Key Takeaways
- Lithium had the largest mining-to-processing difference in the 2025 estimates, at 20 percentage points. Its upstream measure includes lithium derived from hard-rock ore, clays and brines. (IEA lithium supply, p. 351 (accessed), Nov 2026)
- Graphite was the most concentrated at the processing stage, at 99% for the three largest locations. The series covers battery-grade natural and synthetic supply. (IEA graphite supply, p. 360 (accessed), Nov 2026)
- Lithium extraction diversified while nickel mining concentrated. Top-three shares fell 14 points for lithium raw materials and rose 14 points for nickel mining between the 2021 and 2025 estimates. (IEA lithium and nickel supply, pp. 351 and 354 (accessed), Nov 2026)
- The 2040 base case still shows wider processing concentration for five of the six pairs. Nickel’s modeled shares are 84% mining and 82% refining. (IEA nickel supply, p. 354 (accessed), Nov 2026)
Where did lithium mining diversify faster than lithium chemicals?
In 2025, locations outside the three leading countries accounted for 25.00% of lithium mining and 5.00% of lithium refining in the IEA tables. The outside-group share gained 10.00 percentage points more in mining than in refining between 2021 and 2025. (International Energy Agency, Global Critical Minerals Outlook 2026, lithium annex, Nov 2026).
| Calculated comparison | Result | Calculation |
|---|---|---|
| 2025 mining share outside top three | 25.00% | 100 − B |
| 2025 refining share outside top three | 5.00% | 100 − D |
| Difference in outside-group share gains, mining less refining | 10.00 percentage points | (A − B) − (C − D) |
The top three group is ranked separately for each stage and year. Its complement measures all locations outside the top three for that stage and year. A share gain outside that group does not measure the same countries every year or give the tonnes of capacity that are spare.
How to use this comparison
If a supply contract requires a chemical, treat mine diversification as one input. Verify the qualification and origin of the chemical conversion stage before using an upstream concentration statistic. Related evidence on Lithium Supply Statistics: Mining, Trade and Refining.
Reproduce the numbers
Each letter in the calculation maps to a source value below. Calculate from the displayed source values and round the result only at the end. The download records the source file, row, field and formula.
| Input | What is measured | Source value | Exact source row and field |
|---|---|---|---|
| A | 2021 mining top three | 89 | Lithium · 2021 extraction (%) |
| B | 2025 mining top three | 75 | Lithium · 2025 extraction (%) |
| C | 2021 refining top three | 99 | Lithium · 2021 refining (%) |
| D | 2025 refining top three | 95 | Lithium · 2025 refining (%) |
Download the calculation and source rows (CSV)
Cite this comparison
In 2025, locations outside the three leading countries accounted for 25.00% of lithium mining and 5.00% of lithium refining in the IEA tables. The outside-group share gained 10.00 percentage points more in mining than in refining between 2021 and 2025. American Mineral Registry calculation from International Energy Agency, Global Critical Minerals Outlook 2026, lithium annex. IEA historical estimates for 2021 and 2025, top three country shares. https://americanmineralregistry.com/research/critical-mineral-mining-refining-concentration-statistics#amr-reader-analysis
HTML attribution
<a href="https://americanmineralregistry.com/research/critical-mineral-mining-refining-concentration-statistics#amr-reader-analysis">Where did lithium mining diversify faster than lithium chemicals?</a>
How concentrated is mineral supply at each stage?
Top-three concentration is the combined share of the three leading producing locations. The same measure can be applied at a mine, chemical or refining boundary. Since rankings and capacity change with the year, the identity of a location in the top three can change between two columns. A change in the top-three share tells you how much production the leading group accounted for. A country-specific question calls for the underlying country rows.
View chart data
IEA 2025 historical estimates; three largest producing locations, percent of each stage.
| Mineral | Mining or extraction (%) | Refining or chemicals (%) |
|---|---|---|
| Copper | 50 | 62 |
| Lithium | 75 | 95 |
| Nickel | 79 | 80 |
| Cobalt | 83 | 87 |
| Graphite | 88 | 99 |
| Magnet rare earths | 85 | 94 |
Values and definitions are also readable in HTML. Source precision and scope apply.
IEA 2026 Annex, six mineral supply tables Original primary evidence
The 2025 copper pair is 50% mining and 62% refining, the lowest shares in both stages among the six series. Copper still gains 12 percentage points between those stages. Graphite mining is already highly concentrated at 88%. Battery-grade supply is more concentrated at 99%. In the IEA copper definitions, the location of refined output and the location of mined metal describe different activity. The same distinction matters when a researcher moves from graphite extraction to anode inputs. (IEA copper and graphite tables, pp. 348 and 360 (accessed), Nov 2026)
What counts as extraction and processing?
For lithium, raw materials cover hard-rock ore, clay and brine routes. The downstream column covers production of lithium chemicals. New projects can add extraction without opening a chemical conversion plant in the same place. The 20-point difference is a comparison of production concentration. To establish that a specific mine feeds a specific refinery, use trade and company records that identify the material, process and parties.
The IEA’s nickel refining boundary includes final forms such as metal, oxide, nickel pig iron, ferronickel and sulphate. It excludes intermediate outputs. Its 2025 world mine and refine totals are 4,207 kt Ni and 3,729 kt Ni. The top-three shares, 79% and 80%, use their respective totals. A battery supply study may need a narrower sulphate or chemical definition, with its own denominator. (IEA nickel supply, p. 354 (accessed), Nov 2026)
The IEA’s extraction series for graphite is natural graphite mining. The downstream series includes both spherical graphite from natural flake and synthetic anode output. The difference therefore is between two commercially relevant stages with a documented product-scope change. It is useful for locating production concentration in the anode supply chain. A natural-graphite mass balance would require the natural-only downstream volumes. In the rare-earth rows, the IEA covers neodymium, praseodymium, dysprosium and terbium, the four magnet elements in this model. (IEA graphite supply, p. 360 (accessed), Nov 2026) (magnet rare earth supply, p. 363 (accessed), Nov 2026)
| Mineral | Upstream boundary | Downstream boundary | Original IEA table |
|---|---|---|---|
| Copper | Mining | Refining | Annex p. 348 |
| Lithium | Raw materials | Lithium chemicals | Annex p. 351 |
| Nickel | Mining | Broad final refining | Annex p. 354 |
| Cobalt | Mining | Refining | Annex p. 357 |
| Graphite | Natural graphite mining | Refined battery-grade graphite | Annex p. 360 |
| Magnet rare earths | Mining four magnet rare earths | Refining four magnet rare earths | Annex p. 363 |
IEA Annex, p. 348 · IEA Annex, p. 351 · IEA Annex, p. 354 · IEA Annex, p. 357 · IEA Annex, p. 360 · IEA Annex, p. 363 · Download matching CSV
How did the balance change from 2021 to 2025?
The two largest upstream moves in this six-mineral comparison were lithium and nickel, both at 14 percentage points in opposite directions. Lithium’s top-three extraction share fell from 89% to 75%, while nickel mining rose from 65% to 79%. Nickel’s top-three refining share also rose 14 points, from 66% to 80%. The nickel stage difference stayed at one point across the two dates even as both stages became more concentrated. (IEA lithium and nickel supply, pp. 351 and 354 (accessed), Nov 2026)
View chart data
Share of the top three locations; IEA historical estimates.
| Stage | 2021 share (%) | 2025 share (%) |
|---|---|---|
| Raw materials | 89 | 75 |
| Lithium chemicals | 99 | 95 |
Values and definitions are also readable in HTML. Source precision and scope apply.
| Mineral | 2021 extraction (%) | 2025 extraction (%) | Extraction change (pp) | 2021 refining (%) | 2025 refining (%) | Refining change (pp) |
|---|---|---|---|---|---|---|
| Copper | 46 | 50 | 4 | 57 | 62 | 5 |
| Lithium | 89 | 75 | -14 | 99 | 95 | -4 |
| Nickel | 65 | 79 | 14 | 66 | 80 | 14 |
| Cobalt | 73 | 83 | 10 | 85 | 87 | 2 |
| Graphite | 90 | 88 | -2 | 100 | 99 | -1 |
| Magnet rare earths | 81 | 85 | 4 | 97 | 94 | -3 |
IEA Annex, p. 348 · IEA Annex, p. 351 · IEA Annex, p. 354 · IEA Annex, p. 357 · IEA Annex, p. 360 · IEA Annex, p. 363 · Download matching CSV
The lithium stage gap widened from 10 to 20 points even though both shares fell. Cobalt shows the opposite behavior: the stage gap narrowed from 12 to 4 points as mining concentration rose faster than refining concentration. Those two examples make the stage gap easier to interpret. A bigger gap can arise from upstream diversification, and a smaller gap can arise from greater upstream concentration. For a short brief, cite both levels as well as their difference. (IEA lithium and cobalt supply, pp. 351 and 357 (accessed), Nov 2026)
What does the six-mineral average measure?
