Key Takeaways
- 6.6 million metric tons from the IEA chart. Its rounded 2035 Stated Policies primary requirement of 27.3 Mt less 20.7 Mt of projected base-case mine supply implies 24.18%. The report separately describes the gap at roughly 25%. (IEA source chart (accessed), Nov 2026)
- 10 Mt is the S&P 2040 market gap. It estimates 42 Mt of demand and projects an increase in recycled copper scrap to 10 Mt by that year. (S&P Global release, Jan 2026)
- Payne reports separate 2050 gaps for different supply sets. At 37.1 Mt per year of mined demand, the gap is 19.3 Mt against the 2018 fleet, 16.1 Mt after counting more recent output and 4.6 Mt against the upper identified pipeline. (Payne Institute, sections 2 and 3, Oct 2026)
Which changes the IEA copper gap more, higher project output or lower demand?
The IEA’s high project case adds 3.8 Mt Cu to its 2035 copper output assumptions, 1.9 times the spread between the lowest and highest primary requirements. Even under the high production case, output would need to rise a further 6.53%, 11.43% or 14.69% to meet Current Policies, Stated Policies or High Demand requirements, respectively. (IEA, expected mine supply and primary copper requirements by scenario, Nov 2026).
| Calculated comparison | Result | Calculation |
|---|---|---|
| Current Policies uplift from high production | 6.53% | (A ÷ D − 1) × 100 |
| Stated Policies uplift from high production | 11.43% | (B ÷ D − 1) × 100 |
| High Demand uplift from high production | 14.69% | (C ÷ D − 1) × 100 |
| Spread between residuals, High Demand versus Current Policies | 2.0 Mt Cu | C − A |
| Increase between the two project production cases | 3.8 Mt Cu | D − E |
| Project supply swing divided by the demand case spread | 1.9 times | (D − E) ÷ (C − A) |
The common starting point is 24.5 million tonnes of contained copper in the high production case. The required uplift divides each residual by that production base. A gap expressed as a percentage of requirements uses a different denominator and produces a smaller percentage.
How to use this comparison
The high production case moves the modeled balance 3.8 million tonnes compared with base supply. The entire range from Current Policies to High Demand moves it 2.0 million tonnes. These are alternative assumptions, so the comparison ranks their arithmetic effects. It assigns neither probability nor cost. Related evidence on Mine Development Lead Times: Discovery to First Production.
Reproduce the numbers
Each letter in the calculation maps to a source value below. Calculate from the displayed source values and round the result only at the end. The download records the source file, row, field and formula.
| Input | What is measured | Source value | Exact source row and field |
|---|---|---|---|
| A | Current Policies requirements | 26.1 | Current Policies (CPS) · Primary requirements (Mt Cu) |
| B | Stated Policies requirements | 27.3 | Stated Policies (STEPS) · Primary requirements (Mt Cu) |
| C | High Demand requirements | 28.1 | High Demand (HDS) · Primary requirements (Mt Cu) |
| D | High production case | 24.5 | Current Policies (CPS) · High-case supply (Mt Cu) |
| E | Base production case | 20.7 | Current Policies (CPS) · Base supply (Mt Cu) |
Download the calculation and source rows (CSV)
Cite this comparison
The IEA’s high project case adds 3.8 Mt Cu to its 2035 copper output assumptions, 1.9 times the spread between the lowest and highest primary requirements. Even under the high production case, output would need to rise a further 6.53%, 11.43% or 14.69% to meet Current Policies, Stated Policies or High Demand requirements, respectively. American Mineral Registry calculation from IEA, expected mine supply and primary copper requirements by scenario. 2035 primary copper requirements and high production case in the IEA 2026 outlook. https://americanmineralregistry.com/research/copper-supply-gap-forecast-comparison#amr-reader-analysis
HTML attribution
<a href="https://americanmineralregistry.com/research/copper-supply-gap-forecast-comparison#amr-reader-analysis">Which changes the IEA copper gap more, higher project output or lower demand?</a>
What does each forecast compare?
A copper statistic can be about the market as a whole, an amount that must be mined after accounting for secondary supply, or the capacity that a defined group of mines can still deliver. Even a common unit such as million metric tons can hide all three differences. Use the target year, source edition, demand case and counted supply together.
View chart data
The study population, projection year and supply coverage determine what its gap means.
| Study | Target | Supply boundary |
|---|---|---|
| IEA Global Critical Minerals Outlook 2026 | 2035 | Existing and announced mine supply, base case |
| S&P Copper in the Age of AI | 2040 | Market supply, with expected growth in recycled scrap |
| Payne Institute 2026 investment note | 2050 | 2018 mine fleet plus 3.2 Mt per year added since 2018 |
Values and definitions are also readable in HTML. Source precision and scope apply.
