recovery changes. Conversely, adding recovery to a previously unrecovered process stream may increase supply with little change in mined tonnes.

The correct research sequence is to identify the route, identify the original feed basis, then request compatible measurements of feed tonnage, content and recovery. For an economic analysis also identify by-product revenue credits, treatment charges and ownership of the intermediate stream rather than presuming all product belongs to the original mine operator. For country-risk analysis use refined output and trade in the precise form needed, not only geological resources. The mining and refining concentration study separately quantifies how geographic shares differ at different industrial stages.

Methodology and sources

The expanded comparisons retain original source periods and row-level source references. Formulas, scope and precision are documented immediately beside each table, in the downloadable methods and source-cell ledger. Rounded primary values are not treated as exact unrounded observations.

AMR compiled all rows in the IEA’s Roots of by-products tables on page 367 and page 368. The platinum group metals entry is one row with separate indicative palladium and platinum amounts. Its host heading is nickel and its process description names copper electrolytic refining, as printed in the annex. The share by stage divides each count by 16. The same pairing can describe different ore types or feed qualities in a real plant. The four domestic trade examples use the published 2025 estimate columns and the domestic-use descriptions in the four named USGS 2026 chapters. The downloads retain the source units and reliance thresholds.

Glossary

  • Host material: The main ore, product or processing stream associated with recovery of a by-product.
  • Beneficiation: Processing that separates or enriches useful minerals before later stages.
  • Anode slime: A refinery residue formed during electrolytic production that can contain recoverable minor metals.
  • Theoretical yield: An indicative amount on a specified feed basis, before facility-specific recovery is established.
  • Net import reliance: A domestic dependence metric defined in each USGS chapter with its stated consumption basis.
  • Withheld value: A figure whose quantity is suppressed in the published table, such as telluride production in the 2025 U.S. series.

Sources

Cite a specific finding

Copy the exact comparison with its period, scope and original evidence.

Fourteen of 16 routes recover the by-product in refining

AMR counted 14 refining-stage routes, one mining-stage route and one smelting-stage route in the IEA’s 16 listed host-and-by-product pairs.

Each count refers to a selected process row in the IEA annex.

American Mineral Registry. AMR counted 14 refining-stage routes, one mining-stage route and one smelting-stage route in the IEA’s 16 listed host-and-by-product pairs. Each count refers to a selected process row in the IEA annex. https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#iea-byproduct-recovery-stage-count Original evidence: https://www.iea.org/files/19c60aa0-ee07-4a20-a138-33c967ac5008/GlobalCriticalMineralsOutlook2026.pdf#page=367, https://www.iea.org/files/19c60aa0-ee07-4a20-a138-33c967ac5008/GlobalCriticalMineralsOutlook2026.pdf#page=368
HTML attribution<a href="https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#iea-byproduct-recovery-stage-count">American Mineral Registry</a>. AMR counted 14 refining-stage routes, one mining-stage route and one smelting-stage route in the IEA’s 16 listed host-and-by-product pairs. Each count refers to a selected process row in the IEA annex. Original evidence: <a href="https://www.iea.org/files/19c60aa0-ee07-4a20-a138-33c967ac5008/GlobalCriticalMineralsOutlook2026.pdf#page=367">IEA Annex, p. 367</a> · <a href="https://www.iea.org/files/19c60aa0-ee07-4a20-a138-33c967ac5008/GlobalCriticalMineralsOutlook2026.pdf#page=368">IEA Annex, p. 368</a>.

Supporting table · Permanent finding link · Matching CSV · IEA Annex, p. 367 · IEA Annex, p. 368

The IEA’s theoretical yield depends on the feed material

The IEA gives theoretical tellurium output of 20 tonnes per 1,000 tonnes of copper anode slime and germanium output of 30 tonnes per million tonnes of zinc ore.

The quantities use different feeds and scales. Theoretical recovery does not measure actual output.

American Mineral Registry. The IEA gives theoretical tellurium output of 20 tonnes per 1,000 tonnes of copper anode slime and germanium output of 30 tonnes per million tonnes of zinc ore. The quantities use different feeds and scales. Theoretical recovery does not measure actual output. https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#byproduct-feed-basis Original evidence: https://www.iea.org/files/19c60aa0-ee07-4a20-a138-33c967ac5008/GlobalCriticalMineralsOutlook2026.pdf#page=367, https://www.iea.org/files/19c60aa0-ee07-4a20-a138-33c967ac5008/GlobalCriticalMineralsOutlook2026.pdf#page=368
HTML attribution<a href="https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#byproduct-feed-basis">American Mineral Registry</a>. The IEA gives theoretical tellurium output of 20 tonnes per 1,000 tonnes of copper anode slime and germanium output of 30 tonnes per million tonnes of zinc ore. The quantities use different feeds and scales. Theoretical recovery does not measure actual output. Original evidence: <a href="https://www.iea.org/files/19c60aa0-ee07-4a20-a138-33c967ac5008/GlobalCriticalMineralsOutlook2026.pdf#page=367">IEA Annex, p. 367</a> · <a href="https://www.iea.org/files/19c60aa0-ee07-4a20-a138-33c967ac5008/GlobalCriticalMineralsOutlook2026.pdf#page=368">IEA Annex, p. 368</a>.

Supporting table · Permanent finding link · Matching CSV · IEA Annex, p. 367 · IEA Annex, p. 368

U.S. telluride production and refined supply are separate stages

The USGS reports that two U.S. copper refineries produced and exported copper telluride in 2025. It estimates tellurium net import reliance at more than 25% of apparent consumption.

The chapter separately reports downstream processing of imported tellurium and withholds domestic telluride production tonnage.