AMR gives each mineral one equal vote. The 2025 mining and refining means are 76.67% and 86.17%, a 9.50-point difference. In 2021 the comparable means were 74.00% and 84.00%, a 10.00-point gap. Average mining concentration rose more than average refining concentration over these endpoints. A tonnage-weighted average would emphasize high-volume commodities and combine unlike product measures. This equal-weight mean is a summary of six concentration ratios.
| Year | Evidence type | Minerals counted | Mean upstream share (%) | Mean downstream share (%) | Mean stage gap (pp) |
|---|---|---|---|---|---|
| 2021 | Historical estimate | 6 | 74.00 | 84.00 | 10.00 |
| 2025 | Historical estimate | 6 | 76.67 | 86.17 | 9.50 |
| 2030 | Base-case projection | 6 | 72.00 | 84.00 | 12.00 |
| 2040 | Base-case projection | 6 | 73.67 | 84.33 | 10.67 |
What does the IEA base case imply for 2030 and 2040?
The future columns are projections based on the 2026 outlook’s base case. The 2040 graphite pair is 81% natural graphite mining and 96% battery-grade refining. Lithium is 68% raw materials and 86% chemicals, and magnet rare earths are 77% mining and 91% refining. Those three forecast pairs still show a double-digit stage difference. Nickel is the exception in 2040, with mining concentration two points above refining. The result is conditional on the projects and boundaries used by the IEA. (IEA Annex supply projections, pp. 348–363 (accessed), Nov 2026)
View chart data
Percent of stage output from the three largest locations. These are 2040 projections.
| Mineral | Mining or extraction (%) | Refining or chemicals (%) |
|---|---|---|
| Copper | 51 | 62 |
| Lithium | 68 | 86 |
| Nickel | 84 | 82 |
| Cobalt | 81 | 89 |
| Graphite | 81 | 96 |
| Magnet rare earths | 77 | 91 |
Values and definitions are also readable in HTML. Source precision and scope apply.
IEA 2026 Annex, base-case supply columns Original primary evidence
For country exposure, move from the global top-three measure to the product form, plant location and trade route that a supplier or importer actually uses. A group share can stay stable while the largest country changes, and a refining location can import its own upstream feed. Import dependence is a separate question that adds domestic output, imports, exports and the applicable consumption denominator. See U.S. critical mineral import dependence for the U.S. measure and AMR’s by-product recovery statistics for the role of refinery streams.
Which country leads each mineral’s extraction and processing?
A top-three concentration ratio answers how much supply originates in a small group, but it does not reveal whether one location dominates that group or whether its members have similar production volumes. The distinction matters to researchers studying diversification, price exposure, industrial policy and the difference between access to a geological deposit and access to a finished industrial input. The country-level IEA annex makes it possible to calculate both measures without treating the location of a mine as the location of a refinery.
For lithium, the largest named extraction location in the 2025 table is Australia, at 104 kt out of 302 kt of worldwide lithium extraction. China is the largest named lithium chemicals producer, at 235 kt out of 319 kt. The first ratio is 34.44%; the second is 73.67%. Indonesia led both nickel stages in the table, but its mining and refining shares are different. Copper is another important example: Chile leads the named mine-output rows and China the refinery rows. These are results from independently reported stage totals, not a traced flow of tonnes from the producing country to the processing country. IEA mineral supply annex, lithium.
View chart data
Shares differ sharply between extraction and downstream processing.
| Mineral | Extraction share (%) | Processing share (%) |
|---|---|---|
| Copper | 23.61 | 46.75 |
| Lithium | 34.44 | 73.67 |
| Nickel | 62.68 | 45.08 |
| Cobalt | 65.62 | 75.63 |
| Graphite | 80.4 | 94.4 |
| Magnet rare earths | 58.75 | 84.27 |
Figures retain the source units and definitions.
IEA Critical Minerals Outlook 2026, p. 348 · IEA Critical Minerals Outlook 2026, p. 351 · IEA Critical Minerals Outlook 2026, p. 354 · IEA Critical Minerals Outlook 2026, p. 357 · IEA Critical Minerals Outlook 2026, p. 360 · IEA Critical Minerals Outlook 2026, p. 363
The leader in the displayed set may change over time without a single mine or refinery physically moving. For example, the lithium base case shows China exceeding Australia’s raw-material output by 2030; the same table still identifies both as material suppliers. Researchers should use the case name and target year rather than call the projected change an observed market-share shift. For every mineral, the displayed largest named location excludes the aggregated rest-of-world row. An aggregate is not a country, and its undisclosed components cannot be ranked independently.
Can diversification grow in tonnes while market share falls?
Yes. A diversification programme can remove a bottleneck in absolute capacity without increasing the proportion of worldwide output supplied outside a leading country. The best illustration in these data is battery-grade graphite. IEA reports China at 638 kt of 683 kt of world supply in 2021, and 2,139 kt of 2,266 kt in 2025. Subtracting China from each world total gives 45 kt and 127 kt of supply elsewhere. The second number is nearly three times the first, yet its share of the global total declined from 6.59% to 5.60%.
Scroll the full table to compare columns and rows. The complete data are also available as a CSV.
| Stage | China 2021 (kt) | World 2021 (kt) | Outside China 2021 (kt) | Outside share 2021 (%) | China 2025 (kt) | World 2025 (kt) | Outside China 2025 (kt) | Outside share 2025 (%) | Outside volume change (%) |
|---|---|---|---|---|---|---|---|---|---|
| Natural graphite mining | 1234 | 1540 | 306 | 19.87 | 1432 | 1781 | 349 | 19.60 | 14.05 |
| Battery-grade graphite | 638 | 683 | 45 | 6.59 | 2139 | 2266 | 127 | 5.60 | 182.22 |
IEA Critical Minerals Outlook 2026, p. 360 · Download matching CSV
Published stage-specific total minus China; 2021 to 2025 growth divided by 2021 complement. Mining and battery-grade boundaries differ.
Natural graphite mining and battery-grade graphite should remain separate. For the former, the 2025 non-China complement is 349 kt; for the latter it is 127 kt. One is measured at the natural mineral extraction boundary and the other at the battery-grade product boundary. The downstream market can include synthetic materials and distinct conversion routes, while feed material, yields, inventory and trade all complicate the relationship. Dividing these complementary figures does not establish the proportion of ore refined outside China or a processing recovery rate. IEA graphite supply table.
How should a researcher measure diversification and supply exposure?
Start with the required material and grade rather than a country's name. A battery material purchaser may need a qualified chemical product; a manufacturer of permanent magnets may need separated magnet rare earths. The rare-earth table here covers neodymium, praseodymium, dysprosium and terbium, not the entire rare-earth group. This distinction prevents the all-rare-earth production statistics published by other sources from being used as denominators for the magnet-specific output in this study. IEA rare-earth annex scope note.
Four different quantities are useful together: named leader share, top-three share, absolute nonleader production and the particular product boundary. A fall in the first or second does not prove that alternative facilities can supply the specification, amount or delivery window a buyer needs. Nonleader tonnes also may be tied to domestic customers or long-term contracts. In a physical supply stress test, current production is only a starting point: a defensible analysis would separately need trade by product form, plant-level utilisation, spare capacity, logistics, certification and actual requirements.