IEA Global Critical Minerals Outlook 2026 Original primary evidence
| Original study | Target year | Demand scenario | Requirement boundary | Production counted | Headline or reproducible result |
|---|---|---|---|---|---|
| IEA Global Critical Minerals Outlook 2026 | 2035 | Stated Policies Scenario | Primary requirement after deducting secondary supply | Existing and announced mine supply, base case | 25% headline; 6.6 Mt from rounded chart values |
| S&P Copper in the Age of AI | 2040 | Study outlook on current trajectory | Global copper demand, 42 Mt | Market supply, with expected growth in recycled scrap | 10 Mt market shortfall in the release |
| Payne Institute 2026 investment note | 2050 | Business as usual baseline | Mined copper demand, 37.1 Mt per year | 2018 mine fleet plus 3.2 Mt per year added since 2018 | 16.1 Mt per year additional output in the forward case |
IEA source · IEA source · S&P Global study release · Payne Institute · Download matching CSV
Copper mined at the ore stage, copper refined into a usable product, and copper contained in recovered scrap are related measures with different roles in a forecast. The IEA calculates primary requirements by deducting secondary supply from its total demand projection. S&P frames a market gap alongside expected growth in recycling. Payne’s note begins with its underlying study’s mined demand and asks how much new output is needed beyond a specified mine fleet. A percentage based on total demand therefore answers a different question from a percentage based on primary demand. (IEA methodology, Annex p. 345 (accessed), Nov 2026)
What do the IEA’s 2035 assumptions imply?
The underlying IEA chart shows 20.7 Mt of project-based mine supply in the base case. The high-production case adds 3.8 Mt, reaching 24.5 Mt in the rounding used by the chart. Its stacked demand inputs are 26.1 Mt under Current Policies, an additional 1.2 Mt under Stated Policies, and another 0.8 Mt in High Demand. AMR reconstructs the three requirements as 26.1, 27.3 and 28.1 Mt. All values are annual volumes of contained copper in 2035. (IEA 2035 copper chart data and notes (accessed), Nov 2026)
View chart data
Rounded original chart inputs, million metric tons of contained copper.
| Scenario | Primary requirements (Mt) | IEA base mine supply (Mt) |
|---|---|---|
| Current Policies (CPS) | 26.1 | 20.7 |
| Stated Policies (STEPS) | 27.3 | 20.7 |
| High Demand (HDS) | 28.1 | 20.7 |
Values and definitions are also readable in HTML. Source precision and scope apply.
| IEA 2035 demand scenario | Primary requirements (Mt Cu) | Base supply (Mt Cu) | Base gap (Mt Cu) | Base gap (%) | High-case supply (Mt Cu) | High-case gap (Mt Cu) | High-case gap (%) |
|---|---|---|---|---|---|---|---|
| Current Policies (CPS) | 26.1 | 20.7 | 5.4 | 20.69 | 24.5 | 1.6 | 6.13 |
| Stated Policies (STEPS) | 27.3 | 20.7 | 6.6 | 24.18 | 24.5 | 2.8 | 10.26 |
| High Demand (HDS) | 28.1 | 20.7 | 7.4 | 26.33 | 24.5 | 3.6 | 12.81 |
For the Stated Policies case, 27.3 minus 20.7 equals 6.6 Mt. That is 24.18% of the displayed primary requirement. The IEA separately describes the gap as approximately 25%. AMR keeps the producer’s headline and the calculation from rounded chart components as distinct figures. The higher supply case cuts the displayed Stated Policies gap to 2.8 Mt, or 10.26%, and still leaves 1.6 Mt against Current Policies. These calculations describe the scenario arithmetic. They do not establish that the additional production is committed.
The IEA says the corresponding projected copper gap narrowed from around 30% in its prior assessment to 25% in the 2026 outlook. The report attributes the improving balance in part to more anticipated projects. That comparison is about successive projections. To see the historical mining and refining data alongside the IEA vintages, read AMR’s copper production and demand statistics. IEA 2026 Outlook.
What does S&P’s 10-million-ton 2040 shortfall measure?