American Mineral Registry. The USGS reports that two U.S. copper refineries produced and exported copper telluride in 2025. It estimates tellurium net import reliance at more than 25% of apparent consumption. The chapter separately reports downstream processing of imported tellurium and withholds domestic telluride production tonnage. https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#tellurium-intermediate-and-import-reliance Original evidence: https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-tellurium.pdf#page=1
HTML attribution<a href="https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#tellurium-intermediate-and-import-reliance">American Mineral Registry</a>. The USGS reports that two U.S. copper refineries produced and exported copper telluride in 2025. It estimates tellurium net import reliance at more than 25% of apparent consumption. The chapter separately reports downstream processing of imported tellurium and withholds domestic telluride production tonnage. Original evidence: <a href="https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-tellurium.pdf#page=1">USGS Tellurium</a>.

Supporting table · Permanent finding link · Matching CSV · USGS Tellurium

Theoretical tellurium quantity is on an anode-slime basis

IEA reports 20 tonnes of tellurium per 1,000 tonnes of anode slime, equivalent to 20,000 g/t of that residue. This is not a copper-ore grade or a plant recovery rate.

Original Annex theoretical feed basis; AMR unit conversion.

American Mineral Registry. IEA reports 20 tonnes of tellurium per 1,000 tonnes of anode slime, equivalent to 20,000 g/t of that residue. This is not a copper-ore grade or a plant recovery rate. Original Annex theoretical feed basis; AMR unit conversion. https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#tellurium-slime-basis Original evidence: https://www.iea.org/files/19c60aa0-ee07-4a20-a138-33c967ac5008/GlobalCriticalMineralsOutlook2026.pdf#page=367
HTML attribution<a href="https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#tellurium-slime-basis">American Mineral Registry</a>. IEA reports 20 tonnes of tellurium per 1,000 tonnes of anode slime, equivalent to 20,000 g/t of that residue. This is not a copper-ore grade or a plant recovery rate. Original Annex theoretical feed basis; AMR unit conversion. Original evidence: <a href="https://www.iea.org/files/19c60aa0-ee07-4a20-a138-33c967ac5008/GlobalCriticalMineralsOutlook2026.pdf#page=367">IEA Critical Minerals Outlook 2026, p. 367</a>.

Supporting table · Permanent finding link · Matching CSV · IEA Critical Minerals Outlook 2026, p. 367

Two gallium import series moved in opposite directions

US gallium metal imports increased from 8,890 kg in 2021 to an estimated 25,000 kg in 2025 (+181.21%), while gross GaAs wafer imports fell from 306,000 kg to 110,000 kg (−64.05%).

Different products and mass bases; USGS 2026 historical estimates.

American Mineral Registry. US gallium metal imports increased from 8,890 kg in 2021 to an estimated 25,000 kg in 2025 (+181.21%), while gross GaAs wafer imports fell from 306,000 kg to 110,000 kg (−64.05%). Different products and mass bases; USGS 2026 historical estimates. https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#gallium-import-form-divergence Original evidence: https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-gallium.pdf#page=1
HTML attribution<a href="https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#gallium-import-form-divergence">American Mineral Registry</a>. US gallium metal imports increased from 8,890 kg in 2021 to an estimated 25,000 kg in 2025 (+181.21%), while gross GaAs wafer imports fell from 306,000 kg to 110,000 kg (−64.05%). Different products and mass bases; USGS 2026 historical estimates. Original evidence: <a href="https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-gallium.pdf#page=1">USGS 2026 Gallium, p. 1</a>.

Supporting table · Permanent finding link · Matching CSV · USGS 2026 Gallium, p. 1

Reported by-product material output can fall below stated capacity

USGS estimates China’s 2025 primary low-purity gallium output at 900,000 kg and capacity at 1,600,000 kg, giving a 56.25% output-to-capacity ratio from the rounded figures.

Separate from plant utilisation or the source’s 99% world production share; specific primary material stage.

American Mineral Registry. USGS estimates China’s 2025 primary low-purity gallium output at 900,000 kg and capacity at 1,600,000 kg, giving a 56.25% output-to-capacity ratio from the rounded figures. Separate from plant utilisation or the source’s 99% world production share; specific primary material stage. https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#gallium-indium-tellurium-capacity Original evidence: https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-gallium.pdf#page=2
HTML attribution<a href="https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics#gallium-indium-tellurium-capacity">American Mineral Registry</a>. USGS estimates China’s 2025 primary low-purity gallium output at 900,000 kg and capacity at 1,600,000 kg, giving a 56.25% output-to-capacity ratio from the rounded figures. Separate from plant utilisation or the source’s 99% world production share; specific primary material stage. Original evidence: <a href="https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-gallium.pdf#page=2">USGS 2026 Gallium, p. 2</a>.

Supporting table · Permanent finding link · Matching CSV · USGS 2026 Gallium, p. 2

Data and downloads

No account or form is required. CSV tables preserve the article’s units, evidence periods and source estimates.

Byproduct recovery routes (CSV)

Minerals with multiple hosts (CSV)

Recovery route counts (CSV)

Selected us import forms (CSV)

Us import reliance 2025 (CSV)

Expanded research datasets

Normalized feed-specific theoretical content or recovery quantity (CSV)

Five years of US trade by distinct product form (CSV)

Net import reliance history, with original qualifiers (CSV)

2025 estimated worldwide tellurium consumption by use (CSV)

2025 named producer output and reported capacity (CSV)

Cite this page

Retain the original producer, observation or projection year, and scope when citing any figure.

American Mineral Registry. "By-Product Mineral Statistics: Where Critical Minerals Are Recovered." American Mineral Registry, November 2026. https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics/
<a href="https://americanmineralregistry.com/research/byproduct-critical-mineral-recovery-statistics/">By-Product Mineral Statistics</a> (American Mineral Registry, November 2026)