Do not estimate a precise Herfindahl–Hirschman index by treating “Rest of world” as one domestic producer. Squaring an aggregate share counts cross-products between unrelated locations; the precise result depends on a breakdown not published in these tables. Similarly, country production concentration is not facility ownership concentration. These are geographic supply measures, not antitrust measures, and do not establish which entity controls contracts, pricing or exports. For a consistent comparison, retain the original source's full world denominator and disclose the geographic scope and the bounded dataset rather than invent a missing distribution.
Complete country-level production matrix, 2021–2040
The table below retains every published named location and the stated aggregate totals in the six supply tables. Filter by a mineral and stage in the CSV if you are comparing one supply chain. The World row is the reported denominator; “Rest of world” is the original aggregate, not an estimate. The 2021 and 2025 values are historical estimates, while 2030 and 2040 are base-case projections. Small differences between totals and the sum of rounded rows are retained, not repaired by adding artificial country output.
For a reproducible example, select lithium, Chemicals, China and 2025. Divide 235 by the corresponding World row of 319 and multiply by 100. The calculated 73.67% is a share of chemical output, not a share of all lithium reserves or a forecast of exports. The same operation is possible for the other rows. The complete dataset allows a writer to cite specific location-level statistics rather than a single rounded concentration headline. IEA 2026 Annex, supply-table introduction.
Scroll the full table to compare columns and rows. The complete data are also available as a CSV.
| Mineral | Stage | Location or aggregate | Year | Evidence type | Original unit | Output | Reported world output | Share of reported world output (%) |
|---|---|---|---|---|---|---|---|---|
| Copper | Mining | Chile | 2021 | Historical | kt contained Cu | 5672 | 21457 | 26.43 |
| Copper | Mining | Chile | 2025 | Historical | kt contained Cu | 5485 | 23227 | 23.61 |
| Copper | Mining | Chile | 2030 | IEA base case | kt contained Cu | 5369 | 24571 | 21.85 |
| Copper | Mining | Chile | 2040 | IEA base case | kt contained Cu | 4165 | 17183 | 24.24 |
| Copper | Mining | DRC | 2021 | Historical | kt contained Cu | 2019 | 21457 | 9.41 |
| Copper | Mining | DRC | 2025 | Historical | kt contained Cu | 3338 | 23227 | 14.37 |
| Copper | Mining | DRC | 2030 | IEA base case | kt contained Cu | 4212 | 24571 | 17.14 |
| Copper | Mining | DRC | 2040 | IEA base case | kt contained Cu | 2696 | 17183 | 15.69 |
| Copper | Mining | Peru | 2021 | Historical | kt contained Cu | 2284 | 21457 | 10.64 |
| Copper | Mining | Peru | 2025 | Historical | kt contained Cu | 2726 | 23227 | 11.74 |
| Copper | Mining | Peru | 2030 | IEA base case | kt contained Cu | 2712 | 24571 | 11.04 |
| Copper | Mining | Peru | 2040 | IEA base case | kt contained Cu | 1859 | 17183 | 10.82 |
| Copper | Mining | China | 2021 | Historical | kt contained Cu | 1823 | 21457 | 8.50 |
| Copper | Mining | China | 2025 | Historical | kt contained Cu | 1838 | 23227 | 7.91 |
| Copper | Mining | China | 2030 | IEA base case | kt contained Cu | 2040 | 24571 | 8.30 |
| Copper | Mining | China | 2040 | IEA base case | kt contained Cu | 1852 | 17183 | 10.78 |
| Copper | Mining | Russia | 2021 | Historical | kt contained Cu | 867 | 21457 | 4.04 |
| Copper | Mining | Russia | 2025 | Historical | kt contained Cu | 1145 | 23227 | 4.93 |
| Copper | Mining | Russia | 2030 | IEA base case | kt contained Cu | 1244 | 24571 | 5.06 |
| Copper | Mining | Russia | 2040 | IEA base case | kt contained Cu | 1343 | 17183 | 7.82 |
| Copper | Mining | United States | 2021 | Historical | kt contained Cu | 1262 | 21457 | 5.88 |
| Copper | Mining | United States | 2025 | Historical | kt contained Cu | 1101 | 23227 | 4.74 |
| Copper | Mining | United States | 2030 | IEA base case | kt contained Cu | 1196 | 24571 | 4.87 |
| Copper | Mining | United States | 2040 | IEA base case | kt contained Cu | 632 | 17183 | 3.68 |
| Copper | Mining | Rest of world | 2021 | Historical | kt contained Cu | 7530 | 21457 | 35.09 |
| Copper | Mining | Rest of world | 2025 | Historical | kt contained Cu | 7594 | 23227 | 32.69 |
| Copper | Mining | Rest of world | 2030 | IEA base case | kt contained Cu | 7798 | 24571 | 31.74 |
| Copper | Mining | Rest of world | 2040 | IEA base case | kt contained Cu | 4636 | 17183 | 26.98 |
| Copper | Mining | World | 2021 | Historical | kt contained Cu | 21457 | 21457 | 100.00 |
| Copper | Mining | World | 2025 | Historical | kt contained Cu | 23227 | 23227 | 100.00 |
| Copper | Mining | World | 2030 | IEA base case | kt contained Cu | 24571 | 24571 | 100.00 |
| Copper | Mining | World | 2040 | IEA base case | kt contained Cu | 17183 | 17183 | 100.00 |
| Copper | Refining | China | 2021 | Historical | kt contained Cu | 10378 | 24965 | 41.57 |
| Copper | Refining | China | 2025 | Historical | kt contained Cu | 13069 | 27955 | 46.75 |
| Copper | Refining | China | 2030 | IEA base case | kt contained Cu | 17121 | 36383 | 47.06 |
| Copper | Refining | China | 2040 | IEA base case | kt contained Cu | 17221 | 33710 | 51.09 |
| Copper | Refining | DRC | 2021 | Historical | kt contained Cu | 1563 | 24965 | 6.26 |
| Copper | Refining | DRC | 2025 | Historical | kt contained Cu | 2659 | 27955 | 9.51 |
| Copper | Refining | DRC | 2030 | IEA base case | kt contained Cu | 3278 | 36383 | 9.01 |
| Copper | Refining | DRC | 2040 | IEA base case | kt contained Cu | 1979 | 33710 | 5.87 |
| Copper | Refining | Chile | 2021 | Historical | kt contained Cu | 2282 | 24965 | 9.14 |
| Copper | Refining | Chile | 2025 | Historical | kt contained Cu | 1741 | 27955 | 6.23 |
| Copper | Refining | Chile | 2030 | IEA base case | kt contained Cu | 1846 | 36383 | 5.07 |
| Copper | Refining | Chile | 2040 | IEA base case | kt contained Cu | 1359 | 33710 | 4.03 |
| Copper | Refining | Japan | 2021 | Historical | kt contained Cu | 1514 | 24965 | 6.06 |
| Copper | Refining | Japan | 2025 | Historical | kt contained Cu | 1431 | 27955 | 5.12 |
| Copper | Refining | Japan | 2030 | IEA base case | kt contained Cu | 1624 | 36383 | 4.46 |
| Copper | Refining | Japan | 2040 | IEA base case | kt contained Cu | 1624 | 33710 | 4.82 |
| Copper | Refining | Russia | 2021 | Historical | kt contained Cu | 954 | 24965 | 3.82 |
| Copper | Refining | Russia | 2025 | Historical | kt contained Cu | 990 | 27955 | 3.54 |
| Copper | Refining | Russia | 2030 | IEA base case | kt contained Cu | 1110 | 36383 | 3.05 |