S&P Global’s 2026 study release projects 42 million metric tons of copper demand in 2040 and a 10 million metric ton shortfall if supply stays on the study’s modeled trajectory. The release also gives a projected 2030 production peak at 33 million metric tons. That peak is from a separate year. Subtracting it from 2040 demand would mix the production peak and the year used in the shortfall estimate.
| Measure | Target year | Million metric tons | Scope |
|---|---|---|---|
| Global copper demand | 2040 | 42 | Projected demand in the S&P release |
| Global production peak | 2030 | 33 | Projected production peak in the S&P release |
| Market shortfall | 2040 | 10 | Study headline shortfall on current trajectory |
| Recycled copper scrap | 2040 | 10 | Projected amount in the S&P release |
The release projects recycled copper scrap to rise from around 4 million to 10 million metric tons by 2040. It describes the projected shortfall alongside that recycling growth. Its demand drivers include conventional uses as well as electrification, data centers and defense. The public release gives rounded quantities and describes the 2040 gap as approximately a quarter of demand. To reproduce the precise underlying model, a researcher would need the source’s detailed unrounded demand and supply series. S&P Global producer release.
Why does the Payne Institute report 19.3, 16.1 and 4.6 Mt?
The Payne Institute starts with 37.1 Mt per year of baseline 2050 mined copper demand. It estimates that mines operating in 2018 will supply 17.8 Mt per year in 2050. The difference is 19.3 Mt per year. It then credits 3.2 Mt per year from mines opened or expanded after 2018, assuming that supply persists to 2050. The gap still to build from its forward starting point becomes 16.1 Mt per year. (Payne Institute, sections 2.1–2.2 and Table 1, Oct 2026)
View chart data
2050 mined copper, million metric tons each year. Separate model comparisons.
| Definition | Gap (Mt/yr) |
|---|---|
| Full-period gap | 19.3 |
| Forward baseline gap | 16.1 |
| Gap above upper pipeline | 4.6 |
Values and definitions are also readable in HTML. Source precision and scope apply.
| Metric | Million tonnes copper per year | Meaning |
|---|---|---|
| Baseline mined demand | 37.1 | 2050 mined copper requirement |
| Output from 2018 mines | 17.8 | Modeled 2050 production from the 2018 mine cohort |
| Full-period gap | 19.3 | 37.1 minus 17.8 |
| Capacity added since 2018 | 3.2 | 2025 addition assumed to persist to 2050 |
| Forward baseline gap | 16.1 | 19.3 minus 3.2 |
| Upper pipeline supply | 32.5 | Modeled 2050 output including identified projects |
| Gap above upper pipeline | 4.6 | 37.1 minus 32.5 |
The paper separately estimates that its upper identified-project supply trajectory could reach 32.5 Mt per year in 2050 if the assumed start dates materialize. That leaves 4.6 Mt per year below the same demand level. The upper trajectory includes projects that need development. The 16.1 figure therefore remains relevant to the investment required for future supply, while the 4.6 figure is relevant to the portion outside the upper identified pipeline.
The paper’s other cases supply a check on sensitivity. Using USGS’s rounded 23.0 Mt estimate of 2025 mine output instead of the underlying 23.5 Mt world benchmark in the Payne model reduces inferred post-2018 additions to 2.7 Mt. The forward gap then rises from 16.1 to 16.6 Mt per year. The example identifies the source change and shows why even two values inside one model can differ. Payne Institute, section 2.2.
How to use these benchmarks in a research brief
State the forecast horizon and source before using the gap. Include the demand measure and which existing, prospective and recycled output is counted. If converting to a percentage, divide by the requirement stated for that exact estimate. If comparing years, distinguish revisions for a common target year from a comparison of forecasts at different target years. These checks catch several common errors even before the reader sees the underlying spreadsheet.
How much of the IEA’s 2035 copper gap would the high case close?
The high-production case offers one of the most useful ways of evaluating a gap because it holds the demand assumptions fixed while changing the represented mine-project pipeline. All three IEA demand cases can be evaluated against the same 20.7 Mt base supply and 24.5 Mt high-case supply in the published chart. The extra 3.8 Mt of output closes much more of the smaller Current Policies gap than the larger High Demand gap. Against the Stated Policies case, 3.8 of the original 6.6 Mt gap is closed, or 57.58%, and 2.8 Mt remains.
View chart data
High-case uplift is 3.8 Mt in every demand scenario.
| Demand case | Additional supply (Mt) | Residual gap (Mt) |
|---|---|---|
| Current Policies | 3.8 | 1.6 |
| Stated Policies | 3.8 | 2.8 |
| High Demand | 3.8 | 3.6 |
Figures retain the source units and definitions.