| Copper | Refining | Russia | 2040 | IEA base case | kt contained Cu | 1105 | 33710 | 3.28 |
| Copper | Refining | India | 2021 | Historical | kt contained Cu | 490 | 24965 | 1.96 |
| Copper | Refining | India | 2025 | Historical | kt contained Cu | 646 | 27955 | 2.31 |
| Copper | Refining | India | 2030 | IEA base case | kt contained Cu | 1500 | 36383 | 4.12 |
| Copper | Refining | India | 2040 | IEA base case | kt contained Cu | 1500 | 33710 | 4.45 |
| Copper | Refining | Rest of world | 2021 | Historical | kt contained Cu | 7328 | 24965 | 29.35 |
| Copper | Refining | Rest of world | 2025 | Historical | kt contained Cu | 6740 | 27955 | 24.11 |
| Copper | Refining | Rest of world | 2030 | IEA base case | kt contained Cu | 8970 | 36383 | 24.65 |
| Copper | Refining | Rest of world | 2040 | IEA base case | kt contained Cu | 8205 | 33710 | 24.34 |
| Copper | Refining | World | 2021 | Historical | kt contained Cu | 24965 | 24965 | 100.00 |
| Copper | Refining | World | 2025 | Historical | kt contained Cu | 27955 | 27955 | 100.00 |
| Copper | Refining | World | 2030 | IEA base case | kt contained Cu | 36383 | 36383 | 100.00 |
| Copper | Refining | World | 2040 | IEA base case | kt contained Cu | 33710 | 33710 | 100.00 |
| Lithium | Extraction | Australia | 2021 | Historical | kt contained Li | 50 | 107 | 46.73 |
| Lithium | Extraction | Australia | 2025 | Historical | kt contained Li | 104 | 302 | 34.44 |
| Lithium | Extraction | Australia | 2030 | IEA base case | kt contained Li | 143 | 540 | 26.48 |
| Lithium | Extraction | Australia | 2040 | IEA base case | kt contained Li | 120 | 482 | 24.90 |
| Lithium | Extraction | China | 2021 | Historical | kt contained Li | 17 | 107 | 15.89 |
| Lithium | Extraction | China | 2025 | Historical | kt contained Li | 70 | 302 | 23.18 |
| Lithium | Extraction | China | 2030 | IEA base case | kt contained Li | 162 | 540 | 30.00 |
| Lithium | Extraction | China | 2040 | IEA base case | kt contained Li | 150 | 482 | 31.12 |
| Lithium | Extraction | Chile | 2021 | Historical | kt contained Li | 28 | 107 | 26.17 |
| Lithium | Extraction | Chile | 2025 | Historical | kt contained Li | 52 | 302 | 17.22 |
| Lithium | Extraction | Chile | 2030 | IEA base case | kt contained Li | 57 | 540 | 10.56 |
| Lithium | Extraction | Chile | 2040 | IEA base case | kt contained Li | 59 | 482 | 12.24 |
| Lithium | Extraction | Zimbabwe | 2021 | Historical | kt contained Li | 2 | 107 | 1.87 |
| Lithium | Extraction | Zimbabwe | 2025 | Historical | kt contained Li | 28 | 302 | 9.27 |
| Lithium | Extraction | Zimbabwe | 2030 | IEA base case | kt contained Li | 27 | 540 | 5.00 |
| Lithium | Extraction | Zimbabwe | 2040 | IEA base case | kt contained Li | 27 | 482 | 5.60 |
| Lithium | Extraction | Argentina | 2021 | Historical | kt contained Li | 6 | 107 | 5.61 |
| Lithium | Extraction | Argentina | 2025 | Historical | kt contained Li | 19 | 302 | 6.29 |
| Lithium | Extraction | Argentina | 2030 | IEA base case | kt contained Li | 51 | 540 | 9.44 |
| Lithium | Extraction | Argentina | 2040 | IEA base case | kt contained Li | 54 | 482 | 11.20 |
| Lithium | Extraction | Canada | 2021 | Historical | kt contained Li | 0 | 107 | 0.00 |
| Lithium | Extraction | Canada | 2025 | Historical | kt contained Li | 7 | 302 | 2.32 |
| Lithium | Extraction | Canada | 2030 | IEA base case | kt contained Li | 24 | 540 | 4.44 |
| Lithium | Extraction | Canada | 2040 | IEA base case | kt contained Li | 22 | 482 | 4.56 |
| Lithium | Extraction | Rest of world | 2021 | Historical | kt contained Li | 4 | 107 | 3.74 |
| Lithium | Extraction | Rest of world | 2025 | Historical | kt contained Li | 23 | 302 | 7.62 |
| Lithium | Extraction | Rest of world | 2030 | IEA base case | kt contained Li | 77 | 540 | 14.26 |
| Lithium | Extraction | Rest of world | 2040 | IEA base case | kt contained Li | 50 | 482 | 10.37 |
| Lithium | Extraction | World | 2021 | Historical | kt contained Li | 107 | 107 | 100.00 |
| Lithium | Extraction | World | 2025 | Historical | kt contained Li | 302 | 302 | 100.00 |
| Lithium | Extraction | World | 2030 | IEA base case | kt contained Li | 540 | 540 | 100.00 |
| Lithium | Extraction | World | 2040 | IEA base case | kt contained Li | 482 | 482 | 100.00 |
| Lithium | Chemicals | China | 2021 | Historical | kt contained Li | 70 | 103 | 67.96 |
| Lithium | Chemicals | China | 2025 | Historical | kt contained Li | 235 | 319 | 73.67 |
| Lithium | Chemicals | China | 2030 | IEA base case | kt contained Li | 369 | 544 | 67.83 |
| Lithium | Chemicals | China | 2040 | IEA base case | kt contained Li | 374 | 568 | 65.85 |
| Lithium | Chemicals | Chile | 2021 | Historical | kt contained Li | 25 | 103 | 24.27 |
| Lithium | Chemicals | Chile | 2025 | Historical | kt contained Li | 52 | 319 | 16.30 |
| Lithium | Chemicals | Chile | 2030 | IEA base case | kt contained Li | 57 | 544 | 10.48 |
| Lithium | Chemicals | Chile | 2040 | IEA base case | kt contained Li | 59 | 568 | 10.39 |
| Lithium | Chemicals | Argentina | 2021 | Historical | kt contained Li | 7 | 103 | 6.80 |
| Lithium | Chemicals | Argentina | 2025 | Historical | kt contained Li | 16 | 319 | 5.02 |
| Lithium | Chemicals | Argentina | 2030 | IEA base case | kt contained Li | 51 | 544 | 9.38 |
| Lithium | Chemicals | Argentina | 2040 | IEA base case | kt contained Li | 54 | 568 | 9.51 |
| Lithium | Chemicals | Australia | 2021 | Historical | kt contained Li | 0 | 103 | 0.00 |
| Lithium | Chemicals | Australia | 2025 | Historical | kt contained Li | 6 | 319 | 1.88 |
| Lithium | Chemicals | Australia | 2030 | IEA base case | kt contained Li | 16 | 544 | 2.94 |
| Lithium | Chemicals | Australia | 2040 | IEA base case | kt contained Li | 26 | 568 | 4.58 |
| Lithium | Chemicals | Germany | 2021 | Historical | kt contained Li | 0 | 103 | 0.00 |
| Lithium | Chemicals | Germany | 2025 | Historical | kt contained Li | 3 | 319 | 0.94 |
| Lithium | Chemicals | Germany | 2030 | IEA base case | kt contained Li | 6 | 544 | 1.10 |
| Lithium | Chemicals | Germany | 2040 | IEA base case | kt contained Li | 7 | 568 | 1.23 |
| Lithium | Chemicals | United States | 2021 | Historical | kt contained Li | 1 | 103 | 0.97 |
| Lithium | Chemicals | United States | 2025 | Historical | kt contained Li | 1 | 319 | 0.31 |
| Lithium | Chemicals | United States | 2030 | IEA base case | kt contained Li | 19 | 544 | 3.49 |
| Lithium | Chemicals | United States | 2040 | IEA base case | kt contained Li | 20 | 568 | 3.52 |
| Lithium | Chemicals | Rest of world | 2021 | Historical | kt contained Li | 0 | 103 | 0.00 |
| Lithium | Chemicals | Rest of world | 2025 | Historical | kt contained Li | 5 | 319 | 1.57 |
| Lithium | Chemicals | Rest of world | 2030 | IEA base case | kt contained Li | 25 | 544 | 4.60 |
| Lithium | Chemicals | Rest of world | 2040 | IEA base case | kt contained Li | 28 | 568 | 4.93 |
| Lithium | Chemicals | World | 2021 | Historical | kt contained Li | 103 | 103 | 100.00 |
| Lithium | Chemicals | World | 2025 | Historical | kt contained Li | 319 | 319 | 100.00 |
| Lithium | Chemicals | World | 2030 | IEA base case | kt contained Li | 544 | 544 | 100.00 |
| Lithium | Chemicals | World | 2040 | IEA base case | kt contained Li | 568 | 568 | 100.00 |
| Nickel | Mining | Indonesia | 2021 | Historical | kt contained Ni | 1105 | 2770 | 39.89 |
| Nickel | Mining | Indonesia | 2025 | Historical | kt contained Ni | 2637 | 4207 | 62.68 |
| Nickel | Mining | Indonesia | 2030 | IEA base case | kt contained Ni | 3567 | 5098 | 69.97 |
| Nickel | Mining | Indonesia | 2040 | IEA base case | kt contained Ni | 3568 | 4858 | 73.45 |
| Nickel | Mining | Philippines | 2021 | Historical | kt contained Ni | 476 | 2770 | 17.18 |
| Nickel | Mining | Philippines | 2025 | Historical | kt contained Ni | 482 | 4207 | 11.46 |
| Nickel | Mining | Philippines | 2030 | IEA base case | kt contained Ni | 308 | 5098 | 6.04 |
| Nickel | Mining | Philippines | 2040 | IEA base case | kt contained Ni | 308 | 4858 | 6.34 |
| Nickel | Mining | Russia | 2021 | Historical | kt contained Ni | 205 | 2770 | 7.40 |
| Nickel | Mining | Russia | 2025 | Historical | kt contained Ni | 192 | 4207 | 4.56 |
| Nickel | Mining | Russia | 2030 | IEA base case | kt contained Ni | 218 | 5098 | 4.28 |
| Nickel | Mining | Russia | 2040 | IEA base case | kt contained Ni | 218 | 4858 | 4.49 |
| Nickel | Mining | China | 2021 | Historical | kt contained Ni | 108 | 2770 | 3.90 |
| Nickel | Mining | China | 2025 | Historical | kt contained Ni | 147 | 4207 | 3.49 |
| Nickel | Mining | China | 2030 | IEA base case | kt contained Ni | 161 | 5098 | 3.16 |
| Nickel | Mining | China | 2040 | IEA base case | kt contained Ni | 152 | 4858 | 3.13 |
| Nickel | Mining | New Caledonia | 2021 | Historical | kt contained Ni | 186 | 2770 | 6.71 |
| Nickel | Mining | New Caledonia | 2025 | Historical | kt contained Ni | 138 | 4207 | 3.28 |
| Nickel | Mining | New Caledonia | 2030 | IEA base case | kt contained Ni | 207 | 5098 | 4.06 |
| Nickel | Mining | New Caledonia | 2040 | IEA base case | kt contained Ni | 207 | 4858 | 4.26 |
| Nickel | Mining | Canada | 2021 | Historical | kt contained Ni | 134 | 2770 | 4.84 |
| Nickel | Mining | Canada | 2025 | Historical | kt contained Ni | 138 | 4207 | 3.28 |
| Nickel | Mining | Canada | 2030 | IEA base case | kt contained Ni | 147 | 5098 | 2.88 |
| Nickel | Mining | Canada | 2040 | IEA base case | kt contained Ni | 52 | 4858 | 1.07 |
| Nickel | Mining | Brazil | 2021 | Historical | kt contained Ni | 76 | 2770 | 2.74 |
| Nickel | Mining | Brazil | 2025 | Historical | kt contained Ni | 85 | 4207 | 2.02 |
| Nickel | Mining | Brazil | 2030 | IEA base case | kt contained Ni | 82 | 5098 | 1.61 |
| Nickel | Mining | Brazil | 2040 | IEA base case | kt contained Ni | 82 | 4858 | 1.69 |
| Nickel | Mining | Rest of world | 2021 | Historical | kt contained Ni | 480 | 2770 | 17.33 |
| Nickel | Mining | Rest of world | 2025 | Historical | kt contained Ni | 388 | 4207 | 9.22 |
| Nickel | Mining | Rest of world | 2030 | IEA base case | kt contained Ni | 408 | 5098 | 8.00 |
| Nickel | Mining | Rest of world | 2040 | IEA base case | kt contained Ni | 271 | 4858 | 5.58 |
| Nickel | Mining | World | 2021 | Historical | kt contained Ni | 2770 | 2770 | 100.00 |
| Nickel | Mining | World | 2025 | Historical | kt contained Ni | 4207 | 4207 | 100.00 |
| Nickel | Mining | World | 2030 | IEA base case | kt contained Ni | 5098 | 5098 | 100.00 |
| Nickel | Mining | World | 2040 | IEA base case | kt contained Ni | 4858 | 4858 | 100.00 |
| Nickel | Refining | Indonesia | 2021 | Historical | kt contained Ni | 907 | 2709 | 33.48 |
| Nickel | Refining | Indonesia | 2025 | Historical | kt contained Ni | 1681 | 3729 | 45.08 |
| Nickel | Refining | Indonesia | 2030 | IEA base case | kt contained Ni | 2080 | 4231 | 49.16 |
| Nickel | Refining | Indonesia | 2040 | IEA base case | kt contained Ni | 2081 | 4159 | 50.04 |
| Nickel | Refining | China | 2021 | Historical | kt contained Ni | 746 | 2709 | 27.54 |
| Nickel | Refining | China | 2025 | Historical | kt contained Ni | 1160 | 3729 | 31.11 |
| Nickel | Refining | China | 2030 | IEA base case | kt contained Ni | 1194 | 4231 | 28.22 |
| Nickel | Refining | China | 2040 | IEA base case | kt contained Ni | 1194 | 4159 | 28.71 |
| Nickel | Refining | Canada | 2021 | Historical | kt contained Ni | 113 | 2709 | 4.17 |
| Nickel | Refining | Canada | 2025 | Historical | kt contained Ni | 125 | 3729 | 3.35 |
| Nickel | Refining | Canada | 2030 | IEA base case | kt contained Ni | 134 | 4231 | 3.17 |
| Nickel | Refining | Canada | 2040 | IEA base case | kt contained Ni | 90 | 4159 | 2.16 |
| Nickel | Refining | Russia | 2021 | Historical | kt contained Ni | 121 | 2709 | 4.47 |
| Nickel | Refining | Russia | 2025 | Historical | kt contained Ni | 123 | 3729 | 3.30 |
| Nickel | Refining | Russia | 2030 | IEA base case | kt contained Ni | 142 | 4231 | 3.36 |
| Nickel | Refining | Russia | 2040 | IEA base case | kt contained Ni | 142 | 4159 | 3.41 |
| Nickel | Refining | Japan | 2021 | Historical | kt contained Ni | 128 | 2709 | 4.72 |
| Nickel | Refining | Japan | 2025 | Historical | kt contained Ni | 108 | 3729 | 2.90 |
| Nickel | Refining | Japan | 2030 | IEA base case | kt contained Ni | 107 | 4231 | 2.53 |
| Nickel | Refining | Japan | 2040 | IEA base case | kt contained Ni | 107 | 4159 | 2.57 |
| Nickel | Refining | Norway | 2021 | Historical | kt contained Ni | 91 | 2709 | 3.36 |
| Nickel | Refining | Norway | 2025 | Historical | kt contained Ni | 100 | 3729 | 2.68 |
| Nickel | Refining | Norway | 2030 | IEA base case | kt contained Ni | 92 | 4231 | 2.17 |
| Nickel | Refining | Norway | 2040 | IEA base case | kt contained Ni | 92 | 4159 | 2.21 |
| Nickel | Refining | Brazil | 2021 | Historical | kt contained Ni | 61 | 2709 | 2.25 |
| Nickel | Refining | Brazil | 2025 | Historical | kt contained Ni | 64 | 3729 | 1.72 |
| Nickel | Refining | Brazil | 2030 | IEA base case | kt contained Ni | 73 | 4231 | 1.73 |
| Nickel | Refining | Brazil | 2040 | IEA base case | kt contained Ni | 65 | 4159 | 1.56 |
| Nickel | Refining | Rest of world | 2021 | Historical | kt contained Ni | 541 | 2709 | 19.97 |
| Nickel | Refining | Rest of world | 2025 | Historical | kt contained Ni | 367 | 3729 | 9.84 |