Scroll the full table to compare columns and rows. The complete data are also available as a CSV.
| Scenario | Primary requirement (Mt) | Base production (Mt) | High-case production (Mt) | Increment from high case (Mt) | Base gap (Mt) | Base gap closed (%) | Remaining gap (Mt) | Additional output relative to high case (%) |
|---|---|---|---|---|---|---|---|---|
| Current Policies (CPS) | 26.1 | 20.7 | 24.5 | 3.80 | 5.4 | 70.37 | 1.6 | 6.53 |
| Stated Policies (STEPS) | 27.3 | 20.7 | 24.5 | 3.80 | 6.6 | 57.58 | 2.8 | 11.43 |
| High Demand (HDS) | 28.1 | 20.7 | 24.5 | 3.80 | 7.4 | 51.35 | 3.6 | 14.69 |
IEA original downloadable chart · Download matching CSV
From IEA 2035 figure: high minus base; uplift divided by base gap; residual divided by high case supply. Conditional project cases, not forecasts of shortage.
The “gap closed” percentage uses the original demand-minus-base-output gap as denominator. The additional-output percentage instead uses the high-case supply as denominator. Neither is the same measure as the unmet share of demand, which remains in the earlier table. For STEPS, the three results answer three different questions: what portion of the original gap would disappear, how much higher than high-case mine output the supply would have to be, and what share of primary requirements would remain uncovered. The results are derived from the rounded source chart, so keep the original IEA headline of roughly one quarter separate from precise arithmetic on displayed numbers. IEA 2035 primary supply requirements chart.
Why can the copper mine supply pipeline decline after 2030?
In the 2026 Annex, historical mine output is 23,227 kt in 2025 and the existing and announced base case reaches 24,571 kt in 2030. By 2040 it falls to 17,183 kt, a decline of 7,388 kt, or 30.07% relative to 2030. This differs from economic models which assume new mine investment will respond to prices, policy or rising demand. The IEA base case describes the specific project set and its expected output; it is not a conclusion that total real-world output will inevitably decline by that amount.
| Supply stage | 2025 historical (kt Cu) | 2030 base case (kt Cu) | 2040 base case (kt Cu) | 2030 to 2040 change (kt) | 2030 to 2040 relative change (%) |
|---|---|---|---|---|---|
| Mine output | 23227 | 24571 | 17183 | -7388 | -30.07 |
| Refined output | 27955 | 36383 | 33710 | -2673 | -7.35 |
IEA Critical Minerals Outlook 2026, p. 348 · Download matching CSV
Annex table: 2040 base case minus 2030, divided by 2030. Stage totals are not subtractable as an apparent consumption balance.
The same annex shows different refinery production volumes. Refining may use secondary inputs and concentrate from multiple origins. Comparing separate-stage totals as if they were the two sides of one commodity balance would incorrectly turn refining-minus-mining into a primary deficit. A primary requirement is calculated after considering secondary supply, whereas a total refined demand comparison has another boundary. IEA also excludes direct scrap use from its refined copper demand series. IEA annex copper supply and copper demand.
New mine supply is also not the same as reserves or resources. An announced prospect may require permitting, engineering, finance and a lengthy construction and ramp-up period before a saleable concentrate or cathode is produced. The mine development timeline study compares historical cohorts and distinguishes operating properties from projects with projected dates. The reserves and production study explains why a country's reserve share should not be substituted for its share of annual output.
How sensitive is copper mine investment to capital intensity?
The Payne Institute uses several capital-intensity assumptions in its investment comparison. This permits a useful, transparent sensitivity exercise independent of any project-specific valuation. At a forward capacity requirement of 16.1 Mt/y, a source assumption of USD 25,000 per annual tonne of capacity (2024 dollars) implies a simple multiplication of USD 402.5 billion. At USD 18,916 or USD 31,318 per annual tonne the same capacity implies different capital requirements. The full-period 19.3 Mt/y requirement is a different boundary and should not be added to the forward amount.
| Capacity boundary | Required capacity (Mt/y) | Assumed capital intensity (2024 USD per annual tonne) | AMR multiplication (2024 USD bn) |
|---|---|---|---|
| Forward capacity | 16.1 | 18916 | 304.5 |
| Forward capacity | 16.1 | 25000 | 402.5 |
| Forward capacity | 16.1 | 31318 | 504.2 |
| Full-period capacity | 19.3 | 18916 | 365.1 |
| Full-period capacity | 19.3 | 25000 | 482.5 |
| Full-period capacity | 19.3 | 31318 | 604.4 |
Payne Institute, copper investment gap · Download matching CSV
Payne Table 1 rounded source inputs. AMR multiplies millions of annual tonnes by USD per annual tonne, divided by 1,000. May differ slightly from source totals using unrounded inputs; not a project estimate or annual spend.