| Nickel | Refining | Rest of world | 2030 | IEA base case | kt contained Ni | 409 | 4231 | 9.67 |
| Nickel | Refining | Rest of world | 2040 | IEA base case | kt contained Ni | 387 | 4159 | 9.31 |
| Nickel | Refining | World | 2021 | Historical | kt contained Ni | 2709 | 2709 | 100.00 |
| Nickel | Refining | World | 2025 | Historical | kt contained Ni | 3729 | 3729 | 100.00 |
| Nickel | Refining | World | 2030 | IEA base case | kt contained Ni | 4231 | 4231 | 100.00 |
| Nickel | Refining | World | 2040 | IEA base case | kt contained Ni | 4159 | 4159 | 100.00 |
| Cobalt | Mining | DRC | 2021 | Historical | kt contained Co | 122 | 186 | 65.59 |
| Cobalt | Mining | DRC | 2025 | Historical | kt contained Co | 210 | 320 | 65.62 |
| Cobalt | Mining | DRC | 2030 | IEA base case | kt contained Co | 121 | 252 | 48.02 |
| Cobalt | Mining | DRC | 2040 | IEA base case | kt contained Co | 88 | 200 | 44.00 |
| Cobalt | Mining | Indonesia | 2021 | Historical | kt contained Co | 4 | 186 | 2.15 |
| Cobalt | Mining | Indonesia | 2025 | Historical | kt contained Co | 48 | 320 | 15.00 |
| Cobalt | Mining | Indonesia | 2030 | IEA base case | kt contained Co | 69 | 252 | 27.38 |
| Cobalt | Mining | Indonesia | 2040 | IEA base case | kt contained Co | 67 | 200 | 33.50 |
| Cobalt | Mining | Russia | 2021 | Historical | kt contained Co | 6 | 186 | 3.23 |
| Cobalt | Mining | Russia | 2025 | Historical | kt contained Co | 8 | 320 | 2.50 |
| Cobalt | Mining | Russia | 2030 | IEA base case | kt contained Co | 8 | 252 | 3.17 |
| Cobalt | Mining | Russia | 2040 | IEA base case | kt contained Co | 8 | 200 | 4.00 |
| Cobalt | Mining | China | 2021 | Historical | kt contained Co | 7 | 186 | 3.76 |
| Cobalt | Mining | China | 2025 | Historical | kt contained Co | 7 | 320 | 2.19 |
| Cobalt | Mining | China | 2030 | IEA base case | kt contained Co | 7 | 252 | 2.78 |
| Cobalt | Mining | China | 2040 | IEA base case | kt contained Co | 7 | 200 | 3.50 |
| Cobalt | Mining | Australia | 2021 | Historical | kt contained Co | 8 | 186 | 4.30 |
| Cobalt | Mining | Australia | 2025 | Historical | kt contained Co | 4 | 320 | 1.25 |
| Cobalt | Mining | Australia | 2030 | IEA base case | kt contained Co | 5 | 252 | 1.98 |
| Cobalt | Mining | Australia | 2040 | IEA base case | kt contained Co | 4 | 200 | 2.00 |
| Cobalt | Mining | Zambia | 2021 | Historical | kt contained Co | 4 | 186 | 2.15 |
| Cobalt | Mining | Zambia | 2025 | Historical | kt contained Co | 4 | 320 | 1.25 |
| Cobalt | Mining | Zambia | 2030 | IEA base case | kt contained Co | 7 | 252 | 2.78 |
| Cobalt | Mining | Zambia | 2040 | IEA base case | kt contained Co | 6 | 200 | 3.00 |
| Cobalt | Mining | Rest of world | 2021 | Historical | kt contained Co | 35 | 186 | 18.82 |
| Cobalt | Mining | Rest of world | 2025 | Historical | kt contained Co | 39 | 320 | 12.19 |
| Cobalt | Mining | Rest of world | 2030 | IEA base case | kt contained Co | 34 | 252 | 13.49 |
| Cobalt | Mining | Rest of world | 2040 | IEA base case | kt contained Co | 21 | 200 | 10.50 |
| Cobalt | Mining | World | 2021 | Historical | kt contained Co | 186 | 186 | 100.00 |
| Cobalt | Mining | World | 2025 | Historical | kt contained Co | 320 | 320 | 100.00 |
| Cobalt | Mining | World | 2030 | IEA base case | kt contained Co | 252 | 252 | 100.00 |
| Cobalt | Mining | World | 2040 | IEA base case | kt contained Co | 200 | 200 | 100.00 |
| Cobalt | Refining | China | 2021 | Historical | kt contained Co | 132 | 177 | 74.58 |
| Cobalt | Refining | China | 2025 | Historical | kt contained Co | 180 | 238 | 75.63 |
| Cobalt | Refining | China | 2030 | IEA base case | kt contained Co | 217 | 295 | 73.56 |
| Cobalt | Refining | China | 2040 | IEA base case | kt contained Co | 260 | 335 | 77.61 |
| Cobalt | Refining | Finland | 2021 | Historical | kt contained Co | 14 | 177 | 7.91 |
| Cobalt | Refining | Finland | 2025 | Historical | kt contained Co | 20 | 238 | 8.40 |
| Cobalt | Refining | Finland | 2030 | IEA base case | kt contained Co | 20 | 295 | 6.78 |
| Cobalt | Refining | Finland | 2040 | IEA base case | kt contained Co | 20 | 335 | 5.97 |
| Cobalt | Refining | Japan | 2021 | Historical | kt contained Co | 5 | 177 | 2.82 |
| Cobalt | Refining | Japan | 2025 | Historical | kt contained Co | 6 | 238 | 2.52 |
| Cobalt | Refining | Japan | 2030 | IEA base case | kt contained Co | 7 | 295 | 2.37 |
| Cobalt | Refining | Japan | 2040 | IEA base case | kt contained Co | 7 | 335 | 2.09 |
| Cobalt | Refining | Indonesia | 2021 | Historical | kt contained Co | 0 | 177 | 0.00 |
| Cobalt | Refining | Indonesia | 2025 | Historical | kt contained Co | 6 | 238 | 2.52 |
| Cobalt | Refining | Indonesia | 2030 | IEA base case | kt contained Co | 17 | 295 | 5.76 |
| Cobalt | Refining | Indonesia | 2040 | IEA base case | kt contained Co | 17 | 335 | 5.07 |
| Cobalt | Refining | Canada | 2021 | Historical | kt contained Co | 4 | 177 | 2.26 |
| Cobalt | Refining | Canada | 2025 | Historical | kt contained Co | 6 | 238 | 2.52 |
| Cobalt | Refining | Canada | 2030 | IEA base case | kt contained Co | 6 | 295 | 2.03 |
| Cobalt | Refining | Canada | 2040 | IEA base case | kt contained Co | 2 | 335 | 0.60 |
| Cobalt | Refining | Norway | 2021 | Historical | kt contained Co | 4 | 177 | 2.26 |
| Cobalt | Refining | Norway | 2025 | Historical | kt contained Co | 3 | 238 | 1.26 |
| Cobalt | Refining | Norway | 2030 | IEA base case | kt contained Co | 3 | 295 | 1.02 |
| Cobalt | Refining | Norway | 2040 | IEA base case | kt contained Co | 3 | 335 | 0.90 |
| Cobalt | Refining | Rest of world | 2021 | Historical | kt contained Co | 19 | 177 | 10.73 |
| Cobalt | Refining | Rest of world | 2025 | Historical | kt contained Co | 17 | 238 | 7.14 |
| Cobalt | Refining | Rest of world | 2030 | IEA base case | kt contained Co | 26 | 295 | 8.81 |
| Cobalt | Refining | Rest of world | 2040 | IEA base case | kt contained Co | 27 | 335 | 8.06 |
| Cobalt | Refining | World | 2021 | Historical | kt contained Co | 177 | 177 | 100.00 |
| Cobalt | Refining | World | 2025 | Historical | kt contained Co | 238 | 238 | 100.00 |
| Cobalt | Refining | World | 2030 | IEA base case | kt contained Co | 295 | 295 | 100.00 |
| Cobalt | Refining | World | 2040 | IEA base case | kt contained Co | 335 | 335 | 100.00 |
| Graphite | Natural graphite mining | China | 2021 | Historical | kt | 1234 | 1540 | 80.13 |
| Graphite | Natural graphite mining | China | 2025 | Historical | kt | 1432 | 1781 | 80.40 |
| Graphite | Natural graphite mining | China | 2030 | IEA base case | kt | 1239 | 2214 | 55.96 |
| Graphite | Natural graphite mining | China | 2040 | IEA base case | kt | 1337 | 2460 | 54.35 |
| Graphite | Natural graphite mining | Madagascar | 2021 | Historical | kt | 82 | 1540 | 5.32 |
| Graphite | Natural graphite mining | Madagascar | 2025 | Historical | kt | 70 | 1781 | 3.93 |
| Graphite | Natural graphite mining | Madagascar | 2030 | IEA base case | kt | 170 | 2214 | 7.68 |
| Graphite | Natural graphite mining | Madagascar | 2040 | IEA base case | kt | 165 | 2460 | 6.71 |
| Graphite | Natural graphite mining | Mozambique | 2021 | Historical | kt | 77 | 1540 | 5.00 |
| Graphite | Natural graphite mining | Mozambique | 2025 | Historical | kt | 67 | 1781 | 3.76 |
| Graphite | Natural graphite mining | Mozambique | 2030 | IEA base case | kt | 259 | 2214 | 11.70 |
| Graphite | Natural graphite mining | Mozambique | 2040 | IEA base case | kt | 368 | 2460 | 14.96 |
| Graphite | Natural graphite mining | Tanzania | 2021 | Historical | kt | 0 | 1540 | 0.00 |
| Graphite | Natural graphite mining | Tanzania | 2025 | Historical | kt | 62 | 1781 | 3.48 |
| Graphite | Natural graphite mining | Tanzania | 2030 | IEA base case | kt | 263 | 2214 | 11.88 |
| Graphite | Natural graphite mining | Tanzania | 2040 | IEA base case | kt | 283 | 2460 | 11.50 |
| Graphite | Natural graphite mining | Brazil | 2021 | Historical | kt | 67 | 1540 | 4.35 |
| Graphite | Natural graphite mining | Brazil | 2025 | Historical | kt | 64 | 1781 | 3.59 |
| Graphite | Natural graphite mining | Brazil | 2030 | IEA base case | kt | 99 | 2214 | 4.47 |
| Graphite | Natural graphite mining | Brazil | 2040 | IEA base case | kt | 84 | 2460 | 3.41 |
| Graphite | Natural graphite mining | Russia | 2021 | Historical | kt | 28 | 1540 | 1.82 |
| Graphite | Natural graphite mining | Russia | 2025 | Historical | kt | 28 | 1781 | 1.57 |
| Graphite | Natural graphite mining | Russia | 2030 | IEA base case | kt | 30 | 2214 | 1.36 |
| Graphite | Natural graphite mining | Russia | 2040 | IEA base case | kt | 49 | 2460 | 1.99 |
| Graphite | Natural graphite mining | Rest of world | 2021 | Historical | kt | 51 | 1540 | 3.31 |
| Graphite | Natural graphite mining | Rest of world | 2025 | Historical | kt | 58 | 1781 | 3.26 |
| Graphite | Natural graphite mining | Rest of world | 2030 | IEA base case | kt | 154 | 2214 | 6.96 |
| Graphite | Natural graphite mining | Rest of world | 2040 | IEA base case | kt | 174 | 2460 | 7.07 |
| Graphite | Natural graphite mining | World | 2021 | Historical | kt | 1540 | 1540 | 100.00 |
| Graphite | Natural graphite mining | World | 2025 | Historical | kt | 1781 | 1781 | 100.00 |
| Graphite | Natural graphite mining | World | 2030 | IEA base case | kt | 2214 | 2214 | 100.00 |
| Graphite | Natural graphite mining | World | 2040 | IEA base case | kt | 2460 | 2460 | 100.00 |
| Graphite | Battery-grade graphite | China | 2021 | Historical | kt | 638 | 683 | 93.41 |
| Graphite | Battery-grade graphite | China | 2025 | Historical | kt | 2139 | 2266 | 94.40 |
| Graphite | Battery-grade graphite | China | 2030 | IEA base case | kt | 3026 | 3356 | 90.17 |
| Graphite | Battery-grade graphite | China | 2040 | IEA base case | kt | 4039 | 4467 | 90.42 |
| Graphite | Battery-grade graphite | Japan | 2021 | Historical | kt | 41 | 683 | 6.00 |
| Graphite | Battery-grade graphite | Japan | 2025 | Historical | kt | 68 | 2266 | 3.00 |
| Graphite | Battery-grade graphite | Japan | 2030 | IEA base case | kt | 149 | 3356 | 4.44 |
| Graphite | Battery-grade graphite | Japan | 2040 | IEA base case | kt | 165 | 4467 | 3.69 |
| Graphite | Battery-grade graphite | Indonesia | 2021 | Historical | kt | 0 | 683 | 0.00 |
| Graphite | Battery-grade graphite | Indonesia | 2025 | Historical | kt | 32 | 2266 | 1.41 |
| Graphite | Battery-grade graphite | Indonesia | 2030 | IEA base case | kt | 93 | 3356 | 2.77 |
| Graphite | Battery-grade graphite | Indonesia | 2040 | IEA base case | kt | 103 | 4467 | 2.31 |
| Graphite | Battery-grade graphite | United States | 2021 | Historical | kt | 0 | 683 | 0.00 |
| Graphite | Battery-grade graphite | United States | 2025 | Historical | kt | 13 | 2266 | 0.57 |
| Graphite | Battery-grade graphite | United States | 2030 | IEA base case | kt | 15 | 3356 | 0.45 |
| Graphite | Battery-grade graphite | United States | 2040 | IEA base case | kt | 17 | 4467 | 0.38 |
| Graphite | Battery-grade graphite | Korea | 2021 | Historical | kt | 0 | 683 | 0.00 |
| Graphite | Battery-grade graphite | Korea | 2025 | Historical | kt | 5 | 2266 | 0.22 |
| Graphite | Battery-grade graphite | Korea | 2030 | IEA base case | kt | 10 | 3356 | 0.30 |
| Graphite | Battery-grade graphite | Korea | 2040 | IEA base case | kt | 11 | 4467 | 0.25 |
| Graphite | Battery-grade graphite | Germany | 2021 | Historical | kt | 0 | 683 | 0.00 |
| Graphite | Battery-grade graphite | Germany | 2025 | Historical | kt | 5 | 2266 | 0.22 |
| Graphite | Battery-grade graphite | Germany | 2030 | IEA base case | kt | 10 | 3356 | 0.30 |
| Graphite | Battery-grade graphite | Germany | 2040 | IEA base case | kt | 10 | 4467 | 0.22 |
| Graphite | Battery-grade graphite | Rest of world | 2021 | Historical | kt | 4 | 683 | 0.59 |
| Graphite | Battery-grade graphite | Rest of world | 2025 | Historical | kt | 3 | 2266 | 0.13 |
| Graphite | Battery-grade graphite | Rest of world | 2030 | IEA base case | kt | 53 | 3356 | 1.58 |
| Graphite | Battery-grade graphite | Rest of world | 2040 | IEA base case | kt | 121 | 4467 | 2.71 |
| Graphite | Battery-grade graphite | World | 2021 | Historical | kt | 683 | 683 | 100.00 |
| Graphite | Battery-grade graphite | World | 2025 | Historical | kt | 2266 | 2266 | 100.00 |
| Graphite | Battery-grade graphite | World | 2030 | IEA base case | kt | 3356 | 3356 | 100.00 |
| Graphite | Battery-grade graphite | World | 2040 | IEA base case | kt | 4467 | 4467 | 100.00 |
| Magnet rare earths | Mining | China | 2021 | Historical | kt REE | 32 | 57 | 56.14 |
| Magnet rare earths | Mining | China | 2025 | Historical | kt REE | 47 | 80 | 58.75 |
| Magnet rare earths | Mining | China | 2030 | IEA base case | kt REE | 51 | 97 | 52.58 |
| Magnet rare earths | Mining | China | 2040 | IEA base case | kt REE | 57 | 104 | 54.81 |
| Magnet rare earths | Mining | Myanmar | 2021 | Historical | kt REE | 8 | 57 | 14.04 |
| Magnet rare earths | Mining | Myanmar | 2025 | Historical | kt REE | 13 | 80 | 16.25 |
| Magnet rare earths | Mining | Myanmar | 2030 | IEA base case | kt REE | 11 | 97 | 11.34 |
| Magnet rare earths | Mining | Myanmar | 2040 | IEA base case | kt REE | 11 | 104 | 10.58 |
| Magnet rare earths | Mining | United States | 2021 | Historical | kt REE | 6 | 57 | 10.53 |
| Magnet rare earths | Mining | United States | 2025 | Historical | kt REE | 7 | 80 | 8.75 |
| Magnet rare earths | Mining | United States | 2030 | IEA base case | kt REE | 9 | 97 | 9.28 |