Each result is calculated by multiplying the rounded million-tonne annual capacity number by the stated dollars per annual tonne and dividing by 1,000 to express billions of dollars. The source's own results can differ slightly because its displayed inputs are rounded. It is not a cash-flow model: no timing of capital expenditures, financing costs, depreciation, exchange rates, operating costs, inflation, price trajectory or specific mine feasibility is assumed. The sensitivity can illustrate why the same tonnage scenario may support materially different investment figures, but it cannot predict the amount any developer will spend. Payne Institute, investment gap, Table 1.
The authors’ baseline development cost excludes sustaining capital, smelters and refineries, exploration and financing. It uses 2024 dollars and, at base, assumes full realisation of rated capacity without an escalation or overrun allowance. The 26-project average capital intensity is USD 22,359 per annual tonne. Holding that benchmark constant, the hybrid, full electrification plus grid and net-zero demand cases lead to very different forward capacity requirements. The full-period baseline is provided separately rather than added to the forward baseline.
| Scenario or period | Additional annual mine capacity (Mt/y) | Common capital intensity (2024 USD per annual tonne) | Implied development capital (2024 USD bn) |
|---|---|---|---|
| Baseline | 16.1 | 22359 | 360.0 |
| Hybrid fleet | 16.8 | 22359 | 375.6 |
| Full EV + grid | 24.7 | 22359 | 552.3 |
| Net zero | 70.7 | 22359 | 1580.8 |
| 2018–2050 full period baseline | 19.3 | 22359 | 431.5 |
Payne Institute, copper investment gap · Download matching CSV
Table 1; source rounded capacities multiplied by fixed 26-project average intensity. Excludes sustaining, refining, exploration and finance costs. Baseline is 2026 onward except clearly labeled full period.
The resulting dollar comparisons are not the cost of building an entire electrified economy. They relate to additional mine capacity within the Payne model. The model separately considers recycling, existing mine output, additions through 2025, stockpile leaching, realised utilisation and cost escalation; it does not imply that the capital-intensity assumption is known with certainty. Its source table displays USD 360 billion for the forward baseline and about USD 1.58 trillion for the net-zero scenario at the 26-project average. Payne Institute, model and Table 1.
What should an author check before describing a copper shortage?
First specify the counterfactual. A gap comparing existing and announced mines with primary requirements asks how much additional primary supply may be needed if demand develops on that path. A broader market supply shortfall can already include scrap, changes in demand, or other supply assumptions. A mine construction requirement may include replacement of depleting mines, not merely the increase from today's demand. Even the word deficit may refer to stocks and market balance within a calendar year rather than capacity needed decades from now.
S&P's January 2026 public release gives its 2040 demand headline of 42 Mt and shortfall of 10 Mt along with its trajectory and sector drivers. These figures should be attributed to that particular study, not described as a consensus or used to reconstruct sector-level quantities absent from the public release. The complete S&P scenario workbook was not used here. The cited IEA and Payne cases quantify different boundaries and years. An analyst cannot calculate a reliable average across them, since both their numerators and denominators differ. S&P Global study announcement.
Finally, consider response mechanisms without presuming their magnitude. Recycling and substitution may moderate primary requirements; additional mines, expansions, improved recovery and processing changes may add output. Ore grade changes may require additional material movement and capital for a given amount of recovered copper. These are distinct mechanisms with different time horizons, not interchangeable tonnes that can be freely credited to close the gap. The copper grade dataset quantifies that relationship under explicit recovery assumptions, while the grid metals dataset separates electricity-network copper demand from other end uses.
Methodology and sources
The expanded comparisons retain original source periods and row-level source references. Formulas, scope and precision are documented immediately beside each table, in the downloadable methods and source-cell ledger. Rounded primary values are not treated as exact unrounded observations.
AMR reviewed the IEA outlook and base case, the underlying IEA stacked chart data, the S&P Global January 8, 2026 release and the Payne Institute’s October 26, 2026 commentary. The IEA table sums demand increments by scenario and computes requirement less supply. The S&P table transcribes only the quantities and scopes stated in its public release. The Payne bridge follows the explicit mine cohorts and pipeline arithmetic. The tables retain all three producer definitions.
Glossary
- Primary requirement: Demand remaining after secondary copper supply is deducted in the IEA model.
- Secondary supply: Copper supplied from recovered materials such as scrap under the study’s accounting method.
- Stated Policies Scenario: The IEA’s STEPS demand scenario used in its 2035 headline comparison.
- Contained copper: The mass of copper in a material stream, excluding the mass of the non-copper portion.
- Mine fleet: The group of mines selected as the baseline for a forecast. Payne starts with mines operating in 2018.
- Forward baseline gap: Payne’s additional annual capacity requirement after accounting for production added since 2018.