| Magnet rare earths | Mining | United States | 2040 | IEA base case | kt REE | 9 | 104 | 8.65 |
| Magnet rare earths | Mining | Australia | 2021 | Historical | kt REE | 4 | 57 | 7.02 |
| Magnet rare earths | Mining | Australia | 2025 | Historical | kt REE | 4 | 80 | 5.00 |
| Magnet rare earths | Mining | Australia | 2030 | IEA base case | kt REE | 11 | 97 | 11.34 |
| Magnet rare earths | Mining | Australia | 2040 | IEA base case | kt REE | 12 | 104 | 11.54 |
| Magnet rare earths | Mining | Lao PDR | 2021 | Historical | kt REE | 0 | 57 | 0.00 |
| Magnet rare earths | Mining | Lao PDR | 2025 | Historical | kt REE | 4 | 80 | 5.00 |
| Magnet rare earths | Mining | Lao PDR | 2030 | IEA base case | kt REE | 8 | 97 | 8.25 |
| Magnet rare earths | Mining | Lao PDR | 2040 | IEA base case | kt REE | 8 | 104 | 7.69 |
| Magnet rare earths | Mining | Rest of world | 2021 | Historical | kt REE | 7 | 57 | 12.28 |
| Magnet rare earths | Mining | Rest of world | 2025 | Historical | kt REE | 5 | 80 | 6.25 |
| Magnet rare earths | Mining | Rest of world | 2030 | IEA base case | kt REE | 6 | 97 | 6.19 |
| Magnet rare earths | Mining | Rest of world | 2040 | IEA base case | kt REE | 6 | 104 | 5.77 |
| Magnet rare earths | Mining | World | 2021 | Historical | kt REE | 57 | 57 | 100.00 |
| Magnet rare earths | Mining | World | 2025 | Historical | kt REE | 80 | 80 | 100.00 |
| Magnet rare earths | Mining | World | 2030 | IEA base case | kt REE | 97 | 97 | 100.00 |
| Magnet rare earths | Mining | World | 2040 | IEA base case | kt REE | 104 | 104 | 100.00 |
| Magnet rare earths | Separation and refining | China | 2021 | Historical | kt REE | 53 | 60 | 88.33 |
| Magnet rare earths | Separation and refining | China | 2025 | Historical | kt REE | 75 | 89 | 84.27 |
| Magnet rare earths | Separation and refining | China | 2030 | IEA base case | kt REE | 81 | 111 | 72.97 |
| Magnet rare earths | Separation and refining | China | 2040 | IEA base case | kt REE | 86 | 118 | 72.88 |
| Magnet rare earths | Separation and refining | United States | 2021 | Historical | kt REE | 0 | 60 | 0.00 |
| Magnet rare earths | Separation and refining | United States | 2025 | Historical | kt REE | 5 | 89 | 5.62 |
| Magnet rare earths | Separation and refining | United States | 2030 | IEA base case | kt REE | 9 | 111 | 8.11 |
| Magnet rare earths | Separation and refining | United States | 2040 | IEA base case | kt REE | 11 | 118 | 9.32 |
| Magnet rare earths | Separation and refining | Malaysia | 2021 | Historical | kt REE | 4 | 60 | 6.67 |
| Magnet rare earths | Separation and refining | Malaysia | 2025 | Historical | kt REE | 5 | 89 | 5.62 |
| Magnet rare earths | Separation and refining | Malaysia | 2030 | IEA base case | kt REE | 10 | 111 | 9.01 |
| Magnet rare earths | Separation and refining | Malaysia | 2040 | IEA base case | kt REE | 10 | 118 | 8.47 |
| Magnet rare earths | Separation and refining | France | 2021 | Historical | kt REE | 0 | 60 | 0.00 |
| Magnet rare earths | Separation and refining | France | 2025 | Historical | kt REE | 1 | 89 | 1.12 |
| Magnet rare earths | Separation and refining | France | 2030 | IEA base case | kt REE | 1 | 111 | 0.90 |
| Magnet rare earths | Separation and refining | France | 2040 | IEA base case | kt REE | 1 | 118 | 0.85 |
| Magnet rare earths | Separation and refining | Viet Nam | 2021 | Historical | kt REE | 1 | 60 | 1.67 |
| Magnet rare earths | Separation and refining | Viet Nam | 2025 | Historical | kt REE | 1 | 89 | 1.12 |
| Magnet rare earths | Separation and refining | Viet Nam | 2030 | IEA base case | kt REE | 1 | 111 | 0.90 |
| Magnet rare earths | Separation and refining | Viet Nam | 2040 | IEA base case | kt REE | 1 | 118 | 0.85 |
| Magnet rare earths | Separation and refining | Rest of world | 2021 | Historical | kt REE | 2 | 60 | 3.33 |
| Magnet rare earths | Separation and refining | Rest of world | 2025 | Historical | kt REE | 3 | 89 | 3.37 |
| Magnet rare earths | Separation and refining | Rest of world | 2030 | IEA base case | kt REE | 8 | 111 | 7.21 |
| Magnet rare earths | Separation and refining | Rest of world | 2040 | IEA base case | kt REE | 9 | 118 | 7.63 |
| Magnet rare earths | Separation and refining | World | 2021 | Historical | kt REE | 60 | 60 | 100.00 |
| Magnet rare earths | Separation and refining | World | 2025 | Historical | kt REE | 89 | 89 | 100.00 |
| Magnet rare earths | Separation and refining | World | 2030 | IEA base case | kt REE | 111 | 111 | 100.00 |
| Magnet rare earths | Separation and refining | World | 2040 | IEA base case | kt REE | 118 | 118 | 100.00 |
IEA Critical Minerals Outlook 2026, p. 348 · IEA Critical Minerals Outlook 2026, p. 351 · IEA Critical Minerals Outlook 2026, p. 354 · IEA Critical Minerals Outlook 2026, p. 357 · IEA Critical Minerals Outlook 2026, p. 360 · IEA Critical Minerals Outlook 2026, p. 363 · Download matching CSV
IEA 2026 Annex supply tables; numerator and published world denominator in same unit and stage. Rows are rounded; components may not reconcile to world.
Methodology and sources
The expanded comparisons retain original source periods and row-level source references. Formulas, scope and precision are documented immediately beside each table, in the downloadable methods and source-cell ledger. Rounded primary values are not treated as exact unrounded observations.
AMR transcribed the Top 3 share row from the six supply tables in the IEA’s Global Critical Minerals Outlook 2026. Source pages are copper 348, lithium 351, nickel 354, cobalt 357, graphite 360 and rare earth elements 363. Each record keeps the mineral, stage, measure, year, and whether the IEA labels the column historical or base case. We subtract upstream share from downstream share to calculate a percentage-point difference, and average the six source percentages equally for the summary. The IEA reports whole percentages, so the two decimal places in the means are computed precision. Original report and Annex.
Glossary
- Top-three share: The share of world stage output attributable to its three leading producing locations.
- Percentage point: An absolute difference between two percentages. A change from 75% to 95% is 20 percentage points.
- Refining stage: The named product boundary in the downstream IEA supply table. The products counted vary by mineral.
- Magnet rare earths: The IEA group of neodymium, praseodymium, dysprosium and terbium.
- Equal-weight mean: The arithmetic average of the mineral-specific shares, with each mineral given one vote.
- Base case: The supply scenario associated with the IEA’s included projects and assumptions.